Deck 9: Risk and the Cost of Capital

Full screen (f)
exit full mode
Question
Using a company's cost of capital to evaluate a project is
I.always correct;
II.always incorrect;
III.correct for projects that have average risk compared to the firm's other assets

A)I only
B)II only
C)III only
D)I and III only
Use Space or
up arrow
down arrow
to flip the card.
Question
The market value of XYZ Corporation's common stock is $40 million and the market value of its risk-free debt is $60 million. The beta of the company's common stock is 0.8 and the expected market risk premium is 10 percent. If the Treasury bill rate is 6 percent, what is the firm's cost of capital? (Assume no taxes.)

A)9.2 percent
B)14.0 percent
C)8.1 percent
D)10.8 percent
Question
The cost of capital for a project depends on

A)the company's cost of capital.
B)the use of the capital (the project).
C)the industry cost of capital.
D)the company's level of debt financing.
Question
The company cost of capital is the appropriate discount rate for a firm's

A)low-risk projects.
B)high-risk projects.
C)average-risk projects.
D)risk-free projects.
Question
If a firm uses the same company cost of capital for evaluating all projects, which situation(s)will likely occur?
I.The firm will reject good low-risk projects;
II.The firm will accept poor high-risk projects;
III.The firm will correctly accept projects with average risk

A)I only
B)I and II only
C)I,II, and III
D)II only
Question
Company A's historical returns for the past three years are 6 percent, 15 percent, and 15 percent. Similarly, the market portfolio's returns were 10 percent, 10 percent, and 16 percent. Calculate the beta for Stock A.

A)1.75
B)1.00
C)0.57
D)0.75
Question
If a firm uses a project-specific cost of capital for evaluating all projects, which situation(s)will likely occur?
I.The firm will accept poor low-risk projects.
II.The firm will reject good high-risk projects.
III.The firm will correctly accept projects with average risk.

A)I only
B)II only
C)III only
D)I, II, and III
Question
A firm's cost of equity can be estimated using the
I.discounted cash-flow (DCF)approach;
II.capital asset pricing model (CAPM);
III.arbitrage pricing theory

A)I and II
B)I and III
C)II and III
D)I, II, and III
Question
The market value of Charter Cruise Company's equity is $15 million and the market value of its debt is $5 million. If the required rate of return on the equity is 20 percent and that on its debt is 8 percent, calculate the company's cost of capital. (Assume no taxes.)

A)20 percent
B)17 percent
C)14 percent
D)11 percent
Question
The market value of Cable Company's equity is $60 million and the market value of its debt is $40 million. If the required rate of return on the equity is 15 percent and that on its debt is 5 percent, calculate the company's cost of capital. (Assume no taxes.)

A)15 percent
B)10 percent
C)11 percent
D)9 percent
Question
One calculates the after-tax weighted average cost of capital (WACC)using which of the following formulas?

A)WACC = (rD)(D/V)+ (rE)(E/V), where V = D + E.
B)WACC = (rD)(1 − TC)(D/V)+ (rE)(1 − TC)(E/V), where V = D + E.
C)WACC = (rD)(D/E)+ (rE)(E/D).
D)WACC = (rD)(1 − TC)(D/V)+ (rE)(E/V), where V = D + E.
Question
The market value of Charcoal Corporation's common stock is $20 million, and the market value of its risk-free debt is $5 million. The beta of the company's common stock is 1.25, and the market risk premium is 8 percent. If the Treasury bill rate is 5 percent, what is the company's cost of capital? (Assume no taxes.)

A)15.0 percent
B)14.6 percent
C)13.0 percent
D)7.0 percent
Question
Which of the following types of projects has the lowest unique risk?

A)Speculative ventures
B)New products
C)Expansions of existing business
D)Cost improvements
Question
Which of the following types of projects generally have the highest total risk?

A)Speculative ventures
B)New products
C)Expansions of existing business
D)Cost improvements using known technology
Question
A firm might categorize its projects into
I.cost improvements;
II.expansion projects (existing business);
III.new products;
IV.speculative ventures

A)III only
B)I, II, and III only.
C)II and IV only
D)I, II, III, and IV
Question
Which of the following types of projects has average total risk?

A)Speculative ventures
B)New products
C)Expansions of existing business
D)Cost improvements
Question
The hurdle rate for capital budgeting decisions is

A)the cost of capital.
B)the cost of debt.
C)the cost of equity.
D)the risk-free rate.
Question
The cost of capital is the same as the cost of equity for firms that are financed

A)entirely by debt.
B)by both debt and equity.
C)entirely by equity.
D)by 50 percent equity and 50 percent debt.
Question
A firm's cost of equity can be estimated using the

A)Fama-French three-factor model.
B)capital asset pricing model (CAPM).
C)arbitrage pricing theory (APT).
D)All of the options are correct.
Question
The company cost of capital, when the firm has both debt and equity financing, is called the

A)cost of debt.
B)cost of equity.
C)weighted average cost of capital (WACC).
D)return on equity (ROE).
Question
A project has an expected risky cash flow of $500 in year 3. The risk-free rate is 4 percent, the expected market rate of return is 14 percent, and the project's beta is 1.20. Calculate the certainty equivalent cash flow for year 3, CEQ3.

A)$622.04
B)$360.33
C)$401.90
D)$693.82
Question
Which of the following informational updates would prompt a financial manager to use a higher cost of capital to analyze a project?

A)Sales estimates from the marketing department have been less accurate of late.
B)The treasurer has recently indicated that the firm will increase its use of debt financing.
C)The treasurer has recently indicated that the firm will decrease its use of debt financing.
D)Recent estimates indicate the project has a greater percentage of fixed costs than previously thought.
Question
The historical returns for the past three years for Stock B and the stock market portfolio were Stock B: 24 percent, 0 percent, 24 percent; market portfolio: 10 percent, 12 percent, 20 percent. Calculate the observed variance of the market portfolio returns. (Ignore the correction for the loss of a degree of freedom set out in the text.)

A)192.0
B)128.0
C)28.0
D)18.7
Question
The historical returns for the past three years for Stock B and the stock market portfolio are Stock B: 24 percent, 0 percent, 24 percent; market portfolio: 10 percent, 12 percent, 20 percent. Calculate the average return for Stock B and the market portfolio.

A)Stock B: 16 percent; market portfolio: 14 percent
B)Stock B: 14 percent; market portfolio: 16 percent
C)Stock B: 24 percent; market portfolio: 12 percent
D)Stock B: 12 percent; market portfolio: 16 percent
Question
The historical returns for the past three years for Stock B and the stock market portfolio were Stock B: 24 percent, 0 percent, 24 percent; market portfolio: 10 percent, 12 percent, 20 percent. Calculate the observed covariance of returns between Stock B and the market portfolio. (Ignore the correction for the loss of a degree of freedom set out in the text.)

A)16
B)28
C)36
D)292
Question
Company A's historical returns for the past three years are 6 percent, 15 percent, and 15 percent. Similarly, the market portfolio's returns were 10 percent, 10 percent, and 16 percent. Suppose the risk-free rate of return is 4 percent and that investors expect the market to return 10 percent. What is the cost of equity capital (required rate of return of company A's common stock), computed with the CAPM?

A)8.5 percent
B)14.0 percent
C)12.0 percent
D)10.0 percent
Question
The market portfolio's historical returns for the past three years were 10 percent, 10 percent, and 16 percent. Suppose the risk-free rate of return is 4 percent. Estimate the market risk premium.

A)4 percent
B)8 percent
C)12 percent
D)16 percent
Question
Financial slang referring to the reduction of cash flows from a project's forecasted value to its certainty equivalent is a(n)

A)deep discount.
B)haircut for risk.
C)arbitrage profit.
D)speculative gain.
Question
Generally, for CAPM calculations, the value to use for the risk-free interest rate is the

A)short-term U.S. Treasury bill rate.
B)long-term corporate bond rate.
C)medium-term corporate bond rate.
D)medium-term average rate on common stocks.
Question
An analyst computes the beta of the computer company WinDoze as 1.7 and the standard error of the estimate as 0.3. What is the 95 percent confidence interval for the calculated beta?

A)1.1 - 2.3
B)1.4 - 2.0
C)1.7 - 2.0
D)1.4 - 1.7
Question
The historical returns for the past four years for Stock C and the stock market portfolio are Stock C: 10 percent, 30 percent, 20 percent, 20 percent; market portfolio: 5 percent, 15 percent, 25 percent, 15 percent. Calculate the beta of Stock C.

A)0.86
B)0.50
C)1.50
D)0.38
Question
The historical returns for the past three years for Stock B and the stock market portfolio are Stock B: 24 percent, 0 percent, 24 percent; market portfolio: 10 percent, 12 percent, 20 percent. Calculate the beta for Stock B.

A)0.86
B)1.00
C)1.13
D)1.17
Question
Company A's historical returns for the past three years were 6 percent, 15 percent, and 15 percent. Similarly, the market portfolio's returns were 10 percent, 10 percent, and 16 percent. According to the security market line (SML), Stock A was

A)overpriced.
B)underpriced.
C)correctly priced.
D)More information is needed.
Question
The historical returns for the past three years for Stock B and the stock market portfolio are Stock B: 24 percent, 0 percent, 24 percent; market portfolio: 10 percent, 12 percent, 20 percent. The expected market return is 12 percent. Calculate the required rate of return (cost of equity)for Stock B using the CAPM. (The risk-free rate of return = 4%.)

A)8.6 percent
B)12.6 percent
C)10.9 percent
D)16.0 percent
Question
On a graph with common stock returns on the y-axis and market returns on the x-axis, the slope of the regression line represents

A)alpha.
B)beta.
C)R-squared.
D)standard error.
Question
A project has an expected risky cash flow of $200 in year 1. The risk-free rate is 6 percent, the expected market rate of return is 16 percent, and the project's beta is 1.50. Calculate the certainty equivalent cash flow for year 1, CEQ1.

A)$175.21
B)$165.29
C)$228.30
D)$182.76
Question
A project has an expected risky cash flow of $500 in year 2. The risk-free rate is 4 percent, the expected market rate of return is 14 percent, and the project's beta is 1.20. Calculate the certainty equivalent cash flow for year 2, CEQ2.

A)$622.04
B)$164.29
C)$401.90
D)$416.13
Question
The historical returns for the past four years for Stock C and the stock market portfolio are Stock C: 10 percent, 30 percent, 20 percent, 20 percent; market portfolio: 5 percent, 15 percent, 25 percent, 15 percent. If the risk-free rate of return is 5 percent and the expected market return is 12 percent, calculate the required rate of return on Stock C using the CAPM.

A)5.0 percent
B)10.0 percent
C)8.5 percent
D)13.0 percent
Question
The historical returns for the past three years for Stock B and the stock market portfolio are Stock B: 24 percent, 0 percent, 24 percent; market portfolio: 10 percent, 12 percent, 20 percent. If the risk-free rate is 4 percent, calculate the market risk premium.

A)18.1 percent
B)14.0 percent
C)10.0 percent
D)6.0 percent
Question
A project has an expected cash flow of $300 in year 3. The risk-free rate is 5 percent, the market risk premium is 8 percent, and the project's beta is 1.25. Calculate the certainty equivalent cash flow for year 3, CEQ3.

A)$228.35
B)$197.25
C)$300.00
D)$270.02
Question
An analyst should evaluate each project at its own opportunity cost of capital. The true cost of capital depends on the particular use of that capital.
Question
An example of diversifiable risk that a financial manager should ignore when analyzing a project's risk would include

A)commodity price changes.
B)labor costs.
C)overall stock price fluctuations.
D)risks of government nonapproval of the project.
Question
A higher standard error of a beta estimate indicates both a less-reliable estimate and a larger confidence interval.
Question
Firms with high operating leverage tend to have higher asset betas.
Question
Portfolio betas for an industry are usually higher than the average betas of individual stocks in that same industry.
Question
The company cost of capital is the cost of debt of the firm.
Question
Risky projects can be evaluated by discounting expected cash flows at a risk-adjusted discount rate.
Question
For firms with relatively high levels of debt, the company cost of capital is the cost of equity of the firm.
Question
An analyst computes a beta coefficient with a low standard error. This implies that

A)this particular beta is more reliable than most.
B)this particular beta has little meaning.
C)too few observations were used to compute this particular beta.
D)this stock responds less to market changes than most stocks.
Question
Firms with cyclical revenues tend to have lower asset betas.
Question
Suppose that an analyst incorrectly calculates WACCs using book values of debt and equity instead of market values. The resulting WACC estimates will generally be too high.
Question
The company cost of capital is the correct discount rate for any project undertaken by the company.
Question
Generally, an industry beta, calculated from a portfolio of companies in the same industry, is more accurate than a beta estimate for a single company.
Question
The company cost of capital is the correct discount rate only for investments that have the same risk as the company's overall business.
Question
Projects with great amounts of diversifiable risk should generally have higher company costs of capital.
Question
One calculates the weighted average cost of capital (WACC), on an after-tax basis, as WACC = (rD)(1 − TC )(D/V)+ (rE)(E/V), where V = D + E.
Question
Generally, one should use the short-term Treasury bill rate for the risk-free rate.
Question
Which of the following projects most likely has the lowest cost of capital?

A)Construction of a new steel factory
B)Investment in latest-technology, high-end television production
C)Construction of a luxury resort
D)Investment in a gold-mining operation
Question
Cyclical firms tend to have high betas.
Question
Risky projects can be evaluated by discounting certainty equivalent cash flows at the risk-free interest rate.
Question
Briefly discuss the risk-adjusted discount rate approach to estimating the NPV of a project.
Question
The cost of capital is always less than or equal to the cost of equity.
Question
Briefly explain how a firm's cost of equity is estimated using the capital asset pricing model (CAPM).
Question
Briefly explain how the use of a single company cost of capital to evaluate all projects might lead to erroneous decisions.
Question
In general, one should use higher discount rates for longer-term projects.
Question
Briefly explain, when using the CAPM, which value should be used for the risk-free interest rate.
Question
Why do firms with large cash-flow betas also have high asset betas?
Question
If one uses a long-term risk-free rate for the CAPM instead of a short-term risk-free rate, then one will generate a flatter security market line.
Question
A sensible way for a manager to account for overoptimistic cash-flow forecasts is to adjust the discount rate.
Question
A manager who adjusts discount rates by using a "fudge factor" is more likely to penalize short-term projects as opposed to long-term projects.
Question
Briefly explain the difference between company and project cost of capital.
Question
Companies with high ratios of fixed costs to project values tend to have high betas.
Question
A pure play is a comparable firm that specializes in one activity.
Question
Discuss why one might use an industry beta to estimate a company's cost of capital.
Question
Briefly describe the factors that determine asset betas.
Question
Briefly discuss the certainty equivalent approach to estimating the NPV of a project.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/76
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 9: Risk and the Cost of Capital
1
Using a company's cost of capital to evaluate a project is
I.always correct;
II.always incorrect;
III.correct for projects that have average risk compared to the firm's other assets

A)I only
B)II only
C)III only
D)I and III only
III only
2
The market value of XYZ Corporation's common stock is $40 million and the market value of its risk-free debt is $60 million. The beta of the company's common stock is 0.8 and the expected market risk premium is 10 percent. If the Treasury bill rate is 6 percent, what is the firm's cost of capital? (Assume no taxes.)

A)9.2 percent
B)14.0 percent
C)8.1 percent
D)10.8 percent
9.2 percent
3
The cost of capital for a project depends on

A)the company's cost of capital.
B)the use of the capital (the project).
C)the industry cost of capital.
D)the company's level of debt financing.
the use of the capital (the project).
4
The company cost of capital is the appropriate discount rate for a firm's

A)low-risk projects.
B)high-risk projects.
C)average-risk projects.
D)risk-free projects.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
5
If a firm uses the same company cost of capital for evaluating all projects, which situation(s)will likely occur?
I.The firm will reject good low-risk projects;
II.The firm will accept poor high-risk projects;
III.The firm will correctly accept projects with average risk

A)I only
B)I and II only
C)I,II, and III
D)II only
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
6
Company A's historical returns for the past three years are 6 percent, 15 percent, and 15 percent. Similarly, the market portfolio's returns were 10 percent, 10 percent, and 16 percent. Calculate the beta for Stock A.

A)1.75
B)1.00
C)0.57
D)0.75
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
7
If a firm uses a project-specific cost of capital for evaluating all projects, which situation(s)will likely occur?
I.The firm will accept poor low-risk projects.
II.The firm will reject good high-risk projects.
III.The firm will correctly accept projects with average risk.

A)I only
B)II only
C)III only
D)I, II, and III
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
8
A firm's cost of equity can be estimated using the
I.discounted cash-flow (DCF)approach;
II.capital asset pricing model (CAPM);
III.arbitrage pricing theory

A)I and II
B)I and III
C)II and III
D)I, II, and III
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
9
The market value of Charter Cruise Company's equity is $15 million and the market value of its debt is $5 million. If the required rate of return on the equity is 20 percent and that on its debt is 8 percent, calculate the company's cost of capital. (Assume no taxes.)

A)20 percent
B)17 percent
C)14 percent
D)11 percent
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
10
The market value of Cable Company's equity is $60 million and the market value of its debt is $40 million. If the required rate of return on the equity is 15 percent and that on its debt is 5 percent, calculate the company's cost of capital. (Assume no taxes.)

A)15 percent
B)10 percent
C)11 percent
D)9 percent
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
11
One calculates the after-tax weighted average cost of capital (WACC)using which of the following formulas?

A)WACC = (rD)(D/V)+ (rE)(E/V), where V = D + E.
B)WACC = (rD)(1 − TC)(D/V)+ (rE)(1 − TC)(E/V), where V = D + E.
C)WACC = (rD)(D/E)+ (rE)(E/D).
D)WACC = (rD)(1 − TC)(D/V)+ (rE)(E/V), where V = D + E.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
12
The market value of Charcoal Corporation's common stock is $20 million, and the market value of its risk-free debt is $5 million. The beta of the company's common stock is 1.25, and the market risk premium is 8 percent. If the Treasury bill rate is 5 percent, what is the company's cost of capital? (Assume no taxes.)

A)15.0 percent
B)14.6 percent
C)13.0 percent
D)7.0 percent
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following types of projects has the lowest unique risk?

A)Speculative ventures
B)New products
C)Expansions of existing business
D)Cost improvements
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
14
Which of the following types of projects generally have the highest total risk?

A)Speculative ventures
B)New products
C)Expansions of existing business
D)Cost improvements using known technology
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
15
A firm might categorize its projects into
I.cost improvements;
II.expansion projects (existing business);
III.new products;
IV.speculative ventures

A)III only
B)I, II, and III only.
C)II and IV only
D)I, II, III, and IV
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
16
Which of the following types of projects has average total risk?

A)Speculative ventures
B)New products
C)Expansions of existing business
D)Cost improvements
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
17
The hurdle rate for capital budgeting decisions is

A)the cost of capital.
B)the cost of debt.
C)the cost of equity.
D)the risk-free rate.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
18
The cost of capital is the same as the cost of equity for firms that are financed

A)entirely by debt.
B)by both debt and equity.
C)entirely by equity.
D)by 50 percent equity and 50 percent debt.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
19
A firm's cost of equity can be estimated using the

A)Fama-French three-factor model.
B)capital asset pricing model (CAPM).
C)arbitrage pricing theory (APT).
D)All of the options are correct.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
20
The company cost of capital, when the firm has both debt and equity financing, is called the

A)cost of debt.
B)cost of equity.
C)weighted average cost of capital (WACC).
D)return on equity (ROE).
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
21
A project has an expected risky cash flow of $500 in year 3. The risk-free rate is 4 percent, the expected market rate of return is 14 percent, and the project's beta is 1.20. Calculate the certainty equivalent cash flow for year 3, CEQ3.

A)$622.04
B)$360.33
C)$401.90
D)$693.82
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following informational updates would prompt a financial manager to use a higher cost of capital to analyze a project?

A)Sales estimates from the marketing department have been less accurate of late.
B)The treasurer has recently indicated that the firm will increase its use of debt financing.
C)The treasurer has recently indicated that the firm will decrease its use of debt financing.
D)Recent estimates indicate the project has a greater percentage of fixed costs than previously thought.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
23
The historical returns for the past three years for Stock B and the stock market portfolio were Stock B: 24 percent, 0 percent, 24 percent; market portfolio: 10 percent, 12 percent, 20 percent. Calculate the observed variance of the market portfolio returns. (Ignore the correction for the loss of a degree of freedom set out in the text.)

A)192.0
B)128.0
C)28.0
D)18.7
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
24
The historical returns for the past three years for Stock B and the stock market portfolio are Stock B: 24 percent, 0 percent, 24 percent; market portfolio: 10 percent, 12 percent, 20 percent. Calculate the average return for Stock B and the market portfolio.

A)Stock B: 16 percent; market portfolio: 14 percent
B)Stock B: 14 percent; market portfolio: 16 percent
C)Stock B: 24 percent; market portfolio: 12 percent
D)Stock B: 12 percent; market portfolio: 16 percent
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
25
The historical returns for the past three years for Stock B and the stock market portfolio were Stock B: 24 percent, 0 percent, 24 percent; market portfolio: 10 percent, 12 percent, 20 percent. Calculate the observed covariance of returns between Stock B and the market portfolio. (Ignore the correction for the loss of a degree of freedom set out in the text.)

A)16
B)28
C)36
D)292
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
26
Company A's historical returns for the past three years are 6 percent, 15 percent, and 15 percent. Similarly, the market portfolio's returns were 10 percent, 10 percent, and 16 percent. Suppose the risk-free rate of return is 4 percent and that investors expect the market to return 10 percent. What is the cost of equity capital (required rate of return of company A's common stock), computed with the CAPM?

A)8.5 percent
B)14.0 percent
C)12.0 percent
D)10.0 percent
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
27
The market portfolio's historical returns for the past three years were 10 percent, 10 percent, and 16 percent. Suppose the risk-free rate of return is 4 percent. Estimate the market risk premium.

A)4 percent
B)8 percent
C)12 percent
D)16 percent
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
28
Financial slang referring to the reduction of cash flows from a project's forecasted value to its certainty equivalent is a(n)

A)deep discount.
B)haircut for risk.
C)arbitrage profit.
D)speculative gain.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
29
Generally, for CAPM calculations, the value to use for the risk-free interest rate is the

A)short-term U.S. Treasury bill rate.
B)long-term corporate bond rate.
C)medium-term corporate bond rate.
D)medium-term average rate on common stocks.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
30
An analyst computes the beta of the computer company WinDoze as 1.7 and the standard error of the estimate as 0.3. What is the 95 percent confidence interval for the calculated beta?

A)1.1 - 2.3
B)1.4 - 2.0
C)1.7 - 2.0
D)1.4 - 1.7
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
31
The historical returns for the past four years for Stock C and the stock market portfolio are Stock C: 10 percent, 30 percent, 20 percent, 20 percent; market portfolio: 5 percent, 15 percent, 25 percent, 15 percent. Calculate the beta of Stock C.

A)0.86
B)0.50
C)1.50
D)0.38
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
32
The historical returns for the past three years for Stock B and the stock market portfolio are Stock B: 24 percent, 0 percent, 24 percent; market portfolio: 10 percent, 12 percent, 20 percent. Calculate the beta for Stock B.

A)0.86
B)1.00
C)1.13
D)1.17
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
33
Company A's historical returns for the past three years were 6 percent, 15 percent, and 15 percent. Similarly, the market portfolio's returns were 10 percent, 10 percent, and 16 percent. According to the security market line (SML), Stock A was

A)overpriced.
B)underpriced.
C)correctly priced.
D)More information is needed.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
34
The historical returns for the past three years for Stock B and the stock market portfolio are Stock B: 24 percent, 0 percent, 24 percent; market portfolio: 10 percent, 12 percent, 20 percent. The expected market return is 12 percent. Calculate the required rate of return (cost of equity)for Stock B using the CAPM. (The risk-free rate of return = 4%.)

A)8.6 percent
B)12.6 percent
C)10.9 percent
D)16.0 percent
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
35
On a graph with common stock returns on the y-axis and market returns on the x-axis, the slope of the regression line represents

A)alpha.
B)beta.
C)R-squared.
D)standard error.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
36
A project has an expected risky cash flow of $200 in year 1. The risk-free rate is 6 percent, the expected market rate of return is 16 percent, and the project's beta is 1.50. Calculate the certainty equivalent cash flow for year 1, CEQ1.

A)$175.21
B)$165.29
C)$228.30
D)$182.76
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
37
A project has an expected risky cash flow of $500 in year 2. The risk-free rate is 4 percent, the expected market rate of return is 14 percent, and the project's beta is 1.20. Calculate the certainty equivalent cash flow for year 2, CEQ2.

A)$622.04
B)$164.29
C)$401.90
D)$416.13
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
38
The historical returns for the past four years for Stock C and the stock market portfolio are Stock C: 10 percent, 30 percent, 20 percent, 20 percent; market portfolio: 5 percent, 15 percent, 25 percent, 15 percent. If the risk-free rate of return is 5 percent and the expected market return is 12 percent, calculate the required rate of return on Stock C using the CAPM.

A)5.0 percent
B)10.0 percent
C)8.5 percent
D)13.0 percent
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
39
The historical returns for the past three years for Stock B and the stock market portfolio are Stock B: 24 percent, 0 percent, 24 percent; market portfolio: 10 percent, 12 percent, 20 percent. If the risk-free rate is 4 percent, calculate the market risk premium.

A)18.1 percent
B)14.0 percent
C)10.0 percent
D)6.0 percent
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
40
A project has an expected cash flow of $300 in year 3. The risk-free rate is 5 percent, the market risk premium is 8 percent, and the project's beta is 1.25. Calculate the certainty equivalent cash flow for year 3, CEQ3.

A)$228.35
B)$197.25
C)$300.00
D)$270.02
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
41
An analyst should evaluate each project at its own opportunity cost of capital. The true cost of capital depends on the particular use of that capital.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
42
An example of diversifiable risk that a financial manager should ignore when analyzing a project's risk would include

A)commodity price changes.
B)labor costs.
C)overall stock price fluctuations.
D)risks of government nonapproval of the project.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
43
A higher standard error of a beta estimate indicates both a less-reliable estimate and a larger confidence interval.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
44
Firms with high operating leverage tend to have higher asset betas.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
45
Portfolio betas for an industry are usually higher than the average betas of individual stocks in that same industry.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
46
The company cost of capital is the cost of debt of the firm.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
47
Risky projects can be evaluated by discounting expected cash flows at a risk-adjusted discount rate.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
48
For firms with relatively high levels of debt, the company cost of capital is the cost of equity of the firm.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
49
An analyst computes a beta coefficient with a low standard error. This implies that

A)this particular beta is more reliable than most.
B)this particular beta has little meaning.
C)too few observations were used to compute this particular beta.
D)this stock responds less to market changes than most stocks.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
50
Firms with cyclical revenues tend to have lower asset betas.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
51
Suppose that an analyst incorrectly calculates WACCs using book values of debt and equity instead of market values. The resulting WACC estimates will generally be too high.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
52
The company cost of capital is the correct discount rate for any project undertaken by the company.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
53
Generally, an industry beta, calculated from a portfolio of companies in the same industry, is more accurate than a beta estimate for a single company.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
54
The company cost of capital is the correct discount rate only for investments that have the same risk as the company's overall business.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
55
Projects with great amounts of diversifiable risk should generally have higher company costs of capital.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
56
One calculates the weighted average cost of capital (WACC), on an after-tax basis, as WACC = (rD)(1 − TC )(D/V)+ (rE)(E/V), where V = D + E.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
57
Generally, one should use the short-term Treasury bill rate for the risk-free rate.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
58
Which of the following projects most likely has the lowest cost of capital?

A)Construction of a new steel factory
B)Investment in latest-technology, high-end television production
C)Construction of a luxury resort
D)Investment in a gold-mining operation
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
59
Cyclical firms tend to have high betas.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
60
Risky projects can be evaluated by discounting certainty equivalent cash flows at the risk-free interest rate.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
61
Briefly discuss the risk-adjusted discount rate approach to estimating the NPV of a project.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
62
The cost of capital is always less than or equal to the cost of equity.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
63
Briefly explain how a firm's cost of equity is estimated using the capital asset pricing model (CAPM).
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
64
Briefly explain how the use of a single company cost of capital to evaluate all projects might lead to erroneous decisions.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
65
In general, one should use higher discount rates for longer-term projects.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
66
Briefly explain, when using the CAPM, which value should be used for the risk-free interest rate.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
67
Why do firms with large cash-flow betas also have high asset betas?
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
68
If one uses a long-term risk-free rate for the CAPM instead of a short-term risk-free rate, then one will generate a flatter security market line.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
69
A sensible way for a manager to account for overoptimistic cash-flow forecasts is to adjust the discount rate.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
70
A manager who adjusts discount rates by using a "fudge factor" is more likely to penalize short-term projects as opposed to long-term projects.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
71
Briefly explain the difference between company and project cost of capital.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
72
Companies with high ratios of fixed costs to project values tend to have high betas.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
73
A pure play is a comparable firm that specializes in one activity.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
74
Discuss why one might use an industry beta to estimate a company's cost of capital.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
75
Briefly describe the factors that determine asset betas.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
76
Briefly discuss the certainty equivalent approach to estimating the NPV of a project.
Unlock Deck
Unlock for access to all 76 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 76 flashcards in this deck.