Deck 23: Flexible Budgets and Standard Costs

Full screen (f)
exit full mode
Question
A fixed budget performance report never provides useful information for evaluating variances.
Use Space or
up arrow
down arrow
to flip the card.
Question
Standard costs are preset costs for delivering a product or service under normal conditions.
Question
A flexible budget is based on a single predicted amount of sales or other activity measure.
Question
Variable budget is another name for a flexible budget.
Question
A cost variance equals the difference between the quantity variance and the price variance.
Question
Cost variances are ignored under management by exception.
Question
A cost variance is the difference between actual cost and standard cost.
Question
While companies strive to achieve ideal standards,reality implies that some loss of materials usually occurs with any process.
Question
A variable or flexible budget is so named because it only focuses on variable costs.
Question
Within the same flexible budget performance report,it is impossible to have both favorable and unfavorable variances.
Question
Management by exception means that managers focus on the most significant differences between actual costs and standard costs.
Question
When standard costs are used,factory overhead is assigned to products with a predetermined standard overhead rate.
Question
Standard material costs,standard labor costs,and standard overhead costs can be obtained from standard cost tables published by the Institute of Management Accountants.
Question
Fixed budget performance reports compare actual results with the results expected under a fixed budget.
Question
Another name for a static budget is a variable budget.
Question
Fixed budgets are also known as flexible budgets.
Question
Companies promoting continuous improvement strive to achieve practical standards rather than ideal standards.
Question
A budget performance report shows budgeted amounts,actual amounts,and differences between budgeted and actual amounts.
Question
Standard costs can be used by management to assess the reasonableness of actual costs incurred.
Question
When computing a price variance,the price is held constant.
Question
Which of the following is not part of the flow of events in variance analysis:

A)Preparing a standard cost performance report.
B)Identifying questions and their explanations.
C)Taking corrective and strategic actions.
D)Computing and analyzing variances.
E)Working to ensure that all variances are favorable.
Question
The total sales variance can be divided into the sales price variance and the sales volume variance.
Question
A favorable direct materials price variance might lead to an unfavorable direct materials quantity variance because the company purchased inferior materials.
Question
A flexible budget expresses all costs on a per unit basis,regardless of cost behavior.
Question
Standard costs are:

A)Actual costs incurred to produce a specific product or perform a service.
B)Preset costs for delivering a product or service under normal conditions.
C)Established by the IMA.
D)Rarely achieved.
E)Uniform among companies within an industry.
Question
The purchasing department is usually responsible for the price paid for materials.
Question
The anticipated costs incurred under normal conditions to produce a specific product or to perform a specific service are:

A)Variable costs.
B)Fixed costs.
C)Standard costs.
D)Product costs.
E)Period costs.
Question
The difference between the actual cost incurred and the standard cost is called the:

A)Flexible variance.
B)Price variance.
C)Cost variance.
D)Controllable variance.
E)Volume variance.
Question
In sales variance analysis,the budgeted amount of unit sales is the predicted activity level and the budgeted cost of the goods sold can be treated as a "standard" price.
Question
An unfavorable variance is recorded with a debit because it reflects additional costs higher than the standard cost.
Question
A volume variance is the difference between overhead at maximum volume of production and the standard volume of production.
Question
A direct labor cost variance can be divided into price and quantity variances,which are almost always called controllable and volume variances.
Question
The difference between actual price per unit of input and the standard price per unit of input results in a:

A)Standard variance.
B)Quantity variance.
C)Volume variance.
D)Controllable variance.
E)Price variance.
Question
A flexible budget expresses variable costs on a per unit basis and fixed costs on a total basis.
Question
An overhead cost variance is the difference between the total overhead actually incurred for the period and the standard overhead applied to products.
Question
Although a fixed budget is only useful over the relevant range of operations,a flexible budget is useful over all possible production levels.
Question
One possible explanation for direct labor rate and efficiency variances is the use of workers with different skill levels.
Question
The difference between actual quantity of input used and the standard quantity of input used results in a:

A)Controllable variance.
B)Standard variance.
C)Budget variance.
D)Quantity variance.
E)Price variance.
Question
If ending variances account balances are material,they should always be closed directly to Cost of Goods Sold.
Question
When the actual cost of direct materials used exceeds the standard cost,the company must have experienced an unfavorable direct materials price variance.
Question
A company's flexible budget for 12,000 units of production showed sales,$48,000;variable costs,$18,000;and fixed costs,$16,000.The operating income expected if the company produces and sells 16,000 units is:

A)$2,667.
B)$14,000.
C)$18,667.
D)$24,000.
E)$35,000.
Question
Variable budget is another name for:

A)Cash budget.
B)Flexible budget.
C)Fixed budget.
D)Manufacturing budget.
E)Rolling budget.
Question
Standard costs are used in the calculation of:

A)Price and quantity variances.
B)Price variances only.
C)Quantity variances only.
D)Price,quantity,and sales variances.
E)Quantity and sales variances.
Question
Based on predicted production of 12,000 units,a company anticipates $150,000 of fixed costs and $123,000 of variable costs.The flexible budget amounts of fixed and variable costs for 10,000 units are:

A)$125,000 fixed and $102,500 variable.
B)$125,000 fixed and $123,000 variable.
C)$102,500 fixed and $150,000 variable.
D)$150,000 fixed and $123,000 variable.
E)$150,000 fixed and $102,500 variablE.Fixed costs remain at $150,000
Question
Product A has a sales price of $10 per unit.Based on a 10,000-unit production level,the variable costs are $6 per unit and the fixed costs are $3 per unit.Using a flexible budget for 12,500 units,what is the budgeted operating income from Product A?

A)$12,500.
B)$25,000.
C)$20,000.
D)$30,000.
E)$35,000.
Question
A budget based on several different levels of activity,often including both a best-case and worst-case scenario,is called a:

A)Rolling budget.
B)Production budget.
C)Flexible budget.
D)Merchandise purchases budget.
E)Fixed budget.
Question
Based on a predicted level of production and sales of 22,000 units,a company anticipates total variable costs of $99,000,fixed costs of $30,000,and operating income of $36,000.Based on this information,the budgeted amount of sales for 20,000 units would be:

A)$165,000.
B)$150,000.
C)$117,272.
D)$181,500.
E)$141,900.
Question
A company's flexible budget for 10,000 units of production reflects sales of $200,000;variable costs of $40,000;and fixed costs of $75,000.Calculate the expected level of operating income if the company produces and sells 13,000 units.

A)$110,500.
B)$85,000.
C)$133,000.
D)$100,000.
E)$50,500.
Question
An analytical technique used by management to focus attention on the most significant variances and give less attention to the areas where performance is reasonably close to standard is known as:

A)Controllable management.
B)Management by variance.
C)Performance management.
D)Management by objectives.
E)Management by exception.
Question
An internal report that helps management analyze the difference between actual performance and budgeted performance based on the actual sales volume (or other level of activity)is called a(n):

A)Sales budget performance report.
B)Flexible budget performance report.
C)Master budget performance report.
D)Static budget performance report.
E)Operating budget performance report.
Question
A flexible budget performance report compares the differences between:

A)Actual performance and budgeted performance based on actual sales volume.
B)Actual performance over several periods.
C)Budgeted performance over several periods.
D)Actual performance and budgeted performance based on budgeted sales volume.
E)Actual performance and standard costs at the budgeted sales volume.
Question
Identify the situation below that will result in a favorable variance.

A)Actual revenue is higher than budgeted revenue.
B)Actual revenue is lower than budgeted revenue.
C)Actual income is lower than expected income.
D)Actual costs are higher than budgeted costs.
E)Actual expenses are higher than budgeted expenses.
Question
A company provided the following direct materials cost information.Compute the cost variance. <strong>A company provided the following direct materials cost information.Compute the cost variance.  </strong> A)$2,500 Favorable. B)$78,250 Favorable. C)$78,250 Unfavorable. D)$80,750 Favorable. E)$80,750 UnfavorablE.Actual cost $888,250 - Standard cost $810,000 = $78,250 U <div style=padding-top: 35px>

A)$2,500 Favorable.
B)$78,250 Favorable.
C)$78,250 Unfavorable.
D)$80,750 Favorable.
E)$80,750 UnfavorablE.Actual cost $888,250 - Standard cost $810,000 = $78,250 U
Question
A flexible budget may be prepared:

A)Before the operating period only.
B)After the operating period only.
C)During the operating period only.
D)At any time in the planning period.
E)Only when the company encounters excessive costs.
Question
A company's flexible budget for 12,000 units of production showed total contribution margin of $24,000 and fixed costs,$16,000.The operating income expected if the company produces and sells 15,000 units is:

A)$34,000.
B)$10,000.
C)$18,667.
D)$8,000.
E)$14,000.
Question
Sales variance analysis is used by managers for:

A)Planning purposes only.
B)Budgeting purposes only.
C)Control purposes only.
D)Planning and control purposes.
E)Planning and budgeting purposes.
Question
Static budget is another name for:

A)Standard budget.
B)Flexible budget.
C)Variable budget.
D)Fixed budget.
E)Master budget.
Question
In this type of control system,the master budget is based on a single prediction for sales volume,and the budgeted amount for each cost essentially assumes that a specific amount of sales will occur:

A)Sales budget.
B)Standard budget.
C)Flexible budget.
D)Fixed budget.
E)Variable budget.
Question
Based on a predicted level of production and sales of 12,000 units,a company anticipates reporting operating income of $26,000 after deducting variable costs of $72,000 and fixed costs of $10,000.Based on this information,the budgeted amounts of fixed and variable costs for 15,000 units would be:

A)$10,000 of fixed costs and $72,000 of variable costs.
B)$10,000 of fixed costs and $90,000 of variable costs.
C)$12,500 of fixed costs and $90,000 of variable costs.
D)$12,500 of fixed costs and $72,000 of variable costs.
E)$10,000 of fixed costs and $81,000 of variable costs.
Question
A company's flexible budget for 12,000 units of production showed per unit contribution margin of $3.00 and fixed costs,$20,000.The operating income expected if the company produces and sells 18,000 units is:

A)$34,000.
B)$10,000.
C)$18,667.
D)$16,000.
E)$24,000.
Question
Based on a predicted level of production and sales of 30,000 units,a company anticipates total contribution margin of $105,000,fixed costs of $40,000,and operating income of $52,000.Based on this information,the budgeted operating income for 28,000 units would be:

A)$52,000.
B)$135,333.
C)$58,000.
D)$72,500.
E)$105,000.
Question
The following company information is available for March.The direct materials price variance is: <strong>The following company information is available for March.The direct materials price variance is:  </strong> A)$5,000 favorable. B)$300 favorable. C)$5,200 unfavorable. D)$5,000 unfavorable. E)$5,200 favorablE. <div style=padding-top: 35px>

A)$5,000 favorable.
B)$300 favorable.
C)$5,200 unfavorable.
D)$5,000 unfavorable.
E)$5,200 favorablE.
Question
Hassock Corp.produces woven wall hangings.It takes 2 hours of direct labor to produce a single wall hanging.Bartels' standard labor cost is $12 per hour.During August,Bartels produced 10,000 units and used 21,040 hours of direct labor at a total cost of $250,376.What is Bartels' labor efficiency variance for August?

A)$12,480 favorable.
B)$10,376 unfavorable.
C)$14,584 unfavorable.
D)$4,160 favorable.
E)$12,480 unfavorablE.
Question
The following company information is available.The direct materials quantity variance is: <strong>The following company information is available.The direct materials quantity variance is:  </strong> A)$10,000 unfavorable. B)$13,200 unfavorable. C)$9,600 unfavorable. D)$10,000 favorable. E)$13,200 favorablE. <div style=padding-top: 35px>

A)$10,000 unfavorable.
B)$13,200 unfavorable.
C)$9,600 unfavorable.
D)$10,000 favorable.
E)$13,200 favorablE.
Question
Use the following data to find the direct labor rate variance if the company produced 3,500 units during the period. <strong>Use the following data to find the direct labor rate variance if the company produced 3,500 units during the period.  </strong> A)$6,125 unfavorable. B)$7,000 unfavorable. C)$7,000 favorable. D)$12,250 favorable. E)$6,125 favorablE. <div style=padding-top: 35px>

A)$6,125 unfavorable.
B)$7,000 unfavorable.
C)$7,000 favorable.
D)$12,250 favorable.
E)$6,125 favorablE.
Question
Use the following data to find the total direct labor cost variance if the company produced 3,500 units during the period. <strong>Use the following data to find the total direct labor cost variance if the company produced 3,500 units during the period.  </strong> A)$6,125 unfavorable. B)$7,000 unfavorable. C)$7,000 favorable. D)$12,250 favorable. E)$6,125 favorablE. <div style=padding-top: 35px>

A)$6,125 unfavorable.
B)$7,000 unfavorable.
C)$7,000 favorable.
D)$12,250 favorable.
E)$6,125 favorablE.
Question
Summerlin Company budgeted 4,000 pounds of material costing $5.00 per pound to produce 2,000 units.The company actually used 4,500 pounds that cost $5.10 per pound to produce 2,000 units.What is the direct materials price variance?

A)$400 unfavorable.
B)$450 unfavorable.
C)$2,500 unfavorable.
D)$2,550 unfavorable.
E)$2,950 unfavorablE.
Question
Georgia,Inc.has collected the following data on one of its products.The direct materials quantity variance is: <strong>Georgia,Inc.has collected the following data on one of its products.The direct materials quantity variance is:  </strong> A)$30,000 favorable. B)$13,750 unfavorable. C)$16,250 favorable. D)$30,000 unfavorable. E)$13,750 favorablE. <div style=padding-top: 35px>

A)$30,000 favorable.
B)$13,750 unfavorable.
C)$16,250 favorable.
D)$30,000 unfavorable.
E)$13,750 favorablE.
Question
Parallel Enterprises has collected the following data on one of its products.During the period the company produced 25,000 units.The direct materials price variance is: <strong>Parallel Enterprises has collected the following data on one of its products.During the period the company produced 25,000 units.The direct materials price variance is:  </strong> A)$27,500 unfavorable. B)$50,000 unfavorable. C)$50,000 favorable. D)$22,500 unfavorable. E)$22,500 favorablE. <div style=padding-top: 35px>

A)$27,500 unfavorable.
B)$50,000 unfavorable.
C)$50,000 favorable.
D)$22,500 unfavorable.
E)$22,500 favorablE.
Question
Georgia Inc. ,has collected the following data on one of its products.The actual cost of the direct materials used is: <strong>Georgia Inc. ,has collected the following data on one of its products.The actual cost of the direct materials used is:  </strong> A)$133,750. B)$150,000. C)$106,250. D)$158,750. E)$120,000. <div style=padding-top: 35px>

A)$133,750.
B)$150,000.
C)$106,250.
D)$158,750.
E)$120,000.
Question
A company has established 5 pounds of Material J at $2 per pound as the standard for the material in its Product Z.The company has just produced 1,000 units of this product,using 5,200 pounds of Material J that cost $9,880.The direct materials price variance is:

A)$520 unfavorable.
B)$400 unfavorable.
C)$120 favorable.
D)$520 favorable.
E)$400 favorablE.
Question
Parallel Enterprises has collected the following data on one of its products.During the period the company produced 25,000 units.The direct materials quantity variance is: <strong>Parallel Enterprises has collected the following data on one of its products.During the period the company produced 25,000 units.The direct materials quantity variance is:  </strong> A)$27,500 unfavorable. B)$50,000 unfavorable. C)$50,000 favorable. D)$22,500 unfavorable. E)$22,500 favorablE. <div style=padding-top: 35px>

A)$27,500 unfavorable.
B)$50,000 unfavorable.
C)$50,000 favorable.
D)$22,500 unfavorable.
E)$22,500 favorablE.
Question
A job was budgeted to require 3 hours of labor per unit at $8.00 per hour.The job consisted of 8,000 units and was completed in 22,000 hours at a total labor cost of $198,000.What is the total labor cost variance?

A)$2,000 unfavorable.
B)$3,000 unfavorable.
C)$6,000 unfavorable.
D)$8,000 unfavorable.
E)$9,000 unfavorablE.
Question
Use the following data to find the direct labor efficiency variance if the company produced 3,500 units during the period. <strong>Use the following data to find the direct labor efficiency variance if the company produced 3,500 units during the period.  </strong> A)$6,125 unfavorable. B)$7,000 unfavorable. C)$7,000 favorable. D)$12,250 favorable. E)$6,125 favorablE. <div style=padding-top: 35px>

A)$6,125 unfavorable.
B)$7,000 unfavorable.
C)$7,000 favorable.
D)$12,250 favorable.
E)$6,125 favorablE.
Question
A company has established 5 pounds of Material J at $2 per pound as the standard for the material in its Product Z.The company has just produced 1,000 units of this product,using 5,200 pounds of Material J that cost $9,880.The direct materials quantity variance is:

A)$400 unfavorable.
B)$120 favorable.
C)$400 favorable.
D)$520 favorable.
E)$520 unfavorablE.
Question
Hassock Corp.produces woven wall hangings.It takes 2 hours of direct labor to produce a single wall hanging.Bartels' standard labor cost is $12 per hour.During August,Bartels produced 10,000 units and used 21,040 hours of direct labor at a total cost of $250,376.What is Bartels' labor rate variance for August?

A)$2,000 favorable.
B)$2,104 unfavorable.
C)$2,104 favorable.
D)$4,160 favorable.
E)$2,000 unfavorablE.
Question
Which department is often responsible for the direct materials price variance?

A)The accounting department.
B)The production department.
C)The purchasing department.
D)The finance department.
E)The budgeting department.
Question
Summerlin Company budgeted 4,000 pounds of material costing $5.00 per pound to produce 2,000 units.The company actually used 4,500 pounds that cost $5.10 per pound to produce 2,000 units.What is the direct materials quantity variance?

A)$400 unfavorable.
B)$450 unfavorable.
C)$2,500 unfavorable.
D)$2,550 unfavorable.
E)$2,950 unfavorablE.
Question
Georgia,Inc.has collected the following data on one of its products.The direct materials price variance is: <strong>Georgia,Inc.has collected the following data on one of its products.The direct materials price variance is:  </strong> A)$13,750 unfavorable. B)$16,250 unfavorable. C)$16,250 favorable. D)$30,000 unfavorable. E)$33,000 favorablE. <div style=padding-top: 35px>

A)$13,750 unfavorable.
B)$16,250 unfavorable.
C)$16,250 favorable.
D)$30,000 unfavorable.
E)$33,000 favorablE.
Question
Use the following data to find the direct labor rate variance if the company produced 7,000 units of product during the period. <strong>Use the following data to find the direct labor rate variance if the company produced 7,000 units of product during the period.  </strong> A)$12,250 unfavorable. B)$14,700 unfavorable. C)$14,700 favorable. D)$12,250 favorable. E)$26,950 favorablE. <div style=padding-top: 35px>

A)$12,250 unfavorable.
B)$14,700 unfavorable.
C)$14,700 favorable.
D)$12,250 favorable.
E)$26,950 favorablE.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/177
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 23: Flexible Budgets and Standard Costs
1
A fixed budget performance report never provides useful information for evaluating variances.
False
2
Standard costs are preset costs for delivering a product or service under normal conditions.
True
3
A flexible budget is based on a single predicted amount of sales or other activity measure.
False
4
Variable budget is another name for a flexible budget.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
5
A cost variance equals the difference between the quantity variance and the price variance.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
6
Cost variances are ignored under management by exception.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
7
A cost variance is the difference between actual cost and standard cost.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
8
While companies strive to achieve ideal standards,reality implies that some loss of materials usually occurs with any process.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
9
A variable or flexible budget is so named because it only focuses on variable costs.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
10
Within the same flexible budget performance report,it is impossible to have both favorable and unfavorable variances.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
11
Management by exception means that managers focus on the most significant differences between actual costs and standard costs.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
12
When standard costs are used,factory overhead is assigned to products with a predetermined standard overhead rate.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
13
Standard material costs,standard labor costs,and standard overhead costs can be obtained from standard cost tables published by the Institute of Management Accountants.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
14
Fixed budget performance reports compare actual results with the results expected under a fixed budget.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
15
Another name for a static budget is a variable budget.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
16
Fixed budgets are also known as flexible budgets.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
17
Companies promoting continuous improvement strive to achieve practical standards rather than ideal standards.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
18
A budget performance report shows budgeted amounts,actual amounts,and differences between budgeted and actual amounts.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
19
Standard costs can be used by management to assess the reasonableness of actual costs incurred.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
20
When computing a price variance,the price is held constant.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
21
Which of the following is not part of the flow of events in variance analysis:

A)Preparing a standard cost performance report.
B)Identifying questions and their explanations.
C)Taking corrective and strategic actions.
D)Computing and analyzing variances.
E)Working to ensure that all variances are favorable.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
22
The total sales variance can be divided into the sales price variance and the sales volume variance.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
23
A favorable direct materials price variance might lead to an unfavorable direct materials quantity variance because the company purchased inferior materials.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
24
A flexible budget expresses all costs on a per unit basis,regardless of cost behavior.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
25
Standard costs are:

A)Actual costs incurred to produce a specific product or perform a service.
B)Preset costs for delivering a product or service under normal conditions.
C)Established by the IMA.
D)Rarely achieved.
E)Uniform among companies within an industry.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
26
The purchasing department is usually responsible for the price paid for materials.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
27
The anticipated costs incurred under normal conditions to produce a specific product or to perform a specific service are:

A)Variable costs.
B)Fixed costs.
C)Standard costs.
D)Product costs.
E)Period costs.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
28
The difference between the actual cost incurred and the standard cost is called the:

A)Flexible variance.
B)Price variance.
C)Cost variance.
D)Controllable variance.
E)Volume variance.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
29
In sales variance analysis,the budgeted amount of unit sales is the predicted activity level and the budgeted cost of the goods sold can be treated as a "standard" price.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
30
An unfavorable variance is recorded with a debit because it reflects additional costs higher than the standard cost.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
31
A volume variance is the difference between overhead at maximum volume of production and the standard volume of production.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
32
A direct labor cost variance can be divided into price and quantity variances,which are almost always called controllable and volume variances.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
33
The difference between actual price per unit of input and the standard price per unit of input results in a:

A)Standard variance.
B)Quantity variance.
C)Volume variance.
D)Controllable variance.
E)Price variance.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
34
A flexible budget expresses variable costs on a per unit basis and fixed costs on a total basis.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
35
An overhead cost variance is the difference between the total overhead actually incurred for the period and the standard overhead applied to products.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
36
Although a fixed budget is only useful over the relevant range of operations,a flexible budget is useful over all possible production levels.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
37
One possible explanation for direct labor rate and efficiency variances is the use of workers with different skill levels.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
38
The difference between actual quantity of input used and the standard quantity of input used results in a:

A)Controllable variance.
B)Standard variance.
C)Budget variance.
D)Quantity variance.
E)Price variance.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
39
If ending variances account balances are material,they should always be closed directly to Cost of Goods Sold.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
40
When the actual cost of direct materials used exceeds the standard cost,the company must have experienced an unfavorable direct materials price variance.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
41
A company's flexible budget for 12,000 units of production showed sales,$48,000;variable costs,$18,000;and fixed costs,$16,000.The operating income expected if the company produces and sells 16,000 units is:

A)$2,667.
B)$14,000.
C)$18,667.
D)$24,000.
E)$35,000.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
42
Variable budget is another name for:

A)Cash budget.
B)Flexible budget.
C)Fixed budget.
D)Manufacturing budget.
E)Rolling budget.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
43
Standard costs are used in the calculation of:

A)Price and quantity variances.
B)Price variances only.
C)Quantity variances only.
D)Price,quantity,and sales variances.
E)Quantity and sales variances.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
44
Based on predicted production of 12,000 units,a company anticipates $150,000 of fixed costs and $123,000 of variable costs.The flexible budget amounts of fixed and variable costs for 10,000 units are:

A)$125,000 fixed and $102,500 variable.
B)$125,000 fixed and $123,000 variable.
C)$102,500 fixed and $150,000 variable.
D)$150,000 fixed and $123,000 variable.
E)$150,000 fixed and $102,500 variablE.Fixed costs remain at $150,000
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
45
Product A has a sales price of $10 per unit.Based on a 10,000-unit production level,the variable costs are $6 per unit and the fixed costs are $3 per unit.Using a flexible budget for 12,500 units,what is the budgeted operating income from Product A?

A)$12,500.
B)$25,000.
C)$20,000.
D)$30,000.
E)$35,000.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
46
A budget based on several different levels of activity,often including both a best-case and worst-case scenario,is called a:

A)Rolling budget.
B)Production budget.
C)Flexible budget.
D)Merchandise purchases budget.
E)Fixed budget.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
47
Based on a predicted level of production and sales of 22,000 units,a company anticipates total variable costs of $99,000,fixed costs of $30,000,and operating income of $36,000.Based on this information,the budgeted amount of sales for 20,000 units would be:

A)$165,000.
B)$150,000.
C)$117,272.
D)$181,500.
E)$141,900.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
48
A company's flexible budget for 10,000 units of production reflects sales of $200,000;variable costs of $40,000;and fixed costs of $75,000.Calculate the expected level of operating income if the company produces and sells 13,000 units.

A)$110,500.
B)$85,000.
C)$133,000.
D)$100,000.
E)$50,500.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
49
An analytical technique used by management to focus attention on the most significant variances and give less attention to the areas where performance is reasonably close to standard is known as:

A)Controllable management.
B)Management by variance.
C)Performance management.
D)Management by objectives.
E)Management by exception.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
50
An internal report that helps management analyze the difference between actual performance and budgeted performance based on the actual sales volume (or other level of activity)is called a(n):

A)Sales budget performance report.
B)Flexible budget performance report.
C)Master budget performance report.
D)Static budget performance report.
E)Operating budget performance report.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
51
A flexible budget performance report compares the differences between:

A)Actual performance and budgeted performance based on actual sales volume.
B)Actual performance over several periods.
C)Budgeted performance over several periods.
D)Actual performance and budgeted performance based on budgeted sales volume.
E)Actual performance and standard costs at the budgeted sales volume.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
52
Identify the situation below that will result in a favorable variance.

A)Actual revenue is higher than budgeted revenue.
B)Actual revenue is lower than budgeted revenue.
C)Actual income is lower than expected income.
D)Actual costs are higher than budgeted costs.
E)Actual expenses are higher than budgeted expenses.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
53
A company provided the following direct materials cost information.Compute the cost variance. <strong>A company provided the following direct materials cost information.Compute the cost variance.  </strong> A)$2,500 Favorable. B)$78,250 Favorable. C)$78,250 Unfavorable. D)$80,750 Favorable. E)$80,750 UnfavorablE.Actual cost $888,250 - Standard cost $810,000 = $78,250 U

A)$2,500 Favorable.
B)$78,250 Favorable.
C)$78,250 Unfavorable.
D)$80,750 Favorable.
E)$80,750 UnfavorablE.Actual cost $888,250 - Standard cost $810,000 = $78,250 U
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
54
A flexible budget may be prepared:

A)Before the operating period only.
B)After the operating period only.
C)During the operating period only.
D)At any time in the planning period.
E)Only when the company encounters excessive costs.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
55
A company's flexible budget for 12,000 units of production showed total contribution margin of $24,000 and fixed costs,$16,000.The operating income expected if the company produces and sells 15,000 units is:

A)$34,000.
B)$10,000.
C)$18,667.
D)$8,000.
E)$14,000.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
56
Sales variance analysis is used by managers for:

A)Planning purposes only.
B)Budgeting purposes only.
C)Control purposes only.
D)Planning and control purposes.
E)Planning and budgeting purposes.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
57
Static budget is another name for:

A)Standard budget.
B)Flexible budget.
C)Variable budget.
D)Fixed budget.
E)Master budget.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
58
In this type of control system,the master budget is based on a single prediction for sales volume,and the budgeted amount for each cost essentially assumes that a specific amount of sales will occur:

A)Sales budget.
B)Standard budget.
C)Flexible budget.
D)Fixed budget.
E)Variable budget.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
59
Based on a predicted level of production and sales of 12,000 units,a company anticipates reporting operating income of $26,000 after deducting variable costs of $72,000 and fixed costs of $10,000.Based on this information,the budgeted amounts of fixed and variable costs for 15,000 units would be:

A)$10,000 of fixed costs and $72,000 of variable costs.
B)$10,000 of fixed costs and $90,000 of variable costs.
C)$12,500 of fixed costs and $90,000 of variable costs.
D)$12,500 of fixed costs and $72,000 of variable costs.
E)$10,000 of fixed costs and $81,000 of variable costs.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
60
A company's flexible budget for 12,000 units of production showed per unit contribution margin of $3.00 and fixed costs,$20,000.The operating income expected if the company produces and sells 18,000 units is:

A)$34,000.
B)$10,000.
C)$18,667.
D)$16,000.
E)$24,000.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
61
Based on a predicted level of production and sales of 30,000 units,a company anticipates total contribution margin of $105,000,fixed costs of $40,000,and operating income of $52,000.Based on this information,the budgeted operating income for 28,000 units would be:

A)$52,000.
B)$135,333.
C)$58,000.
D)$72,500.
E)$105,000.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
62
The following company information is available for March.The direct materials price variance is: <strong>The following company information is available for March.The direct materials price variance is:  </strong> A)$5,000 favorable. B)$300 favorable. C)$5,200 unfavorable. D)$5,000 unfavorable. E)$5,200 favorablE.

A)$5,000 favorable.
B)$300 favorable.
C)$5,200 unfavorable.
D)$5,000 unfavorable.
E)$5,200 favorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
63
Hassock Corp.produces woven wall hangings.It takes 2 hours of direct labor to produce a single wall hanging.Bartels' standard labor cost is $12 per hour.During August,Bartels produced 10,000 units and used 21,040 hours of direct labor at a total cost of $250,376.What is Bartels' labor efficiency variance for August?

A)$12,480 favorable.
B)$10,376 unfavorable.
C)$14,584 unfavorable.
D)$4,160 favorable.
E)$12,480 unfavorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
64
The following company information is available.The direct materials quantity variance is: <strong>The following company information is available.The direct materials quantity variance is:  </strong> A)$10,000 unfavorable. B)$13,200 unfavorable. C)$9,600 unfavorable. D)$10,000 favorable. E)$13,200 favorablE.

A)$10,000 unfavorable.
B)$13,200 unfavorable.
C)$9,600 unfavorable.
D)$10,000 favorable.
E)$13,200 favorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
65
Use the following data to find the direct labor rate variance if the company produced 3,500 units during the period. <strong>Use the following data to find the direct labor rate variance if the company produced 3,500 units during the period.  </strong> A)$6,125 unfavorable. B)$7,000 unfavorable. C)$7,000 favorable. D)$12,250 favorable. E)$6,125 favorablE.

A)$6,125 unfavorable.
B)$7,000 unfavorable.
C)$7,000 favorable.
D)$12,250 favorable.
E)$6,125 favorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
66
Use the following data to find the total direct labor cost variance if the company produced 3,500 units during the period. <strong>Use the following data to find the total direct labor cost variance if the company produced 3,500 units during the period.  </strong> A)$6,125 unfavorable. B)$7,000 unfavorable. C)$7,000 favorable. D)$12,250 favorable. E)$6,125 favorablE.

A)$6,125 unfavorable.
B)$7,000 unfavorable.
C)$7,000 favorable.
D)$12,250 favorable.
E)$6,125 favorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
67
Summerlin Company budgeted 4,000 pounds of material costing $5.00 per pound to produce 2,000 units.The company actually used 4,500 pounds that cost $5.10 per pound to produce 2,000 units.What is the direct materials price variance?

A)$400 unfavorable.
B)$450 unfavorable.
C)$2,500 unfavorable.
D)$2,550 unfavorable.
E)$2,950 unfavorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
68
Georgia,Inc.has collected the following data on one of its products.The direct materials quantity variance is: <strong>Georgia,Inc.has collected the following data on one of its products.The direct materials quantity variance is:  </strong> A)$30,000 favorable. B)$13,750 unfavorable. C)$16,250 favorable. D)$30,000 unfavorable. E)$13,750 favorablE.

A)$30,000 favorable.
B)$13,750 unfavorable.
C)$16,250 favorable.
D)$30,000 unfavorable.
E)$13,750 favorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
69
Parallel Enterprises has collected the following data on one of its products.During the period the company produced 25,000 units.The direct materials price variance is: <strong>Parallel Enterprises has collected the following data on one of its products.During the period the company produced 25,000 units.The direct materials price variance is:  </strong> A)$27,500 unfavorable. B)$50,000 unfavorable. C)$50,000 favorable. D)$22,500 unfavorable. E)$22,500 favorablE.

A)$27,500 unfavorable.
B)$50,000 unfavorable.
C)$50,000 favorable.
D)$22,500 unfavorable.
E)$22,500 favorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
70
Georgia Inc. ,has collected the following data on one of its products.The actual cost of the direct materials used is: <strong>Georgia Inc. ,has collected the following data on one of its products.The actual cost of the direct materials used is:  </strong> A)$133,750. B)$150,000. C)$106,250. D)$158,750. E)$120,000.

A)$133,750.
B)$150,000.
C)$106,250.
D)$158,750.
E)$120,000.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
71
A company has established 5 pounds of Material J at $2 per pound as the standard for the material in its Product Z.The company has just produced 1,000 units of this product,using 5,200 pounds of Material J that cost $9,880.The direct materials price variance is:

A)$520 unfavorable.
B)$400 unfavorable.
C)$120 favorable.
D)$520 favorable.
E)$400 favorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
72
Parallel Enterprises has collected the following data on one of its products.During the period the company produced 25,000 units.The direct materials quantity variance is: <strong>Parallel Enterprises has collected the following data on one of its products.During the period the company produced 25,000 units.The direct materials quantity variance is:  </strong> A)$27,500 unfavorable. B)$50,000 unfavorable. C)$50,000 favorable. D)$22,500 unfavorable. E)$22,500 favorablE.

A)$27,500 unfavorable.
B)$50,000 unfavorable.
C)$50,000 favorable.
D)$22,500 unfavorable.
E)$22,500 favorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
73
A job was budgeted to require 3 hours of labor per unit at $8.00 per hour.The job consisted of 8,000 units and was completed in 22,000 hours at a total labor cost of $198,000.What is the total labor cost variance?

A)$2,000 unfavorable.
B)$3,000 unfavorable.
C)$6,000 unfavorable.
D)$8,000 unfavorable.
E)$9,000 unfavorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
74
Use the following data to find the direct labor efficiency variance if the company produced 3,500 units during the period. <strong>Use the following data to find the direct labor efficiency variance if the company produced 3,500 units during the period.  </strong> A)$6,125 unfavorable. B)$7,000 unfavorable. C)$7,000 favorable. D)$12,250 favorable. E)$6,125 favorablE.

A)$6,125 unfavorable.
B)$7,000 unfavorable.
C)$7,000 favorable.
D)$12,250 favorable.
E)$6,125 favorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
75
A company has established 5 pounds of Material J at $2 per pound as the standard for the material in its Product Z.The company has just produced 1,000 units of this product,using 5,200 pounds of Material J that cost $9,880.The direct materials quantity variance is:

A)$400 unfavorable.
B)$120 favorable.
C)$400 favorable.
D)$520 favorable.
E)$520 unfavorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
76
Hassock Corp.produces woven wall hangings.It takes 2 hours of direct labor to produce a single wall hanging.Bartels' standard labor cost is $12 per hour.During August,Bartels produced 10,000 units and used 21,040 hours of direct labor at a total cost of $250,376.What is Bartels' labor rate variance for August?

A)$2,000 favorable.
B)$2,104 unfavorable.
C)$2,104 favorable.
D)$4,160 favorable.
E)$2,000 unfavorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
77
Which department is often responsible for the direct materials price variance?

A)The accounting department.
B)The production department.
C)The purchasing department.
D)The finance department.
E)The budgeting department.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
78
Summerlin Company budgeted 4,000 pounds of material costing $5.00 per pound to produce 2,000 units.The company actually used 4,500 pounds that cost $5.10 per pound to produce 2,000 units.What is the direct materials quantity variance?

A)$400 unfavorable.
B)$450 unfavorable.
C)$2,500 unfavorable.
D)$2,550 unfavorable.
E)$2,950 unfavorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
79
Georgia,Inc.has collected the following data on one of its products.The direct materials price variance is: <strong>Georgia,Inc.has collected the following data on one of its products.The direct materials price variance is:  </strong> A)$13,750 unfavorable. B)$16,250 unfavorable. C)$16,250 favorable. D)$30,000 unfavorable. E)$33,000 favorablE.

A)$13,750 unfavorable.
B)$16,250 unfavorable.
C)$16,250 favorable.
D)$30,000 unfavorable.
E)$33,000 favorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
80
Use the following data to find the direct labor rate variance if the company produced 7,000 units of product during the period. <strong>Use the following data to find the direct labor rate variance if the company produced 7,000 units of product during the period.  </strong> A)$12,250 unfavorable. B)$14,700 unfavorable. C)$14,700 favorable. D)$12,250 favorable. E)$26,950 favorablE.

A)$12,250 unfavorable.
B)$14,700 unfavorable.
C)$14,700 favorable.
D)$12,250 favorable.
E)$26,950 favorablE.
Unlock Deck
Unlock for access to all 177 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 177 flashcards in this deck.