Deck 11: Logistics Management

Full screen (f)
exit full mode
Question
If a make-to-stock manufacturing firm with highly seasonal demand follows a level production strategy,which of the following is likely to be true?

A)Inventory will fluctuate significantly during the year.
B)The production rate must be set equal to the demand in the heaviest demand period,and stay at that level all year.
C)It will be difficult to keep the workforce size stable.
D)The firm must make sure that its maximum capacity is at least as high as the heaviest demand period.
Use Space or
up arrow
down arrow
to flip the card.
Question
Zanda Corporation is preparing an aggregate production plan for its product for the next four months.The company's expected monthly demand is given in the following chart.The company will have 100 units in inventory at the beginning of the month and wishes to maintain at least 100 units at the end of each month.Following is other critical data: Production cost per unit = $125
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $50
Firing cost per worker = $100
Beginning number of workers = 25
Each worker can produce 25 units per month.
<strong>Zanda Corporation is preparing an aggregate production plan for its product for the next four months.The company's expected monthly demand is given in the following chart.The company will have 100 units in inventory at the beginning of the month and wishes to maintain at least 100 units at the end of each month.Following is other critical data: Production cost per unit = $125 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $50 Firing cost per worker = $100 Beginning number of workers = 25 Each worker can produce 25 units per month.   What is the total cost of a CHASE plan (using hiring/firing)?</strong> A)$379,800 B)$379,000 C)$381,100 D)$380,300 <div style=padding-top: 35px> What is the total cost of a CHASE plan (using hiring/firing)?

A)$379,800
B)$379,000
C)$381,100
D)$380,300
Question
Each month the sales and operations team at Johnson Company meets to develop plans for each of the next six months.This process is known as:

A)Collaborative planning and forecasting.
B)Rolling planning horizons.
C)Unconstrained planning.
D)Continuous planning.
Question
If a make-to-stock manufacturing firm with highly seasonal demand follows a chase demand strategy,which of the following is likely to be true?

A)Inventory will fluctuate significantly during the year.
B)The production rate must be set equal to the demand in the heaviest demand period,and it must stay at that level all year.
C)It will be easy to keep the workforce size stable.
D)The firm likely will have higher capital investment than if it followed a level plan.
Question
If a company strongly prefers that its aggregate output plan be closer to a level plan than a chase plan,this implies that it is concerned about minimizing:

A)Inventory carrying costs.
B)Hiring and layoff costs.
C)Cost of quality defects.
D)Lost sales costs.
Question
Jones Corporation is preparing an aggregate production plan for washing machines for the next four quarters.The company's expected quarterly demand is given in the following chart.The company will have 1,000 washers in inventory at the beginning of the year and wishes to maintain at least that number at the end of each quarter.Following is other critical data: Production cost per unit = $250
Inventory carrying cost per quarter per unit = $10 (based on quarter-ending inventory)
Hiring cost per worker = $1,000
Firing cost per worker = $2,000
Beginning number of workers = 10
Each worker can produce 100 units per quarter.
Any worker on the staff at the end of the year will not be fired at that time.
<strong>Jones Corporation is preparing an aggregate production plan for washing machines for the next four quarters.The company's expected quarterly demand is given in the following chart.The company will have 1,000 washers in inventory at the beginning of the year and wishes to maintain at least that number at the end of each quarter.Following is other critical data: Production cost per unit = $250 Inventory carrying cost per quarter per unit = $10 (based on quarter-ending inventory) Hiring cost per worker = $1,000 Firing cost per worker = $2,000 Beginning number of workers = 10 Each worker can produce 100 units per quarter. Any worker on the staff at the end of the year will not be fired at that time.   Given this data,what is the total cost of a LEVEL plan?</strong> A)$5,000,000 B)$5,140,000 C)$5,110,000 D)$5,740,000 <div style=padding-top: 35px> Given this data,what is the total cost of a LEVEL plan?

A)$5,000,000
B)$5,140,000
C)$5,110,000
D)$5,740,000
Question
Zanda Corp.and Jones Corp.are identical in every way (products produced,costs,demand,etc.)except for one.Zanda uses a level production plan while Jones prefers a chase production plan.Which of the following is most likely to be true?

A)Jones will have higher investment in plant and equipment.
B)Jones will have higher hiring and firing costs.
C)Jones will have lower inventory carrying costs.
D)All of the selections are true.
Question
Zanda Corporation is preparing an aggregate production plan for its product for the next four months.The company's expected monthly demand is given in the following chart.The company will have 100 units in inventory at the beginning of the month and wishes to maintain at least 100 units at the end of each month.Following is other critical data: Production cost per unit = $125
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $50
Firing cost per worker = $100
Beginning number of workers = 25
Each worker can produce 25 units per month.
<strong>Zanda Corporation is preparing an aggregate production plan for its product for the next four months.The company's expected monthly demand is given in the following chart.The company will have 100 units in inventory at the beginning of the month and wishes to maintain at least 100 units at the end of each month.Following is other critical data: Production cost per unit = $125 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $50 Firing cost per worker = $100 Beginning number of workers = 25 Each worker can produce 25 units per month.   The total inventory carrying cost of a chase plan is:</strong> A)$6,000 B)$4,000 C)$5,000 D)$4,500 <div style=padding-top: 35px> The total inventory carrying cost of a chase plan is:

A)$6,000
B)$4,000
C)$5,000
D)$4,500
Question
Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $300
Firing cost per worker = $200
Beginning number of workers = 16
Each worker can produce 50 units per month.
<strong>Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $300 Firing cost per worker = $200 Beginning number of workers = 16 Each worker can produce 50 units per month.   What is the total cost of the level plan?</strong> A)$250,000 B)$260,700 C)$252,700 D)$258,000 <div style=padding-top: 35px> What is the total cost of the level plan?

A)$250,000
B)$260,700
C)$252,700
D)$258,000
Question
Which of the following is NOT one of the costs considered in aggregate production planning?

A)Subcontracting cost.
B)Capital equipment cost.
C)Inventory cost.
D)Firing (layoff)cost.
Question
The focus of an aggregate production plan,in general,is on all of the following EXCEPT:

A)The intermediate-term future.
B)Product lines.
C)Facilities and capital equipment.
D)Inventory levels.
Question
Which of the following is true concerning sales and operations planning?

A)Once the plan is finalized,it should not be changed during the planning period.
B)There is a specific set of steps all firms should follow in the sales and operations planning process.
C)A benefit of the process is that the firm should achieve high service levels with lower inventory.
D)By keeping the schedule stable,production can be optimized.
Question
Which type of aggregate production plan is likely to have the LEAST negative impact on the local community and the workforce?

A)Chase plan with hiring and firing
B)Chase plan with overtime
C)Level plan
D)The plans do not differ in their impact on the local community and the workforce.
Question
Sales and Operations Planning focuses on what time frame?

A)Very short,immediate plans
B)Intermediate range planning
C)Long term Plans
D)All of the above
Question
Jones Corporation is preparing an aggregate production plan for washing machines for the next four quarters.The company's expected quarterly demand is given in the following chart.The company will have 1,000 washers in inventory at the beginning of the year and wishes to maintain at least that number at the end of each quarter.Following is other critical data: Production cost per unit = $250
Inventory carrying cost per quarter per unit = $10 (based on quarter-ending inventory)
Hiring cost per worker = $1,000
Firing cost per worker = $2,000
Beginning number of workers = 10
Each worker can produce 100 units per quarter.
Any worker on the staff at the end of the year will not be fired at that time.
<strong>Jones Corporation is preparing an aggregate production plan for washing machines for the next four quarters.The company's expected quarterly demand is given in the following chart.The company will have 1,000 washers in inventory at the beginning of the year and wishes to maintain at least that number at the end of each quarter.Following is other critical data: Production cost per unit = $250 Inventory carrying cost per quarter per unit = $10 (based on quarter-ending inventory) Hiring cost per worker = $1,000 Firing cost per worker = $2,000 Beginning number of workers = 10 Each worker can produce 100 units per quarter. Any worker on the staff at the end of the year will not be fired at that time.   If Jones prefers a level plan,what will be the regular production rate per quarter?</strong> A)5,000 units B)4,000 units C)6,000 units D)Regular production will vary each month. <div style=padding-top: 35px> If Jones prefers a level plan,what will be the regular production rate per quarter?

A)5,000 units
B)4,000 units
C)6,000 units
D)Regular production will vary each month.
Question
Generally speaking,the sales function and operations function differ in objectives.Which of the following is NOT one of those differences?

A)Sales prefers detailed forecasts for setting bonuses; operations prefers aggregate forecasts.
B)Sales prefers many product variations; operations prefers few variations.
C)Sales emphasizes revenue; operations emphasizes cost minimization.
D)Sales prefers rapid response; operations prefers stable production schedules.
Question
Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $300
Firing cost per worker = $200
Beginning number of workers = 16
Each worker can produce 50 units per month.
<strong>Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $300 Firing cost per worker = $200 Beginning number of workers = 16 Each worker can produce 50 units per month.   What is the regular monthly actual production for a level plan?</strong> A)800 B)1,000 C)1,250 D)1,500 <div style=padding-top: 35px> What is the regular monthly actual production for a level plan?

A)800
B)1,000
C)1,250
D)1,500
Question
Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $300
Firing cost per worker = $200
Beginning number of workers = 16
Each worker can produce 50 units per month.
<strong>Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $300 Firing cost per worker = $200 Beginning number of workers = 16 Each worker can produce 50 units per month.   What is the total inventory carrying cost for the level plan?</strong> A)0 B)$6,000 C)$8,000 D)$6,500 <div style=padding-top: 35px> What is the total inventory carrying cost for the level plan?

A)0
B)$6,000
C)$8,000
D)$6,500
Question
Jones Corporation is preparing an aggregate production plan for washing machines for the next four quarters.The company's expected quarterly demand is given in the following chart.The company will have 1,000 washers in inventory at the beginning of the year and wishes to maintain at least that number at the end of each quarter.Following is other critical data: Production cost per unit = $250
Inventory carrying cost per quarter per unit = $10 (based on quarter-ending inventory)
Hiring cost per worker = $1,000
Firing cost per worker = $2,000
Beginning number of workers = 10
Each worker can produce 100 units per quarter.
Any worker on the staff at the end of the year will not be fired at that time.
<strong>Jones Corporation is preparing an aggregate production plan for washing machines for the next four quarters.The company's expected quarterly demand is given in the following chart.The company will have 1,000 washers in inventory at the beginning of the year and wishes to maintain at least that number at the end of each quarter.Following is other critical data: Production cost per unit = $250 Inventory carrying cost per quarter per unit = $10 (based on quarter-ending inventory) Hiring cost per worker = $1,000 Firing cost per worker = $2,000 Beginning number of workers = 10 Each worker can produce 100 units per quarter. Any worker on the staff at the end of the year will not be fired at that time.   Given this data,what is the inventory carrying cost of a LEVEL plan?</strong> A)$100,000 B)$700,000 C)$70,000 D)$7,000 <div style=padding-top: 35px> Given this data,what is the inventory carrying cost of a LEVEL plan?

A)$100,000
B)$700,000
C)$70,000
D)$7,000
Question
Zanda Corp.and Jones Corp.are identical in every way (products produced,costs,demand,etc.)except for one.Zanda uses a level production plan while Jones prefers a chase production plan.Which of the following is most likely to be true?

A)Zanda will have higher investment in plant and equipment.
B)Zanda will have higher hiring and firing costs.
C)Zanda will have higher inventory carrying costs.
D)Zanda will have higher overtime costs.
Question
You are sitting next to a person in business class on a flight from Los Angeles to Sydney,Australia.You mention to that person that you got your ticket two months ago for only $12,500.The person responds that she bought her ticket two days ago for $7,800.This sometimes happens because airlines often use an approach called:

A)Capacity management.
B)Yield management.
C)Load management.
D)Workforce leveling.
Question
Firms in which of these industries experience no difficulty in balancing supply and demand?

A)The commercial real estate industry.
B)The airline industry.
C)The fast food industry.
D)All companies must make difficult decisions in balancing supply and demand.
Question
John Jones,senior VP for Zanda Corp.,is looking at three alternative aggregate production plans for the next six-month period.At his company,demand varies by month with substantial month-to-month differences.The three alternatives are a "pure level plan," which keeps an absolutely constant workforce,a "pure chase plan" relying on hiring and layoffs,and a hybrid plan.He is most likely to find that the hybrid plan:

A)Has lower inventory carrying cost than the level plan and lower hiring/layoff cost than the chase plan.
B)Has higher hiring/layoff cost than the chase plan and higher inventory carrying cost than the level plan.
C)Has lower inventory carrying cost than the chase plan and higher hiring/layoff cost than the level plan.
D)None of these selections.
Question
Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $300
Firing cost per worker = $200
Beginning number of workers = 16
Each worker can produce 50 units per month.
<strong>Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $300 Firing cost per worker = $200 Beginning number of workers = 16 Each worker can produce 50 units per month.   What is the inventory carrying cost of a chase plan accomplished through hiring and firing?</strong> A)0 B)$200 C)$1,000 D)$2,000 <div style=padding-top: 35px> What is the inventory carrying cost of a chase plan accomplished through hiring and firing?

A)0
B)$200
C)$1,000
D)$2,000
Question
Which of the following is an advantage of a chase production strategy (as compared to a level plan)?

A)Low investment in equipment.
B)High inventory carrying cost.
C)Lower inventory investment.
D)Less investment in employee training.
Question
Which of the following are not considered a relevant aggregate planning cost?

A)Lost sales cost
B)Inventory holding cost
C)Management and supervisory training cost
D)Subcontracting cost
Question
Which of the following is NOT an input into the S&OP?

A)Safety Stocks
B)Spare Parts Demand
C)Promotion
D)Lot Sizing Logic.
Question
Within the hierarchy of planning,the Sales & Operations Planning system occurs at which of the following levels?

A)Long range
B)Intermediate range
C)Short range
D)Operational level.
Question
Dave's Stove-Top Popcorn currently has three full-time employees who are each paid $1,500 per month.An employee can only work a maximum of 100 hours per month because production normally takes place at night.They do receive $1,500 even if they do not work 100 hours,however.Part-time employees can be hired at a cost of $25 per hour.Dave's Stove-Top Popcorn has forecasted that demand for the next six months will be as follows: <strong>Dave's Stove-Top Popcorn currently has three full-time employees who are each paid $1,500 per month.An employee can only work a maximum of 100 hours per month because production normally takes place at night.They do receive $1,500 even if they do not work 100 hours,however.Part-time employees can be hired at a cost of $25 per hour.Dave's Stove-Top Popcorn has forecasted that demand for the next six months will be as follows:   What is the total labor cost if Dave hires one more full-time employee to meet additional demand?</strong> A)$30,750 B)$36,000 C)$40,750 D)$52,500 <div style=padding-top: 35px> What is the total labor cost if Dave hires one more full-time employee to meet additional demand?

A)$30,750
B)$36,000
C)$40,750
D)$52,500
Question
Every year around mid-May,the Grand Hotel on Mackinac Island runs a special to coincide with the Lilac Festival.This special offers visitors a three day stay (3 days/2 nights)combined with all meals and a guided tour of the various Lilac displays.Which of the following terms best captures this program?

A)Sales and Operations Planning
B)Marketing Strategy
C)Yield Management
D)Aggregate Planning.
Question
Sales and Operational Planning:

A)Provides an opportunity for customers to interact with the cross-functional team that develops operational and marketing strategies.
B)Ensures that decisions in sales,marketing and operations can be taken without reference to financial concerns.
C)Provides a regular opportunity for cross-functional teams to review data from the field and to decide how the company should best respond.
D)Is a forum where detailed production plans are developed and ratified.
Question
S&OP has both "hard" and "soft" benefits.Which of the following is not considered a "soft" benefit of S&OP?

A)Greater accountability for results
B)Enhanced teamwork at both the executive and operating levels
C)Better decisions with less effort
D)Higher sales and enhanced quality
Question
Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $300
Firing cost per worker = $200
Beginning number of workers = 16
Each worker can produce 50 units per month.
<strong>Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $300 Firing cost per worker = $200 Beginning number of workers = 16 Each worker can produce 50 units per month.   What is the total cost of a chase plan which uses only hiring/firing?</strong> A)$257,000 B)$257,400 C)$257,600 D)$257,900 <div style=padding-top: 35px> What is the total cost of a chase plan which uses only hiring/firing?

A)$257,000
B)$257,400
C)$257,600
D)$257,900
Question
How does aggregate planning for services differ from aggregate production planning for products?

A)There is no difference.
B)Demand for products typically is stated as the number of hours of labor required,whereas demand for services is generally stated as the number of units of service desired.
C)Most service plans are based primarily on labor requirements.
D)Service plans make extensive use of inventory to meet demand.
Question
What is the major aggregate planning difference between service and manufacturing firms?

A)Aggregate planning is not as critical in service firms as it is in manufacturing companies.
B)Demand for services is often stated in terms of service products delivered rather than units of manufactured goods.
C)Service firms cannot hold inventory of their product.
D)Customer satisfaction with service products can be precisely measured,whereas satisfaction with manufactured goods is often a matter of interpretation.
Question
John Jones,senior VP for Zanda Corp.,is looking at three alternative aggregate production plans for the next six-month period.At his company,demand varies by month with substantial month-to-month differences.The three alternatives are a "pure level plan," which keeps an absolutely constant workforce,a "pure chase plan" relying on hiring and layoffs,and a hybrid plan.He is most likely to find that the pure level plan:

A)Has lower inventory carrying cost than the hybrid plan.
B)Has higher hiring/layoff cost than the chase plan.
C)Has higher hiring/layoff cost than the hybrid plan.
D)Has higher inventory carrying cost than the chase plan.
Question
The process of replanning each period for a given number of periods into the future is referred to as which of the following terms?

A)Rolling planning horizon
B)Material requirements planning
C)Aggregate planning
D)Master production schedule
Question
Dave's Stove-Top Popcorn currently has three full-time employees who are each paid $1,500 per month.An employee can only work a maximum of 100 hours per month because production normally takes place at night.They do receive $1,500 even if they do not work 100 hours,however.Part-time employees can be hired at a cost of $25 per hour.Dave's Stove-Top Popcorn has forecasted that demand for the next six months will be as follows: <strong>Dave's Stove-Top Popcorn currently has three full-time employees who are each paid $1,500 per month.An employee can only work a maximum of 100 hours per month because production normally takes place at night.They do receive $1,500 even if they do not work 100 hours,however.Part-time employees can be hired at a cost of $25 per hour.Dave's Stove-Top Popcorn has forecasted that demand for the next six months will be as follows:   What is the total labor cost if Dave relies on part-time employees to meet additional demand?</strong> A)$43,500 B)$53,500 C)$70,500 D)$77,500 <div style=padding-top: 35px> What is the total labor cost if Dave relies on part-time employees to meet additional demand?

A)$43,500
B)$53,500
C)$70,500
D)$77,500
Question
Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $300
Firing cost per worker = $200
Beginning number of workers = 16
Each worker can produce 50 units per month.
<strong>Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $300 Firing cost per worker = $200 Beginning number of workers = 16 Each worker can produce 50 units per month.   What is the total cost of hiring and firing the workers in a chase plan which uses only hiring and firing?</strong> A)0 B)$800 C)$5,000 D)$6,400 <div style=padding-top: 35px> What is the total cost of hiring and firing the workers in a chase plan which uses only hiring and firing?

A)0
B)$800
C)$5,000
D)$6,400
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/39
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 11: Logistics Management
1
If a make-to-stock manufacturing firm with highly seasonal demand follows a level production strategy,which of the following is likely to be true?

A)Inventory will fluctuate significantly during the year.
B)The production rate must be set equal to the demand in the heaviest demand period,and stay at that level all year.
C)It will be difficult to keep the workforce size stable.
D)The firm must make sure that its maximum capacity is at least as high as the heaviest demand period.
Inventory will fluctuate significantly during the year.
2
Zanda Corporation is preparing an aggregate production plan for its product for the next four months.The company's expected monthly demand is given in the following chart.The company will have 100 units in inventory at the beginning of the month and wishes to maintain at least 100 units at the end of each month.Following is other critical data: Production cost per unit = $125
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $50
Firing cost per worker = $100
Beginning number of workers = 25
Each worker can produce 25 units per month.
<strong>Zanda Corporation is preparing an aggregate production plan for its product for the next four months.The company's expected monthly demand is given in the following chart.The company will have 100 units in inventory at the beginning of the month and wishes to maintain at least 100 units at the end of each month.Following is other critical data: Production cost per unit = $125 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $50 Firing cost per worker = $100 Beginning number of workers = 25 Each worker can produce 25 units per month.   What is the total cost of a CHASE plan (using hiring/firing)?</strong> A)$379,800 B)$379,000 C)$381,100 D)$380,300 What is the total cost of a CHASE plan (using hiring/firing)?

A)$379,800
B)$379,000
C)$381,100
D)$380,300
$380,300
3
Each month the sales and operations team at Johnson Company meets to develop plans for each of the next six months.This process is known as:

A)Collaborative planning and forecasting.
B)Rolling planning horizons.
C)Unconstrained planning.
D)Continuous planning.
Rolling planning horizons.
4
If a make-to-stock manufacturing firm with highly seasonal demand follows a chase demand strategy,which of the following is likely to be true?

A)Inventory will fluctuate significantly during the year.
B)The production rate must be set equal to the demand in the heaviest demand period,and it must stay at that level all year.
C)It will be easy to keep the workforce size stable.
D)The firm likely will have higher capital investment than if it followed a level plan.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
5
If a company strongly prefers that its aggregate output plan be closer to a level plan than a chase plan,this implies that it is concerned about minimizing:

A)Inventory carrying costs.
B)Hiring and layoff costs.
C)Cost of quality defects.
D)Lost sales costs.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
6
Jones Corporation is preparing an aggregate production plan for washing machines for the next four quarters.The company's expected quarterly demand is given in the following chart.The company will have 1,000 washers in inventory at the beginning of the year and wishes to maintain at least that number at the end of each quarter.Following is other critical data: Production cost per unit = $250
Inventory carrying cost per quarter per unit = $10 (based on quarter-ending inventory)
Hiring cost per worker = $1,000
Firing cost per worker = $2,000
Beginning number of workers = 10
Each worker can produce 100 units per quarter.
Any worker on the staff at the end of the year will not be fired at that time.
<strong>Jones Corporation is preparing an aggregate production plan for washing machines for the next four quarters.The company's expected quarterly demand is given in the following chart.The company will have 1,000 washers in inventory at the beginning of the year and wishes to maintain at least that number at the end of each quarter.Following is other critical data: Production cost per unit = $250 Inventory carrying cost per quarter per unit = $10 (based on quarter-ending inventory) Hiring cost per worker = $1,000 Firing cost per worker = $2,000 Beginning number of workers = 10 Each worker can produce 100 units per quarter. Any worker on the staff at the end of the year will not be fired at that time.   Given this data,what is the total cost of a LEVEL plan?</strong> A)$5,000,000 B)$5,140,000 C)$5,110,000 D)$5,740,000 Given this data,what is the total cost of a LEVEL plan?

A)$5,000,000
B)$5,140,000
C)$5,110,000
D)$5,740,000
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
7
Zanda Corp.and Jones Corp.are identical in every way (products produced,costs,demand,etc.)except for one.Zanda uses a level production plan while Jones prefers a chase production plan.Which of the following is most likely to be true?

A)Jones will have higher investment in plant and equipment.
B)Jones will have higher hiring and firing costs.
C)Jones will have lower inventory carrying costs.
D)All of the selections are true.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
8
Zanda Corporation is preparing an aggregate production plan for its product for the next four months.The company's expected monthly demand is given in the following chart.The company will have 100 units in inventory at the beginning of the month and wishes to maintain at least 100 units at the end of each month.Following is other critical data: Production cost per unit = $125
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $50
Firing cost per worker = $100
Beginning number of workers = 25
Each worker can produce 25 units per month.
<strong>Zanda Corporation is preparing an aggregate production plan for its product for the next four months.The company's expected monthly demand is given in the following chart.The company will have 100 units in inventory at the beginning of the month and wishes to maintain at least 100 units at the end of each month.Following is other critical data: Production cost per unit = $125 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $50 Firing cost per worker = $100 Beginning number of workers = 25 Each worker can produce 25 units per month.   The total inventory carrying cost of a chase plan is:</strong> A)$6,000 B)$4,000 C)$5,000 D)$4,500 The total inventory carrying cost of a chase plan is:

A)$6,000
B)$4,000
C)$5,000
D)$4,500
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
9
Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $300
Firing cost per worker = $200
Beginning number of workers = 16
Each worker can produce 50 units per month.
<strong>Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $300 Firing cost per worker = $200 Beginning number of workers = 16 Each worker can produce 50 units per month.   What is the total cost of the level plan?</strong> A)$250,000 B)$260,700 C)$252,700 D)$258,000 What is the total cost of the level plan?

A)$250,000
B)$260,700
C)$252,700
D)$258,000
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
10
Which of the following is NOT one of the costs considered in aggregate production planning?

A)Subcontracting cost.
B)Capital equipment cost.
C)Inventory cost.
D)Firing (layoff)cost.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
11
The focus of an aggregate production plan,in general,is on all of the following EXCEPT:

A)The intermediate-term future.
B)Product lines.
C)Facilities and capital equipment.
D)Inventory levels.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following is true concerning sales and operations planning?

A)Once the plan is finalized,it should not be changed during the planning period.
B)There is a specific set of steps all firms should follow in the sales and operations planning process.
C)A benefit of the process is that the firm should achieve high service levels with lower inventory.
D)By keeping the schedule stable,production can be optimized.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
13
Which type of aggregate production plan is likely to have the LEAST negative impact on the local community and the workforce?

A)Chase plan with hiring and firing
B)Chase plan with overtime
C)Level plan
D)The plans do not differ in their impact on the local community and the workforce.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
14
Sales and Operations Planning focuses on what time frame?

A)Very short,immediate plans
B)Intermediate range planning
C)Long term Plans
D)All of the above
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
15
Jones Corporation is preparing an aggregate production plan for washing machines for the next four quarters.The company's expected quarterly demand is given in the following chart.The company will have 1,000 washers in inventory at the beginning of the year and wishes to maintain at least that number at the end of each quarter.Following is other critical data: Production cost per unit = $250
Inventory carrying cost per quarter per unit = $10 (based on quarter-ending inventory)
Hiring cost per worker = $1,000
Firing cost per worker = $2,000
Beginning number of workers = 10
Each worker can produce 100 units per quarter.
Any worker on the staff at the end of the year will not be fired at that time.
<strong>Jones Corporation is preparing an aggregate production plan for washing machines for the next four quarters.The company's expected quarterly demand is given in the following chart.The company will have 1,000 washers in inventory at the beginning of the year and wishes to maintain at least that number at the end of each quarter.Following is other critical data: Production cost per unit = $250 Inventory carrying cost per quarter per unit = $10 (based on quarter-ending inventory) Hiring cost per worker = $1,000 Firing cost per worker = $2,000 Beginning number of workers = 10 Each worker can produce 100 units per quarter. Any worker on the staff at the end of the year will not be fired at that time.   If Jones prefers a level plan,what will be the regular production rate per quarter?</strong> A)5,000 units B)4,000 units C)6,000 units D)Regular production will vary each month. If Jones prefers a level plan,what will be the regular production rate per quarter?

A)5,000 units
B)4,000 units
C)6,000 units
D)Regular production will vary each month.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
16
Generally speaking,the sales function and operations function differ in objectives.Which of the following is NOT one of those differences?

A)Sales prefers detailed forecasts for setting bonuses; operations prefers aggregate forecasts.
B)Sales prefers many product variations; operations prefers few variations.
C)Sales emphasizes revenue; operations emphasizes cost minimization.
D)Sales prefers rapid response; operations prefers stable production schedules.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
17
Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $300
Firing cost per worker = $200
Beginning number of workers = 16
Each worker can produce 50 units per month.
<strong>Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $300 Firing cost per worker = $200 Beginning number of workers = 16 Each worker can produce 50 units per month.   What is the regular monthly actual production for a level plan?</strong> A)800 B)1,000 C)1,250 D)1,500 What is the regular monthly actual production for a level plan?

A)800
B)1,000
C)1,250
D)1,500
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
18
Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $300
Firing cost per worker = $200
Beginning number of workers = 16
Each worker can produce 50 units per month.
<strong>Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $300 Firing cost per worker = $200 Beginning number of workers = 16 Each worker can produce 50 units per month.   What is the total inventory carrying cost for the level plan?</strong> A)0 B)$6,000 C)$8,000 D)$6,500 What is the total inventory carrying cost for the level plan?

A)0
B)$6,000
C)$8,000
D)$6,500
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
19
Jones Corporation is preparing an aggregate production plan for washing machines for the next four quarters.The company's expected quarterly demand is given in the following chart.The company will have 1,000 washers in inventory at the beginning of the year and wishes to maintain at least that number at the end of each quarter.Following is other critical data: Production cost per unit = $250
Inventory carrying cost per quarter per unit = $10 (based on quarter-ending inventory)
Hiring cost per worker = $1,000
Firing cost per worker = $2,000
Beginning number of workers = 10
Each worker can produce 100 units per quarter.
Any worker on the staff at the end of the year will not be fired at that time.
<strong>Jones Corporation is preparing an aggregate production plan for washing machines for the next four quarters.The company's expected quarterly demand is given in the following chart.The company will have 1,000 washers in inventory at the beginning of the year and wishes to maintain at least that number at the end of each quarter.Following is other critical data: Production cost per unit = $250 Inventory carrying cost per quarter per unit = $10 (based on quarter-ending inventory) Hiring cost per worker = $1,000 Firing cost per worker = $2,000 Beginning number of workers = 10 Each worker can produce 100 units per quarter. Any worker on the staff at the end of the year will not be fired at that time.   Given this data,what is the inventory carrying cost of a LEVEL plan?</strong> A)$100,000 B)$700,000 C)$70,000 D)$7,000 Given this data,what is the inventory carrying cost of a LEVEL plan?

A)$100,000
B)$700,000
C)$70,000
D)$7,000
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
20
Zanda Corp.and Jones Corp.are identical in every way (products produced,costs,demand,etc.)except for one.Zanda uses a level production plan while Jones prefers a chase production plan.Which of the following is most likely to be true?

A)Zanda will have higher investment in plant and equipment.
B)Zanda will have higher hiring and firing costs.
C)Zanda will have higher inventory carrying costs.
D)Zanda will have higher overtime costs.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
21
You are sitting next to a person in business class on a flight from Los Angeles to Sydney,Australia.You mention to that person that you got your ticket two months ago for only $12,500.The person responds that she bought her ticket two days ago for $7,800.This sometimes happens because airlines often use an approach called:

A)Capacity management.
B)Yield management.
C)Load management.
D)Workforce leveling.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
22
Firms in which of these industries experience no difficulty in balancing supply and demand?

A)The commercial real estate industry.
B)The airline industry.
C)The fast food industry.
D)All companies must make difficult decisions in balancing supply and demand.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
23
John Jones,senior VP for Zanda Corp.,is looking at three alternative aggregate production plans for the next six-month period.At his company,demand varies by month with substantial month-to-month differences.The three alternatives are a "pure level plan," which keeps an absolutely constant workforce,a "pure chase plan" relying on hiring and layoffs,and a hybrid plan.He is most likely to find that the hybrid plan:

A)Has lower inventory carrying cost than the level plan and lower hiring/layoff cost than the chase plan.
B)Has higher hiring/layoff cost than the chase plan and higher inventory carrying cost than the level plan.
C)Has lower inventory carrying cost than the chase plan and higher hiring/layoff cost than the level plan.
D)None of these selections.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
24
Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $300
Firing cost per worker = $200
Beginning number of workers = 16
Each worker can produce 50 units per month.
<strong>Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $300 Firing cost per worker = $200 Beginning number of workers = 16 Each worker can produce 50 units per month.   What is the inventory carrying cost of a chase plan accomplished through hiring and firing?</strong> A)0 B)$200 C)$1,000 D)$2,000 What is the inventory carrying cost of a chase plan accomplished through hiring and firing?

A)0
B)$200
C)$1,000
D)$2,000
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following is an advantage of a chase production strategy (as compared to a level plan)?

A)Low investment in equipment.
B)High inventory carrying cost.
C)Lower inventory investment.
D)Less investment in employee training.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following are not considered a relevant aggregate planning cost?

A)Lost sales cost
B)Inventory holding cost
C)Management and supervisory training cost
D)Subcontracting cost
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
27
Which of the following is NOT an input into the S&OP?

A)Safety Stocks
B)Spare Parts Demand
C)Promotion
D)Lot Sizing Logic.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
28
Within the hierarchy of planning,the Sales & Operations Planning system occurs at which of the following levels?

A)Long range
B)Intermediate range
C)Short range
D)Operational level.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
29
Dave's Stove-Top Popcorn currently has three full-time employees who are each paid $1,500 per month.An employee can only work a maximum of 100 hours per month because production normally takes place at night.They do receive $1,500 even if they do not work 100 hours,however.Part-time employees can be hired at a cost of $25 per hour.Dave's Stove-Top Popcorn has forecasted that demand for the next six months will be as follows: <strong>Dave's Stove-Top Popcorn currently has three full-time employees who are each paid $1,500 per month.An employee can only work a maximum of 100 hours per month because production normally takes place at night.They do receive $1,500 even if they do not work 100 hours,however.Part-time employees can be hired at a cost of $25 per hour.Dave's Stove-Top Popcorn has forecasted that demand for the next six months will be as follows:   What is the total labor cost if Dave hires one more full-time employee to meet additional demand?</strong> A)$30,750 B)$36,000 C)$40,750 D)$52,500 What is the total labor cost if Dave hires one more full-time employee to meet additional demand?

A)$30,750
B)$36,000
C)$40,750
D)$52,500
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
30
Every year around mid-May,the Grand Hotel on Mackinac Island runs a special to coincide with the Lilac Festival.This special offers visitors a three day stay (3 days/2 nights)combined with all meals and a guided tour of the various Lilac displays.Which of the following terms best captures this program?

A)Sales and Operations Planning
B)Marketing Strategy
C)Yield Management
D)Aggregate Planning.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
31
Sales and Operational Planning:

A)Provides an opportunity for customers to interact with the cross-functional team that develops operational and marketing strategies.
B)Ensures that decisions in sales,marketing and operations can be taken without reference to financial concerns.
C)Provides a regular opportunity for cross-functional teams to review data from the field and to decide how the company should best respond.
D)Is a forum where detailed production plans are developed and ratified.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
32
S&OP has both "hard" and "soft" benefits.Which of the following is not considered a "soft" benefit of S&OP?

A)Greater accountability for results
B)Enhanced teamwork at both the executive and operating levels
C)Better decisions with less effort
D)Higher sales and enhanced quality
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
33
Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $300
Firing cost per worker = $200
Beginning number of workers = 16
Each worker can produce 50 units per month.
<strong>Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $300 Firing cost per worker = $200 Beginning number of workers = 16 Each worker can produce 50 units per month.   What is the total cost of a chase plan which uses only hiring/firing?</strong> A)$257,000 B)$257,400 C)$257,600 D)$257,900 What is the total cost of a chase plan which uses only hiring/firing?

A)$257,000
B)$257,400
C)$257,600
D)$257,900
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
34
How does aggregate planning for services differ from aggregate production planning for products?

A)There is no difference.
B)Demand for products typically is stated as the number of hours of labor required,whereas demand for services is generally stated as the number of units of service desired.
C)Most service plans are based primarily on labor requirements.
D)Service plans make extensive use of inventory to meet demand.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
35
What is the major aggregate planning difference between service and manufacturing firms?

A)Aggregate planning is not as critical in service firms as it is in manufacturing companies.
B)Demand for services is often stated in terms of service products delivered rather than units of manufactured goods.
C)Service firms cannot hold inventory of their product.
D)Customer satisfaction with service products can be precisely measured,whereas satisfaction with manufactured goods is often a matter of interpretation.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
36
John Jones,senior VP for Zanda Corp.,is looking at three alternative aggregate production plans for the next six-month period.At his company,demand varies by month with substantial month-to-month differences.The three alternatives are a "pure level plan," which keeps an absolutely constant workforce,a "pure chase plan" relying on hiring and layoffs,and a hybrid plan.He is most likely to find that the pure level plan:

A)Has lower inventory carrying cost than the hybrid plan.
B)Has higher hiring/layoff cost than the chase plan.
C)Has higher hiring/layoff cost than the hybrid plan.
D)Has higher inventory carrying cost than the chase plan.
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
37
The process of replanning each period for a given number of periods into the future is referred to as which of the following terms?

A)Rolling planning horizon
B)Material requirements planning
C)Aggregate planning
D)Master production schedule
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
38
Dave's Stove-Top Popcorn currently has three full-time employees who are each paid $1,500 per month.An employee can only work a maximum of 100 hours per month because production normally takes place at night.They do receive $1,500 even if they do not work 100 hours,however.Part-time employees can be hired at a cost of $25 per hour.Dave's Stove-Top Popcorn has forecasted that demand for the next six months will be as follows: <strong>Dave's Stove-Top Popcorn currently has three full-time employees who are each paid $1,500 per month.An employee can only work a maximum of 100 hours per month because production normally takes place at night.They do receive $1,500 even if they do not work 100 hours,however.Part-time employees can be hired at a cost of $25 per hour.Dave's Stove-Top Popcorn has forecasted that demand for the next six months will be as follows:   What is the total labor cost if Dave relies on part-time employees to meet additional demand?</strong> A)$43,500 B)$53,500 C)$70,500 D)$77,500 What is the total labor cost if Dave relies on part-time employees to meet additional demand?

A)$43,500
B)$53,500
C)$70,500
D)$77,500
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
39
Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50
Inventory carrying cost per month per unit = $10 (based on ending month inventory)
Hiring cost per worker = $300
Firing cost per worker = $200
Beginning number of workers = 16
Each worker can produce 50 units per month.
<strong>Wiedmer Corporation is preparing an aggregate production plan for widgets for the next four months.The company's expected monthly demand is given in the following chart.The company will have 50 widgets in inventory at the beginning of the first month and wishes to maintain at least that number at the end of each month.Following is other critical data: Production cost per unit = $50 Inventory carrying cost per month per unit = $10 (based on ending month inventory) Hiring cost per worker = $300 Firing cost per worker = $200 Beginning number of workers = 16 Each worker can produce 50 units per month.   What is the total cost of hiring and firing the workers in a chase plan which uses only hiring and firing?</strong> A)0 B)$800 C)$5,000 D)$6,400 What is the total cost of hiring and firing the workers in a chase plan which uses only hiring and firing?

A)0
B)$800
C)$5,000
D)$6,400
Unlock Deck
Unlock for access to all 39 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 39 flashcards in this deck.