Exam 16: Lean Systems
Exam 1: Introduction to Operations and Supply Chain Management74 Questions
Exam 2: Quality Management86 Questions
Exam 3: Statistical Process Control161 Questions
Exam 4: Product Design81 Questions
Exam 5: Service Design77 Questions
Exam 6: Processes and Technology48 Questions
Exam 7: Capacity and Facilities Design90 Questions
Exam 8: Human Resources85 Questions
Exam 9: Project Management98 Questions
Exam 10: Supply Chain Management Strategy and Design73 Questions
Exam 11: Global Supply Chain Procurement and Distribution96 Questions
Exam 12: Forecasting99 Questions
Exam 13: Inventory Management25 Questions
Exam 14: Sales and Operations Planning34 Questions
Exam 15: Resource Planning86 Questions
Exam 16: Lean Systems99 Questions
Exam 17: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 18: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 19: Operational Decision-Making Tools: Facility Location Models23 Questions
Exam 20: Operational Decision-Making Tools: Work Measurement29 Questions
Exam 21: Operational Decison-Making Tools: Transportation and Transshipment Models102 Questions
Exam 22: Operational Decision-Making Tools: Simulation84 Questions
Exam 23: Operational Decision-Making Tools: Linear Programming92 Questions
Select questions type
The following set of jobs must be processed serially through a two-step system. The times at each process are in hours. If Johnson's Rule is used to sequence the jobs then Job C would start processing on operation 2 at 

(Multiple Choice)
4.8/5
(33)
If the following jobs are sequenced according to the LPT rule then the mean tardiness (in days) for all jobs is (assume zero for today's date) 

(Multiple Choice)
4.8/5
(40)
If the following jobs are sequenced according to the SPT rule then the mean completion time (in days) for all jobs is (assume zero for today's date) 

(Multiple Choice)
4.9/5
(39)
If the following jobs are sequenced according to the DDATE rule then the total number of jobs that would be late is (assume zero for today's date) 

(Multiple Choice)
4.9/5
(40)
Four products (1, 2, 3, and 4) must be processed on one of four machines (A, B, C, and D). The times required in minutes for each product on each machine are shown below.
If management wishes to assign products to machines so that the total time to complete all the products is minimized, then Product 4 is assigned to

(Multiple Choice)
4.8/5
(38)
Managers typically use multiple objective when constructing a schedule.
(True/False)
4.9/5
(42)
The time required to complete a group of jobs is referred to as
(Multiple Choice)
4.9/5
(39)
The sequencing rule that will minimize average job completion time for a set number of jobs to be processed on one machine is
(Multiple Choice)
4.9/5
(42)
The longest processing time (LPT) rule tends to complete larger jobs in-house when subcontracting is anticipated.
(True/False)
4.9/5
(30)
Scheduling using the theory of constraints (TOC) requires that process batch sizes and transfer batch sizes always match.
(True/False)
4.7/5
(31)
If the following jobs are sequenced according to the SLACK rule then the mean completion time (in days) for all jobs is (assume zero for today's date) 

(Multiple Choice)
4.7/5
(36)
The scheduling function for mass production and job shop production are basically the same.
(True/False)
4.8/5
(41)
A manufacturing execution system is software that uses intelligent analytical tools and techniques to develop realistic schedules.
(True/False)
4.8/5
(33)
Which of the following is a possible objective in constructing a schedule.
(Multiple Choice)
4.8/5
(36)
If the following jobs are sequenced according to the SPT rule then the maximum job tardiness (in days) is (assume zero for today's date) 

(Multiple Choice)
4.9/5
(38)
The assignment method of linear programming can be used to determine the best allocation of jobs to machines or workers to tasks.
(True/False)
4.8/5
(25)
The following set of jobs must be processed serially through a two-step system. If Johnson's Rule is used to sequence the jobs then the order in which the jobs would be performed is 

(Multiple Choice)
4.9/5
(31)
If the following jobs are sequenced according to the SPT rule then the total number of jobs that would be late is (assume zero for today's date) 

(Multiple Choice)
4.8/5
(32)
A______________ monitors work status, machine status, material usage, and availability.
(Multiple Choice)
4.9/5
(48)
Four products (1, 2, 3, and 4) must be processed on one of four machines (A, B, C, and D). The times required in minutes for each product on each machine are shown below.
The minimum time required to complete all the products is

(Multiple Choice)
4.8/5
(37)
Showing 61 - 80 of 99