Sally Akins is a project manager for a real-estate development company. Which of these is NOT a responsibility of hers as project manager?
(Multiple Choice)
4.7/5
(31)
The Analysis of Variance (ANOVA) is a statistical technique used to compare samples from populations to determine if they have the same mean. Which of the following cannot be done with ANOVA?
(Multiple Choice)
5.0/5
(38)
An organization realized it was having difficulty with Takt time. What basic problem existed?
(Multiple Choice)
4.9/5
(29)
A CIPM, or continuous improvement process methodology, seeks to combine the process improvement benefits of the Six Sigma method with the waste reduction benefits of lean. Continuous improvement requires several conditions in order to be implemented within an organization. Which of the following is NOT included in these requirements?
(Multiple Choice)
4.9/5
(30)
Process and design FMEA identifies and evaluates the potential failures of a process, product, or service. How is the risk priority number calculated?
(Multiple Choice)
4.8/5
(40)
When identifying root causes, several tools can be used to resolve chronic problems. Which tool would you use to rank causes from most significant to least significant?
(Multiple Choice)
4.7/5
(37)
Which of the following is a methodology or practice that provides tools to improve the capability of business processes, increase performance, and decrease process variation?
(Multiple Choice)
4.8/5
(44)
Which part of the Deming Cycle includes carrying out a test of change on a small scale?
(Multiple Choice)
4.8/5
(41)
Economies of flow are commonly used to design services versus products. What is "failure demand" in economies of flow?
(Multiple Choice)
4.8/5
(31)
Six Sigma green and black belts should be skilled in five areas, which include project management, leadership, analytical thinking, organizational change management, and __________.
(Multiple Choice)
4.9/5
(34)
Which technique would a continuous improvement team use for balancing production throughput over time?
(Multiple Choice)
4.9/5
(39)
Which type of waste causes fluctuation in performance in a manufacturing environment?
(Multiple Choice)
4.9/5
(36)
Standard deviation helps to determine the variability of some processes. Which choice explains how the standard deviation of a process would be calculated?
(Multiple Choice)
4.8/5
(36)
A laminate processing plant has a high level of Muri. What does that mean for employees?
(Multiple Choice)
4.9/5
(33)
Which of these choices is an example of an internal cost related to an improvement?
(Multiple Choice)
4.8/5
(30)
The second part of Jidoka includes separating the man from the machine. What is the goal of the separation of man from the machine?
(Multiple Choice)
4.9/5
(39)
Which process improvement diagram, picture, or chart would a lean team use to show if the improvements implemented in a project are improving over time?
(Multiple Choice)
4.8/5
(27)
Which level of sigma results in 6,210 defective parts per million?
(Multiple Choice)
4.7/5
(37)
Design for Manufacturability is a team approach to develop production costs and the best options for the error free production of a product. Which of the following is NOT included in the steps of the Design for Manufacturability process?
(Multiple Choice)
4.8/5
(45)
Visual signs are encouraged in the workplace in lean environments. What would be a visual sign for process measures?
(Multiple Choice)
4.9/5
(36)