Measuring the project's performance against a planned budget and schedule is generally straightforward.
Use Space or
up arrow
down arrow
to flip the card.
Question
The project audit is typically broader than the traditional management audit.
Question
Project evaluation should not be limited to an after-the-fact analysis.
Question
The original criteria for selecting and funding the project are largely irrelevant for project evaluation.
Question
The timing of an audit depends on the purpose of the audit.
Question
Project evaluation appraises the performance of a project relative to the project's initial or revised plan.
Question
Project audits are typically very useful in the initiation project state.
Question
The formal audit is a special type of project evaluation.
Question
Project audits are typically very useful at the master schedule project state.
Question
Later project audits are typically of less value to the project team and of more interest to general management.
Question
The general audit is usually performed by a person or team with special technical skills.
Question
The project audit focuses its attention on the organization's management systems and operations.
Question
The primary purpose of project evaluation is to given feedback to senior management for decision and control purposes.
Question
The request for proposal may contain valuable information for a project audit.
Question
Project evaluation should only appraise the progress and performance of a project relative to the project's initial plan and not relative to a revised plan.
Question
Early project audits usually focus on the project's budget and schedule.
Question
Measuring a project's success on budget, schedule, and performance is typically more complicated than measuring revenues or qualitative, subjective factors.
Question
Project evaluation should be limited to an after-the fact analysis.
Question
The use of forms to collect data during a project audit is generally considered not to be good management practice since they can limit the audit team's flexibility.
Question
According to research, future potential is an important dimension of project success.
Question
Project termination should be treated as a mechanistic process.
Question
It is generally advisable to have the project manager serve as the termination manager.
Question
A general audit is usually constrained by time and cost and limited to a brief investigation of project essentials.
Question
A discussion of the potential for project failure and monetary loss should be included in the audit report.
Question
Which of the following was not a major section listed in the text for the audit report?

A) current status
B) future project status
C) critical management issues
D) financial analysis
E) risk analysis and risk management
Question
Organizational structure should be addressed in the project final report.
Question
The term evaluate means to set the value or appraise.
Question
The way project termination is managed can impact the project's success.
Question
Which of the following is not a typical step in a project audit?

A) familiarize the audit team with the requirements of the project
B) collect benchmark data from other similar projects
C) audit the project on-site
D) write-up the audit report in the required format
E) distribute the report
Question
Poor up-front planning is a fundamental reason for project failure.
Question
The project final report is a history of the project.
Question
Termination-by-integration occurs when an "in-house" project is successfully completed and institutionalized as a new, formal part of the organization.
Question
According to research, which of the following is not an important dimension of project success?

A) project efficiency
B) project team cohesiveness
C) customer impact/satisfaction
D) business/direct success
E) future potential
Question
It is best for the project manager and project team to make the termination decision.
Question
Which of the following audits is typically performed by a person or team with special technical skills?

A) the general audit
B) the detailed audit
C) the aggregate audit
D) the quality audit
E) the technical audit
Question
Which of the following is concerned with appraising a project relative to its initial or revised plan?

A) project evaluation
B) project termination
C) project monitoring
D) project control
E) project planning
Question
Project evaluation is an appraisal for use by top management.
Question
According to the text, which of the following is not an item to consider for project evaluation report recommendations?

A) communication with the client and senior management
B) locating opportunities for technological advances
C) locating opportunities to crash the project
D) improving the project-management process
E) improving the organization's used of projects
Question
Naming the wrong project manager is a fundamental reason for project failure.
Question
A special type of project termination characterized by its unexpected suddenness and initiated by events such as forced retirement of the projects champion or the merger of the firm conducting the project with another firm is referred to as termination by "murder'".
Question
Rathalos Inc., a logistics firm, initiates a project to optimize its transportation infrastructure. After conducting research, the project team concludes that using a fleet of company-owned trucks for any transportation within 100 miles and relying on external firms for any distance beyond that will drastically improve the company's performance. Rathalos Inc. decides to incorporate these findings into its day-to-day operations after the project is closed. In the context of project closures, this scenario exemplifies _____.

A) closure-by-murder
B) closure-by-addition
C) closure-by-integration
D) closure-by-starvation
E) closure-by-elimination
Question
Susan, an auditor, is performing an audit. She is constrained by costs and time to complete the audit on time. Which of the following steps should Susan take in order to complete the audit?

A) Familiarize the audit team with the details of the project's goals and basis for selection
B) Assign a team member with technical skills to look into the project in detail
C) Write the project audit report in a letter to senior management for approval
D) Perform the audit off-site
E) Ensure that procedures and forms for data collection are made after the audit begins
Question
Which of the following is not a main duty of the termination manager?

A) Oversee the closing of the project's books
B) Complete the project final report
C) Ascertain any product support requirements
D) Ensure completion of work
E) Ensure that documentation is complete
Question
Kqirk, a software development firm, decides to perform an audit for an ongoing project. The project aims to create a multimedia animation software for a client. The company hires a team of auditors who have knowledge about the subject of the project and skills that would enable them to evaluate the progress of the project. In this scenario, Kqirk most likely conducts a(n) _____.

A) detailed audit
B) general audit
C) technical audit
D) aggregate audit
E) compound audit
Question
What criteria should be included in evaluating a project?
Question
List several key items to consider for project evaluation report recommendations.
Question
The four important dimensions for measuring project success include the following except…

A) Efficiency in meeting the budget and schedule
B) Customer impact/satisfaction
C) Business/direct success
D) Future potential
E) Planning
Question
Portia is the head of an audit team that is conducting a project audit. Most of the people in her audit team are new and inexperienced. In order to ensure that her team builds trust with the project team during the audit, Portia should tell her team members to:

A) accept unconfirmed and unverified sources of information.
B) refrain from informing project personnel about the operations involved in an audit process.
C) offer their personal opinions on the data gathered.
D) avoid misunderstandings with the project team members.
E) avoid guidelines that seem too time consuming.
Question
Which of the following is typically not included in the project final report?

A) administrative performance
B) project performance
C) organizational structure
D) project teamwork
E) risk analysis and risk management
Question
Which of the following is most closely associated with the output of a project becoming a standard part of the operating systems of the sponsoring firm or client?

A) termination-by-addition
B) termination-by-extinction
C) termination-by-integration
D) termination-by-starvation
E) termination-by-elimination
Question
Which of the following information should not be contained in an audit report?

A) Introduction
B) final comments
C) Risk analysis
D) future project status
E) Project RACI matrix
Question
Four fundamental reasons for project failure include all of the following except;

A) Project was not required for this task in the first place
B) Insufficient support form senior management
C) Insufficient funds
D) Poor up-front funding
E) Naming the wrong project manager
Question
Arquebus, a construction company, undertook a project to build an apartment building two years ago. However, the building's construction had to be halted due to legal issues surrounding the land it was built on. After a lengthy legal battle, Arquebus had to discontinue the project. In the context of project closure, this scenario exemplifies _____.

A) closure-by-murder
B) closure-by-addition
C) closure-by-integration
D) closure-by-starvation
E) closure-by-elimination
Question
Redemption Inc., an event management firm, wants to establish a social media marketing department. The management assigns one of the company's best managers to form a team of six employees and undertake a project to increase Redemption's presence on social media. The project is closed after it is successfully completed. Redemption Inc. forms a new social media marketing department with the project team members. In the context of project closure, this scenario exemplifies _____.

A) closure-by-murder
B) closure-by-addition
C) closure-by-integration
D) closure-by-starvation
E) closure-by-elimination
Question
Phillip, an auditor, is conducting a project audit for a company. To be effective, he needs to gather information regarding the project. He can accomplish this by:

A) looking at documents that predate the project.
B) asking for personal accounts from project sponsors in the organization.
C) working with information from previous projects of the same project team.
D) looking at the organization's goals and project history.
E) asking the CEO of the organization for details about the project.
Question
Albert, a project manager, completed a complex project. He then prepared a project final report for the purview of senior management. In a specific section of the report, he listed the management practices that worked well for the project and helped team members complete the project without any delay. Which of the following items did Albert address in this section?

A) Client performance
B) Financial feasibility
C) Administrative performance
D) Project forecasting
E) Closure of facilities
Question
Matthew, an auditor, is going to start a project audit. He has already acquired information about the project from the accounting department. Which of the following steps should he take to expedite gathering data about the project?

A) He should accept unconfirmed and unverified information from discreet sources.
B) He should streamline the project development process.
C) He should develop forms and procedures for data collection.
D) He should ensure the legality of the audit.
E) He should compile the currently available data separately.
Question
Briefly describe and contrast general audits, detailed audits, and technical audits.
Question
Resocore, an event management company, decides to perform an audit for an ongoing project. The company is constrained by time and cost, and therefore limits the audit to a brief investigation of project essentials. In this scenario, Resocore most likely conducts a(n) _____.

A) detailed audit
B) general audit
C) technical audit
D) energy audit
E) compound audit
Question
Which of the following is not a type of project termination mentioned in the text?

A) project extinction
B) termination-by-addition
C) termination-by-integration
D) termination-by-starvation
E) termination-by-elimination
Question
What are the steps in a project audit?
Question
Describe what type of information would be in the risk analysis and risk management section of the audit report?
Question
Explain when projects should be closed.
Question
Describe what type of information would be in the future project status section of the audit report?
Question
What is the difference between financial audits and project audits?
Question
Briefly describe the three types of project closure.
Question
What are the main duties of the termination manager?
Question
Contrast closure-by-addition with closure-by-integration.
Question
What issues should be addressed in the project final report?
Question
Describe what type of information would be in the critical management issues section of the audit report?
Question
What content should be included in the audit report?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/71
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 8: Evaluating and Terminating the Project
1
Measuring the project's performance against a planned budget and schedule is generally straightforward.
True
2
The project audit is typically broader than the traditional management audit.
True
3
Project evaluation should not be limited to an after-the-fact analysis.
True
4
The original criteria for selecting and funding the project are largely irrelevant for project evaluation.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
5
The timing of an audit depends on the purpose of the audit.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
6
Project evaluation appraises the performance of a project relative to the project's initial or revised plan.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
7
Project audits are typically very useful in the initiation project state.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
8
The formal audit is a special type of project evaluation.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
9
Project audits are typically very useful at the master schedule project state.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
10
Later project audits are typically of less value to the project team and of more interest to general management.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
11
The general audit is usually performed by a person or team with special technical skills.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
12
The project audit focuses its attention on the organization's management systems and operations.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
13
The primary purpose of project evaluation is to given feedback to senior management for decision and control purposes.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
14
The request for proposal may contain valuable information for a project audit.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
15
Project evaluation should only appraise the progress and performance of a project relative to the project's initial plan and not relative to a revised plan.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
16
Early project audits usually focus on the project's budget and schedule.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
17
Measuring a project's success on budget, schedule, and performance is typically more complicated than measuring revenues or qualitative, subjective factors.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
18
Project evaluation should be limited to an after-the fact analysis.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
19
The use of forms to collect data during a project audit is generally considered not to be good management practice since they can limit the audit team's flexibility.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
20
According to research, future potential is an important dimension of project success.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
21
Project termination should be treated as a mechanistic process.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
22
It is generally advisable to have the project manager serve as the termination manager.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
23
A general audit is usually constrained by time and cost and limited to a brief investigation of project essentials.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
24
A discussion of the potential for project failure and monetary loss should be included in the audit report.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following was not a major section listed in the text for the audit report?

A) current status
B) future project status
C) critical management issues
D) financial analysis
E) risk analysis and risk management
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
26
Organizational structure should be addressed in the project final report.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
27
The term evaluate means to set the value or appraise.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
28
The way project termination is managed can impact the project's success.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the following is not a typical step in a project audit?

A) familiarize the audit team with the requirements of the project
B) collect benchmark data from other similar projects
C) audit the project on-site
D) write-up the audit report in the required format
E) distribute the report
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
30
Poor up-front planning is a fundamental reason for project failure.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
31
The project final report is a history of the project.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
32
Termination-by-integration occurs when an "in-house" project is successfully completed and institutionalized as a new, formal part of the organization.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
33
According to research, which of the following is not an important dimension of project success?

A) project efficiency
B) project team cohesiveness
C) customer impact/satisfaction
D) business/direct success
E) future potential
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
34
It is best for the project manager and project team to make the termination decision.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
35
Which of the following audits is typically performed by a person or team with special technical skills?

A) the general audit
B) the detailed audit
C) the aggregate audit
D) the quality audit
E) the technical audit
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
36
Which of the following is concerned with appraising a project relative to its initial or revised plan?

A) project evaluation
B) project termination
C) project monitoring
D) project control
E) project planning
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
37
Project evaluation is an appraisal for use by top management.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
38
According to the text, which of the following is not an item to consider for project evaluation report recommendations?

A) communication with the client and senior management
B) locating opportunities for technological advances
C) locating opportunities to crash the project
D) improving the project-management process
E) improving the organization's used of projects
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
39
Naming the wrong project manager is a fundamental reason for project failure.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
40
A special type of project termination characterized by its unexpected suddenness and initiated by events such as forced retirement of the projects champion or the merger of the firm conducting the project with another firm is referred to as termination by "murder'".
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
41
Rathalos Inc., a logistics firm, initiates a project to optimize its transportation infrastructure. After conducting research, the project team concludes that using a fleet of company-owned trucks for any transportation within 100 miles and relying on external firms for any distance beyond that will drastically improve the company's performance. Rathalos Inc. decides to incorporate these findings into its day-to-day operations after the project is closed. In the context of project closures, this scenario exemplifies _____.

A) closure-by-murder
B) closure-by-addition
C) closure-by-integration
D) closure-by-starvation
E) closure-by-elimination
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
42
Susan, an auditor, is performing an audit. She is constrained by costs and time to complete the audit on time. Which of the following steps should Susan take in order to complete the audit?

A) Familiarize the audit team with the details of the project's goals and basis for selection
B) Assign a team member with technical skills to look into the project in detail
C) Write the project audit report in a letter to senior management for approval
D) Perform the audit off-site
E) Ensure that procedures and forms for data collection are made after the audit begins
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
43
Which of the following is not a main duty of the termination manager?

A) Oversee the closing of the project's books
B) Complete the project final report
C) Ascertain any product support requirements
D) Ensure completion of work
E) Ensure that documentation is complete
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
44
Kqirk, a software development firm, decides to perform an audit for an ongoing project. The project aims to create a multimedia animation software for a client. The company hires a team of auditors who have knowledge about the subject of the project and skills that would enable them to evaluate the progress of the project. In this scenario, Kqirk most likely conducts a(n) _____.

A) detailed audit
B) general audit
C) technical audit
D) aggregate audit
E) compound audit
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
45
What criteria should be included in evaluating a project?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
46
List several key items to consider for project evaluation report recommendations.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
47
The four important dimensions for measuring project success include the following except…

A) Efficiency in meeting the budget and schedule
B) Customer impact/satisfaction
C) Business/direct success
D) Future potential
E) Planning
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
48
Portia is the head of an audit team that is conducting a project audit. Most of the people in her audit team are new and inexperienced. In order to ensure that her team builds trust with the project team during the audit, Portia should tell her team members to:

A) accept unconfirmed and unverified sources of information.
B) refrain from informing project personnel about the operations involved in an audit process.
C) offer their personal opinions on the data gathered.
D) avoid misunderstandings with the project team members.
E) avoid guidelines that seem too time consuming.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
49
Which of the following is typically not included in the project final report?

A) administrative performance
B) project performance
C) organizational structure
D) project teamwork
E) risk analysis and risk management
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
50
Which of the following is most closely associated with the output of a project becoming a standard part of the operating systems of the sponsoring firm or client?

A) termination-by-addition
B) termination-by-extinction
C) termination-by-integration
D) termination-by-starvation
E) termination-by-elimination
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
51
Which of the following information should not be contained in an audit report?

A) Introduction
B) final comments
C) Risk analysis
D) future project status
E) Project RACI matrix
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
52
Four fundamental reasons for project failure include all of the following except;

A) Project was not required for this task in the first place
B) Insufficient support form senior management
C) Insufficient funds
D) Poor up-front funding
E) Naming the wrong project manager
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
53
Arquebus, a construction company, undertook a project to build an apartment building two years ago. However, the building's construction had to be halted due to legal issues surrounding the land it was built on. After a lengthy legal battle, Arquebus had to discontinue the project. In the context of project closure, this scenario exemplifies _____.

A) closure-by-murder
B) closure-by-addition
C) closure-by-integration
D) closure-by-starvation
E) closure-by-elimination
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
54
Redemption Inc., an event management firm, wants to establish a social media marketing department. The management assigns one of the company's best managers to form a team of six employees and undertake a project to increase Redemption's presence on social media. The project is closed after it is successfully completed. Redemption Inc. forms a new social media marketing department with the project team members. In the context of project closure, this scenario exemplifies _____.

A) closure-by-murder
B) closure-by-addition
C) closure-by-integration
D) closure-by-starvation
E) closure-by-elimination
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
55
Phillip, an auditor, is conducting a project audit for a company. To be effective, he needs to gather information regarding the project. He can accomplish this by:

A) looking at documents that predate the project.
B) asking for personal accounts from project sponsors in the organization.
C) working with information from previous projects of the same project team.
D) looking at the organization's goals and project history.
E) asking the CEO of the organization for details about the project.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
56
Albert, a project manager, completed a complex project. He then prepared a project final report for the purview of senior management. In a specific section of the report, he listed the management practices that worked well for the project and helped team members complete the project without any delay. Which of the following items did Albert address in this section?

A) Client performance
B) Financial feasibility
C) Administrative performance
D) Project forecasting
E) Closure of facilities
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
57
Matthew, an auditor, is going to start a project audit. He has already acquired information about the project from the accounting department. Which of the following steps should he take to expedite gathering data about the project?

A) He should accept unconfirmed and unverified information from discreet sources.
B) He should streamline the project development process.
C) He should develop forms and procedures for data collection.
D) He should ensure the legality of the audit.
E) He should compile the currently available data separately.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
58
Briefly describe and contrast general audits, detailed audits, and technical audits.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
59
Resocore, an event management company, decides to perform an audit for an ongoing project. The company is constrained by time and cost, and therefore limits the audit to a brief investigation of project essentials. In this scenario, Resocore most likely conducts a(n) _____.

A) detailed audit
B) general audit
C) technical audit
D) energy audit
E) compound audit
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following is not a type of project termination mentioned in the text?

A) project extinction
B) termination-by-addition
C) termination-by-integration
D) termination-by-starvation
E) termination-by-elimination
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
61
What are the steps in a project audit?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
62
Describe what type of information would be in the risk analysis and risk management section of the audit report?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
63
Explain when projects should be closed.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
64
Describe what type of information would be in the future project status section of the audit report?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
65
What is the difference between financial audits and project audits?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
66
Briefly describe the three types of project closure.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
67
What are the main duties of the termination manager?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
68
Contrast closure-by-addition with closure-by-integration.
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
69
What issues should be addressed in the project final report?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
70
Describe what type of information would be in the critical management issues section of the audit report?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
71
What content should be included in the audit report?
Unlock Deck
Unlock for access to all 71 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 71 flashcards in this deck.