Deck 6: Manufacturing Processes

Full screen (f)
exit full mode
Question
Engineer-to-order firms will work with the customer to design the product, and then make it from purchased materials, parts, and components.
Use Space or
up arrow
down arrow
to flip the card.
Question
The term "assembly line" refers to progressive assembly linked by some material handling device.
Question
A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate.
Question
An example of an assemble-to-order firm is Dell Computer.
Question
The closer the customer is to the customer order decoupling point the longer it takes the customer to receive the product.
Question
The closer the customer is to the customer order decoupling point the more quickly the customer receives the product.
Question
A project layout is characterized by a relatively low number of units produced in comparison with process and product layout formats.
Question
The time needed to respond to a customer's order is called the customer response time.
Question
A make-to-order firm will work with the customer to design the product, and then make it from purchased materials, parts, and components.
Question
One trade-off illustrated by the product-process matrix is between flexibility and cost.
Question
Process selection refers to the strategic decision of selecting which kind of production processes to use to produce a product or provide a service.
Question
The product-process matrix shows the relationship between process structures and product volume and variety characteristics.
Question
The volume requirements for the product are one determinant of the choice of which process structure to select.
Question
One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is discrete rather than continuous.
Question
The focus in the make-to-stock environment is on providing finished goods where and when the customers want them.
Question
The essential issue in satisfying customers in the make-to-stock environment is to balance the cost of the finished item against the willingness of the consumer to pay for it.
Question
Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.
Question
Work center layouts allocate dissimilar machines into cells to work on products that have dissimilar processing requirements.
Question
The essential issue in satisfying customers in the make-to-stock environment is to balance the level of finished inventory against the level of service to the customer.
Question
A project layout is characterized by a high degree of task ordering.
Question
For the purposes of assembly-line balancing, the required workstation cycle time is found by dividing production time per day by the required units of output per day.
Question
In balancing an assembly line, workstation cycle time has to be less than the time between successive units coming off the end of the line.
Question
A process map shows the physical location of the various processes within a supply chain.
Question
Using the assembly-line balancing procedure, which of the following is the required cycle time in minutes per unit if the daily production time is 480 minutes and the required daily output is 50 units?

A) 0.104
B) 50
C) 9.6
D) 480
E) Cannot be determined from the information above
Question
Little's law states that supply chain processes can be regarded as unrelated and thus treated and analyzed separately.
Question
Workstation cycle time is the time between successive units coming off the end of the assembly line.
Question
Using the assembly-line balancing procedure, which of the following is the required cycle time if the production time in minutes per day is 1,440 and the required output per day in units is 2,000?

A) 0.72
B) 1.388
C) 250
D) 500
E) Cannot be determined from the information above
Question
The assembly-line balancing procedure determines the precedence relationships of manufacturing tasks.
Question
If the sum of the task times required to produce a product is 45 minutes and the cycle time for the same product is 10 minutes. Thus, the theoretical minimum number of workstations is 5 using the assembly-line balancing procedure.
Question
A high-level map or diagram of a supply chain process can be useful to understand how material flows and where inventory is held.
Question
Little's law can be thought of as a relationship between units and time.
Question
Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 4, 6, 7, 2, 6, and 5 minutes, and the cycle time is 10 minutes?

A) 3
B) 5
C) 6
D) 8
E) None of these
Question
In designing a production layout a flexible line layout might have the shape of a "U".
Question
Assembling-to-order means moving the customer order decoupling point from finished goods to components.
Question
The efficiency of an assembly-line is found by a ratio of the sum of all task times divided by the cycle time.
Question
In assembly-line balancing the theoretical minimum number of workstations is found by a ratio of the sum of all task times divided by the cycle time.
Question
If the sum of the task times required to produce a product is 80 minutes and the cycle time for the same product is 15 minutes, the theoretical minimum number of workstations is 8 using the assembly-line balancing procedure.
Question
Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the eight tasks that make up the job are 7, 4, 7, 8, 9, 4, 3, and 6 minutes, and the cycle time is 8 minutes?

A) 3
B) 5
C) 6
D) 8
E) None of these
Question
The term "assembly line" refers to progressive assembly linked by some material handling device.
Question
The first step in balancing an assembly line is to specify the precedence relationships among tasks to be performed on the line.
Question
You have just determined the actual number of workstations that will be used on an assembly line to be 8 using the assembly-line balancing procedure. The cycle time of the line is 10 minutes and the sum of all that tasks required on the line is 60 minutes. Which of the following is the correct value for the resulting line's efficiency?

A) 0.500
B) 0.650
C) 0.750
D) 0.850
E) None of these
Question
In studying positioning of inventory in supply chains, which, if any, of the following is most appropriate? (Select all that apply.)

A) As order decoupling point moves towards source, inventory investment goes down.
B) As order decoupling point moves towards the source, customer lead time gets longer.
C) As order decoupling point moves towards the source, inventory investment increases.
D) As order decoupling point moves towards the source, customer lead time is unchanged.
Question
Which of the following is a basic type of process structure?

A) Process flow diagram
B) Product matrix
C) Process matrix
D) Workcenter
E) Manual assembly
Question
According to Little's Law, which of the following can be used to estimate work-in-process inventory?

A) Process time/Cycle time
B) Throughput rate times Flow time
C) Process velocity/Flow time
D) Set up time/Throughput rate
E) Value added time/Process velocity
Question
Which of the following is not a step in developing a manufacturing cell layout?

A) Grouping parts into families that follow a common sequence of steps
B) Identifying dominant flow patterns of parts families as a basis for location of processes
C) Physically grouping machines and processes into cells
D) Disposing of left-over machinery and outsourcing ungrouped processes
E) None of the above
Question
You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure. The cycle time of the line is 5 minutes and the sum of all that tasks required on the line is 25 minutes. Which of the following is the correct value for the resulting line's efficiency?

A) 0.500
B) 0.833
C) 0.973
D) 0.990
E) None of these
Question
Regarding the measures of inventory managing efficiency, identify the most appropriate answer. (Select all that apply.)

A) Total average value of inventory is equal to the selling price multiplied by finished goods inventory.
B) Inventory turn is the annual cost of goods sold multiplied by average inventory.
C) Days of supply is the inverse of inventory turns × 365.
D) Inventory turn is the annual cost of goods sold divided by average inventory.
Question
Which of the following is not a basic type of process structure?

A) Product-process matrix
B) Workcenter
C) Manufacturing cell
D) Assembly line
E) Continuous process
Question
A firm will work with a customer to design the product, and then make it from purchased materials, parts, and components. This firm is called:

A) a make to order firm.
B) an engineer to order firm.
C) a make to stock firm.
D) a customer service firm.
E) an assemble to order firm.
Question
Which of these expressions is Little's Law?

A) Inventory/Flow time = Throughput rate:
B) Inventory/Throughput Rate = Flow time
C) Inventory = Throughput rate × Flow time
D) Throughput Rate/Inventory = 1/Flow Time
E) All of the above
Question
In studying product-process matrix describing layout strategies, which of the following is most appropriate? (Select all that apply.)

A) As you move from project to manufacturing cell to continuous process, product volume increases while standardization increases.
B) As you move from project to manufacturing cell to continuous process, product volume decreases while standardization decreases.
C) As you move from project to manufacturing cell to continuous process, product volume increases while standardization decreases.
D) As you move from project to manufacturing cell to continuous process, product volume decreases while standardization increases.
Question
Which of the following is not considered a major work flow structure?

A) Work Center
B) Project
C) Assembly line
D) Fabrication
E) Continuous Flow
Question
A difference between project and continuous flow categories of process flow structures is which two of the following?

A) The size and bulk of the product
B) Discrete parts moving from workstation to workstation
C) Degree of equipment specialization
D) Being a "Virtual Factory"
E) Profit per unit
Question
According to Little's Law, which of the following ratios is used to find throughput rate?

A) Cycle time/Process time
B) Throughput time/Process velocity
C) Process velocity/Throughput time
D) Inventory /Flow time
E) Value added time/Process velocity
Question
The placement of which of the following is not determined by production process organization decisions?

A) Departments
B) Workgroups
C) Workstations
D) Machines
E) Emergency exits
Question
Which of the following basic types of process structures is one which similar equipment or functions are grouped together?

A) Project
B) Workcenter
C) Manufacturing cell
D) Assembly line
E) Continuous process
Question
When balancing an assembly line, which of the following is not a way to reduce the longest task time below the required workstation cycle time?

A) Upgrade the equipment
B) Assign a roaming helper to support the line
C) Split the task between two workstations
D) Speed up the assembly line transfer mechanism
E) Use a more skilled worker
Question
A firm fills its customer's orders from finished goods inventory. It is a:

A) make to order firm.
B) engineer to order firm.
C) make to stock firm.
D) customer service firm.
E) assemble to order firm.
Question
Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps by which the product is made?

A) Project
B) Workcenter
C) Manufacturing cell
D) Assembly line
E) Continuous process
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/59
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 6: Manufacturing Processes
1
Engineer-to-order firms will work with the customer to design the product, and then make it from purchased materials, parts, and components.
True
2
The term "assembly line" refers to progressive assembly linked by some material handling device.
True
3
A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate.
False
4
An example of an assemble-to-order firm is Dell Computer.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
5
The closer the customer is to the customer order decoupling point the longer it takes the customer to receive the product.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
6
The closer the customer is to the customer order decoupling point the more quickly the customer receives the product.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
7
A project layout is characterized by a relatively low number of units produced in comparison with process and product layout formats.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
8
The time needed to respond to a customer's order is called the customer response time.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
9
A make-to-order firm will work with the customer to design the product, and then make it from purchased materials, parts, and components.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
10
One trade-off illustrated by the product-process matrix is between flexibility and cost.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
11
Process selection refers to the strategic decision of selecting which kind of production processes to use to produce a product or provide a service.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
12
The product-process matrix shows the relationship between process structures and product volume and variety characteristics.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
13
The volume requirements for the product are one determinant of the choice of which process structure to select.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
14
One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is discrete rather than continuous.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
15
The focus in the make-to-stock environment is on providing finished goods where and when the customers want them.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
16
The essential issue in satisfying customers in the make-to-stock environment is to balance the cost of the finished item against the willingness of the consumer to pay for it.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
17
Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
18
Work center layouts allocate dissimilar machines into cells to work on products that have dissimilar processing requirements.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
19
The essential issue in satisfying customers in the make-to-stock environment is to balance the level of finished inventory against the level of service to the customer.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
20
A project layout is characterized by a high degree of task ordering.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
21
For the purposes of assembly-line balancing, the required workstation cycle time is found by dividing production time per day by the required units of output per day.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
22
In balancing an assembly line, workstation cycle time has to be less than the time between successive units coming off the end of the line.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
23
A process map shows the physical location of the various processes within a supply chain.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
24
Using the assembly-line balancing procedure, which of the following is the required cycle time in minutes per unit if the daily production time is 480 minutes and the required daily output is 50 units?

A) 0.104
B) 50
C) 9.6
D) 480
E) Cannot be determined from the information above
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
25
Little's law states that supply chain processes can be regarded as unrelated and thus treated and analyzed separately.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
26
Workstation cycle time is the time between successive units coming off the end of the assembly line.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
27
Using the assembly-line balancing procedure, which of the following is the required cycle time if the production time in minutes per day is 1,440 and the required output per day in units is 2,000?

A) 0.72
B) 1.388
C) 250
D) 500
E) Cannot be determined from the information above
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
28
The assembly-line balancing procedure determines the precedence relationships of manufacturing tasks.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
29
If the sum of the task times required to produce a product is 45 minutes and the cycle time for the same product is 10 minutes. Thus, the theoretical minimum number of workstations is 5 using the assembly-line balancing procedure.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
30
A high-level map or diagram of a supply chain process can be useful to understand how material flows and where inventory is held.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
31
Little's law can be thought of as a relationship between units and time.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
32
Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 4, 6, 7, 2, 6, and 5 minutes, and the cycle time is 10 minutes?

A) 3
B) 5
C) 6
D) 8
E) None of these
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
33
In designing a production layout a flexible line layout might have the shape of a "U".
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
34
Assembling-to-order means moving the customer order decoupling point from finished goods to components.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
35
The efficiency of an assembly-line is found by a ratio of the sum of all task times divided by the cycle time.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
36
In assembly-line balancing the theoretical minimum number of workstations is found by a ratio of the sum of all task times divided by the cycle time.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
37
If the sum of the task times required to produce a product is 80 minutes and the cycle time for the same product is 15 minutes, the theoretical minimum number of workstations is 8 using the assembly-line balancing procedure.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
38
Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the eight tasks that make up the job are 7, 4, 7, 8, 9, 4, 3, and 6 minutes, and the cycle time is 8 minutes?

A) 3
B) 5
C) 6
D) 8
E) None of these
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
39
The term "assembly line" refers to progressive assembly linked by some material handling device.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
40
The first step in balancing an assembly line is to specify the precedence relationships among tasks to be performed on the line.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
41
You have just determined the actual number of workstations that will be used on an assembly line to be 8 using the assembly-line balancing procedure. The cycle time of the line is 10 minutes and the sum of all that tasks required on the line is 60 minutes. Which of the following is the correct value for the resulting line's efficiency?

A) 0.500
B) 0.650
C) 0.750
D) 0.850
E) None of these
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
42
In studying positioning of inventory in supply chains, which, if any, of the following is most appropriate? (Select all that apply.)

A) As order decoupling point moves towards source, inventory investment goes down.
B) As order decoupling point moves towards the source, customer lead time gets longer.
C) As order decoupling point moves towards the source, inventory investment increases.
D) As order decoupling point moves towards the source, customer lead time is unchanged.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
43
Which of the following is a basic type of process structure?

A) Process flow diagram
B) Product matrix
C) Process matrix
D) Workcenter
E) Manual assembly
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
44
According to Little's Law, which of the following can be used to estimate work-in-process inventory?

A) Process time/Cycle time
B) Throughput rate times Flow time
C) Process velocity/Flow time
D) Set up time/Throughput rate
E) Value added time/Process velocity
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
45
Which of the following is not a step in developing a manufacturing cell layout?

A) Grouping parts into families that follow a common sequence of steps
B) Identifying dominant flow patterns of parts families as a basis for location of processes
C) Physically grouping machines and processes into cells
D) Disposing of left-over machinery and outsourcing ungrouped processes
E) None of the above
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
46
You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure. The cycle time of the line is 5 minutes and the sum of all that tasks required on the line is 25 minutes. Which of the following is the correct value for the resulting line's efficiency?

A) 0.500
B) 0.833
C) 0.973
D) 0.990
E) None of these
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
47
Regarding the measures of inventory managing efficiency, identify the most appropriate answer. (Select all that apply.)

A) Total average value of inventory is equal to the selling price multiplied by finished goods inventory.
B) Inventory turn is the annual cost of goods sold multiplied by average inventory.
C) Days of supply is the inverse of inventory turns × 365.
D) Inventory turn is the annual cost of goods sold divided by average inventory.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
48
Which of the following is not a basic type of process structure?

A) Product-process matrix
B) Workcenter
C) Manufacturing cell
D) Assembly line
E) Continuous process
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
49
A firm will work with a customer to design the product, and then make it from purchased materials, parts, and components. This firm is called:

A) a make to order firm.
B) an engineer to order firm.
C) a make to stock firm.
D) a customer service firm.
E) an assemble to order firm.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
50
Which of these expressions is Little's Law?

A) Inventory/Flow time = Throughput rate:
B) Inventory/Throughput Rate = Flow time
C) Inventory = Throughput rate × Flow time
D) Throughput Rate/Inventory = 1/Flow Time
E) All of the above
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
51
In studying product-process matrix describing layout strategies, which of the following is most appropriate? (Select all that apply.)

A) As you move from project to manufacturing cell to continuous process, product volume increases while standardization increases.
B) As you move from project to manufacturing cell to continuous process, product volume decreases while standardization decreases.
C) As you move from project to manufacturing cell to continuous process, product volume increases while standardization decreases.
D) As you move from project to manufacturing cell to continuous process, product volume decreases while standardization increases.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
52
Which of the following is not considered a major work flow structure?

A) Work Center
B) Project
C) Assembly line
D) Fabrication
E) Continuous Flow
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
53
A difference between project and continuous flow categories of process flow structures is which two of the following?

A) The size and bulk of the product
B) Discrete parts moving from workstation to workstation
C) Degree of equipment specialization
D) Being a "Virtual Factory"
E) Profit per unit
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
54
According to Little's Law, which of the following ratios is used to find throughput rate?

A) Cycle time/Process time
B) Throughput time/Process velocity
C) Process velocity/Throughput time
D) Inventory /Flow time
E) Value added time/Process velocity
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
55
The placement of which of the following is not determined by production process organization decisions?

A) Departments
B) Workgroups
C) Workstations
D) Machines
E) Emergency exits
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
56
Which of the following basic types of process structures is one which similar equipment or functions are grouped together?

A) Project
B) Workcenter
C) Manufacturing cell
D) Assembly line
E) Continuous process
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
57
When balancing an assembly line, which of the following is not a way to reduce the longest task time below the required workstation cycle time?

A) Upgrade the equipment
B) Assign a roaming helper to support the line
C) Split the task between two workstations
D) Speed up the assembly line transfer mechanism
E) Use a more skilled worker
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
58
A firm fills its customer's orders from finished goods inventory. It is a:

A) make to order firm.
B) engineer to order firm.
C) make to stock firm.
D) customer service firm.
E) assemble to order firm.
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
59
Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps by which the product is made?

A) Project
B) Workcenter
C) Manufacturing cell
D) Assembly line
E) Continuous process
Unlock Deck
Unlock for access to all 59 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 59 flashcards in this deck.