Exam 16: Lean Systems
Exam 1: Operations Management63 Questions
Exam 2: Quality Management71 Questions
Exam 3: Statistical Quality Control111 Questions
Exam 4: Product Design75 Questions
Exam 5: Service Design79 Questions
Exam 6: Processes and Technology61 Questions
Exam 17: Scheduling80 Questions
Exam 7: Capacity and Facilities83 Questions
Exam 8: Human Resources79 Questions
Exam 9: Project Management85 Questions
Exam 10: Supply Chain Management: Strategy and Design56 Questions
Exam 11: Global Supply Chain Procurement and Distribution69 Questions
Exam 12: Forecasting85 Questions
Exam 13: Inventory Management78 Questions
Exam 13: Operational Decision-Making Tools: Simulation22 Questions
Exam 14: Operational Decision-Making Tools: Linear Programming29 Questions
Exam 14: The Sales and Operations Planning Process76 Questions
Exam 15: Resource Planning82 Questions
Exam 16: Lean Systems79 Questions
Exam 18: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 19: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 20: Decision-Making Tools: Facility Location Models23 Questions
Exam 21: Operational Decision-Making Tools: Work Measurement31 Questions
Select questions type
___________ is generally credited with the development of lean production.
(Multiple Choice)
4.8/5
(37)
In lean production,waste is defined as anything that does not add value to the product.
(True/False)
4.9/5
(31)
Which of the following is not a basic element of lean production?
(Multiple Choice)
4.9/5
(36)
Total productive maintenance combines preventive maintenance with kaizen.
(True/False)
4.8/5
(33)
Small-lot production reduces lead time but increases quality problems.
(True/False)
4.9/5
(39)
Early adopters of lean production in the U.S.were unsuccessful because they tried to implement lean by slashing inventories and forcing their suppliers to make more frequent deliveries.
(True/False)
4.9/5
(42)
Analyzing process flow and eliminating waste is referred to as
(Multiple Choice)
4.8/5
(33)
Setup time is not a component of the cumulative lead time for a manufactured product.
(True/False)
4.9/5
(43)
Poka-yolk is a Japanese term used to describe the removal of waste in a lean production system.
(True/False)
4.8/5
(38)
______________ setups that can be performed in advance while the machine is running.
(Multiple Choice)
4.8/5
(39)
In a lean production system,kanban systems have been shown to handle large fluctuations in the production requirements on the final assembly line.
(True/False)
4.8/5
(31)
Which of the following is not a benefit of lean production?
(Multiple Choice)
4.8/5
(39)
A workstation's output is 200 bottles of wine per hour.It takes 30 minutes to receive a withdrawal kanban of corks from the previous workstation.The withdrawal kanban is attached to a container holding 30 corks.The process uses a safety factor of 20 percent.What is the number of withdrawal kanbans needed to support the bottling process?
(Multiple Choice)
4.7/5
(33)
Lean concepts cannot be applied to services because services are intangible.
(True/False)
4.7/5
(38)
A workstation must produce 400 units an hour.It takes 24 minutes to receive the necessary material for production from the previous workstation.Output is moved between workstations in containers holding 44 units.If the process uses a safety factor of 10%,then the number of kanbans that should be circulating between this workstation and the previous workstation is
(Multiple Choice)
4.7/5
(35)
A workstation's output is 200 bottles of wine per hour.It takes 45 minutes to receive a withdrawal kanban of corks from the previous workstation.The withdrawal kanban is attached to a container holding 30 corks.The process uses a safety factor of 20 percent.What is the number of withdrawal kanbans needed to support the bottling process.
(Multiple Choice)
4.7/5
(32)