Deck 8: Facility and Work Design
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/34
Play
Full screen (f)
Deck 8: Facility and Work Design
1
Three work study analysts are rating an employee.Work study analyst 1 rates the employee at performance rating factor = 1.0 and an observed time of 2.8 minutes per unit.Work study analyst 2 rates the employee at PRF = 1.1 and an OT of 3.1 minutes per unit.Work study analyst 3 rates the employee at PRF = 0.8 and an OT of 3.0 minutes per unit.What should the standard time be,assuming an allowance factor of 20%?
A) 3.560 minutes per unit
B) 3.339 minutes per unit
C) 3.444 minutes per unit
D) 3.667 minutes per unit
A) 3.560 minutes per unit
B) 3.339 minutes per unit
C) 3.444 minutes per unit
D) 3.667 minutes per unit
3.444 minutes per unit
2
_____ is concerned with improving productivity and safety by designing workplaces,equipment,instruments,computers,workstations,and so on that take into account the physical capabilities of people.
A) Ergonomics
B) Employee motivation
C) Job design
D) Job enrichment
A) Ergonomics
B) Employee motivation
C) Job design
D) Job enrichment
Ergonomics
3
_____ is the interval between successive outputs coming off the assembly line.
A) Idle time
B) Cycle time
C) Lack-of-work delay
D) Blocking delay
A) Idle time
B) Cycle time
C) Lack-of-work delay
D) Blocking delay
Cycle time
4
The design of service facilities requires the clever integration of layout with the servicescape and process design to support service encounters.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
5
A Gallup study showed that there is no significant difference found in the productivities among workers who are allowed to personalize their workplaces and those who are not.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
6
Which of the following is true of a cellular layout?
A) It remains stationary rather than moving work-in-process from one work center to another.
B) Its workflow is not standardized.
C) It is not designed according to the functional characteristics of equipment.
D) Its quality problems are not addressed timely.
A) It remains stationary rather than moving work-in-process from one work center to another.
B) Its workflow is not standardized.
C) It is not designed according to the functional characteristics of equipment.
D) Its quality problems are not addressed timely.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
7
Organizations that need the ability to provide a wide variety of services to customers with differing requirements usually use a _____ layout.
A) cellular
B) process
C) fixed-position
D) product
A) cellular
B) process
C) fixed-position
D) product
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
8
A _____ layout is an arrangement based on the sequence of operations that is performed during the manufacturing of a good or delivery of a service.
A) product
B) process
C) cellular
D) fixed-position
A) product
B) process
C) cellular
D) fixed-position
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
9
_____ is a technique to group tasks among workstations so that each workstation has-in the ideal case-the same amount of work.
A) Job enlargement
B) Assembly-line balancing
C) Cellular manufacturing
D) Job enrichment
A) Job enlargement
B) Assembly-line balancing
C) Cellular manufacturing
D) Job enrichment
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
10
FancyTrends Inc.,a handbag manufacturing company,assembles handbags in an assembly line using 10 workstations.The target output for an 8 hour workday is 120 bags.The sum of the task times is 30 minutes/bag.The cycle time is 4 minutes/bag.The assembly-line efficiency is _____.
A) 65%
B) 70%
C) 75%
D) 80%
A) 65%
B) 70%
C) 75%
D) 80%
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
11
In a cellular layout,additional floor space is required because machines are not very closely linked within a cell.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
12
Compared to product layouts,process layouts:
A) require a lower investment in equipment.
B) provide less flexibility.
C) have high equipment utilization.
D) have less materials-handling costs.
A) require a lower investment in equipment.
B) provide less flexibility.
C) have high equipment utilization.
D) have less materials-handling costs.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following is a limitation of a process layout?
A) It affects the entire system if any equipment in the layout fails.
B) It has higher worker skill requirements.
C) It has highly specialized equipment requirements.
D) It generally requires a low investment for the production of machines.
A) It affects the entire system if any equipment in the layout fails.
B) It has higher worker skill requirements.
C) It has highly specialized equipment requirements.
D) It generally requires a low investment for the production of machines.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
14
_____ layouts usually require a high level of planning and control compared with other types of facility layouts.
A) Product
B) Process
C) Cellular
D) Fixed-position
A) Product
B) Process
C) Cellular
D) Fixed-position
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
15
Research has shown that bringing the outdoor environment into the workplace lowers stress.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
16
Process layouts require simple planning and control systems.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
17
According to a study conducted by Software Advice,the likelihood of consumers buying a particular product remains unaffected even when the production of that product causes reduced environmental impact.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
18
The production of large goods such as ships is best accomplished using a _____ layout.
A) product
B) process
C) cellular
D) fixed-position
A) product
B) process
C) cellular
D) fixed-position
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
19
In the context of assembly-line balancing,_____ is the difference between total time available and the sum of the actual times for productive tasks.
A) blocking delay
B) lack-of-work delay
C) idle time
D) cycle time
A) blocking delay
B) lack-of-work delay
C) idle time
D) cycle time
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
20
Facility layout does not enhance sustainability in service-producing organizations.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
21
One of the advantages of a product layout is that it:
A) can easily accommodate a change in product design.
B) has low work-in-process inventories.
C) does not usually require highly specialized equipment.
D) can easily accommodate new products.
A) can easily accommodate a change in product design.
B) has low work-in-process inventories.
C) does not usually require highly specialized equipment.
D) can easily accommodate new products.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
22
In a cellular layout,the procedure of classifying parts with similar processing requirements into families is called _____.
A) group technology
B) traits analysis
C) batch processing
D) commonality identification
A) group technology
B) traits analysis
C) batch processing
D) commonality identification
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
23
_____ is vertical expansion of job duties to give the worker more responsibility.
A) Employee empowerment
B) Job enlargement
C) Employee recognition
D) Job enrichment
A) Employee empowerment
B) Job enlargement
C) Employee recognition
D) Job enrichment
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
24
Identify the most suitable layout for a facility that handles a wide variety of customized orders.
A) A fixed-position layout
B) A cellular layout
C) A product layout
D) A process layout
A) A fixed-position layout
B) A cellular layout
C) A product layout
D) A process layout
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
25
Megan plans the facility layout of her new shop that would sell a variety of healthcare industry machines.She arranges the machines in a way that the machines are grouped according to their functions.Which of the following types of facility layouts has Megan used in her shop?
A) A process layout
B) A product layout
C) A cellular layout
D) A fixed-position layout
A) A process layout
B) A product layout
C) A cellular layout
D) A fixed-position layout
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
26
One of the differences between product layouts and process layouts is that unlike product layouts,process layouts:
A) require highly specialized equipment.
B) provide more flexibility.
C) have higher automation potential.
D) have less materials-handling costs.
A) require highly specialized equipment.
B) provide more flexibility.
C) have higher automation potential.
D) have less materials-handling costs.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
27
An assembly line with 30 activities is to be balanced.The total amount of time required for all 30 activities is 45 minutes.The line will operate for 360 minutes per day.Which of the following must be the cycle time to achieve an output rate of 200 units/day?
A) 0.66 minutes
B) 1.5 minutes
C) 1.8 minutes
D) 4.5 minutes
A) 0.66 minutes
B) 1.5 minutes
C) 1.8 minutes
D) 4.5 minutes
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
28
A _____ is a reasonable estimate of the amount of time needed to perform a task based on an analysis of the work by an operations expert.
A) standard time
B) time study
C) standard measurement
D) work measurement
A) standard time
B) time study
C) standard measurement
D) work measurement
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
29
One of the disadvantages of a product layout is that it has:
A) high materials handling.
B) high work-in-progress inventory.
C) low flexibility.
D) low labor utilization.
A) high materials handling.
B) high work-in-progress inventory.
C) low flexibility.
D) low labor utilization.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
30
Which of the following is true of fixed-position layouts?
A) The changeover requirements are low.
B) The automation potential is moderate.
C) The volume of product demand is high.
D) The equipment utilization is high.
A) The changeover requirements are low.
B) The automation potential is moderate.
C) The volume of product demand is high.
D) The equipment utilization is high.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
31
The objective of assembly-line balancing is to:
A) minimize the imbalance among workstations while trying to achieve a desired output rate.
B) maximize the cost of operations while trying to reduce the cycle time.
C) maximize the cycle time while trying to minimize the cost of operations.
D) minimize the imbalance among workstations while trying to maximize the cycle time.
A) minimize the imbalance among workstations while trying to achieve a desired output rate.
B) maximize the cost of operations while trying to reduce the cycle time.
C) maximize the cycle time while trying to minimize the cost of operations.
D) minimize the imbalance among workstations while trying to maximize the cycle time.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
32
The first approach to designing process layouts is used when it is difficult to obtain data on costs or volumes moved between departments.The second approach focuses on the costs associated with moving materials.Identify a major difference between these two approaches.
A) The first approach relies on materials-handling costs as the primary criterion while the second approach relies on a preference table that specifies the importance of two departments being close to one another.
B) The first approach relies on materials-handling costs as the primary criterion while the second approach uses the geometric centroid of each department.
C) The first approach uses the geometric centroid of each department while the second approach relies on materials-handling costs as the primary criterion.
D) The first approach relies on a preference table that specifies the importance of two departments being close to one another while the second approach relies on materials-handling costs as the primary criterion.
A) The first approach relies on materials-handling costs as the primary criterion while the second approach relies on a preference table that specifies the importance of two departments being close to one another.
B) The first approach relies on materials-handling costs as the primary criterion while the second approach uses the geometric centroid of each department.
C) The first approach uses the geometric centroid of each department while the second approach relies on materials-handling costs as the primary criterion.
D) The first approach relies on a preference table that specifies the importance of two departments being close to one another while the second approach relies on materials-handling costs as the primary criterion.
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
33
Which of the following is an objective of ergonomics?
A) To increase the cost of doing a job while reducing fatigue
B) To reduce energy requirements while increasing accuracy
C) To increase the possibility of human errors while decreasing the cost of training
D) To reduce the flexibility in an operation while increasing speed
A) To increase the cost of doing a job while reducing fatigue
B) To reduce energy requirements while increasing accuracy
C) To increase the possibility of human errors while decreasing the cost of training
D) To reduce the flexibility in an operation while increasing speed
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck
34
Which of the following types of facility layouts is best suited for a heavy machine tools factory?
A) A product layout
B) A process layout
C) A cellular layout
D) A fixed-position layout
A) A product layout
B) A process layout
C) A cellular layout
D) A fixed-position layout
Unlock Deck
Unlock for access to all 34 flashcards in this deck.
Unlock Deck
k this deck