Deck 2: Production Planning System
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/31
Play
Full screen (f)
Deck 2: Production Planning System
1
Which basic production planning strategy avoids hiring and layoff costs and the costs of excess capacity?
A) demand matching
B) operation smoothing
C) subcontracting
D) all the above
E) none of the above
A) demand matching
B) operation smoothing
C) subcontracting
D) all the above
E) none of the above
C
2
Which of the following are characteristics of an MRPII system?
I) It incorporates the plans of marketing, production and finance.
II) It is a fully integrated planning and control system.
III) It has feedback from the bottom up.
A) I only
B) II only
C) III only
D) I, II and III
I) It incorporates the plans of marketing, production and finance.
II) It is a fully integrated planning and control system.
III) It has feedback from the bottom up.
A) I only
B) II only
C) III only
D) I, II and III
D
3
A production planning strategy which turns away extra demand is called:
A) production leveling
B) demand matching
C) hybrid strategy
D) all of the above
E) none of the above
A) production leveling
B) demand matching
C) hybrid strategy
D) all of the above
E) none of the above
E
4
Which of the following statements is best about sales and operations planning?
A) it provides an means of updating the material requirements plan
B) it includes only the marketing and production plans
C) it is usually updated on a monthly basis
D) it has no effect on inventory levels
A) it provides an means of updating the material requirements plan
B) it includes only the marketing and production plans
C) it is usually updated on a monthly basis
D) it has no effect on inventory levels
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
5
Which of the following plans has the longest planning horizon and the least level of detail?
A) strategic business plan
B) production plan
C) master production schedule
D) all of the above have the same level of detail
E) none of the above
A) strategic business plan
B) production plan
C) master production schedule
D) all of the above have the same level of detail
E) none of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
6
The ability of manufacturing to produce goods and services is called:
A) scheduling
B) production planning
C) capacity
D) routing
E) none of the above
A) scheduling
B) production planning
C) capacity
D) routing
E) none of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following is a characteristic of a production plan?
A) time horizons are five years
B) the production plan is for individual items
C) the only objective is to have an efficient plant
D) all of the above are characteristics of a production plan
E) none of the above is characteristic of a production plan
A) time horizons are five years
B) the production plan is for individual items
C) the only objective is to have an efficient plant
D) all of the above are characteristics of a production plan
E) none of the above is characteristic of a production plan
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
8
Over a 10-week period the cumulative sales are forecast at 10,000 units, the opening inventory is
200 units and the closing inventory is to be 100 units. What should be the weekly planned production for level production?
A) 990
B) 1000
C) 1010
D) 1030
E) none of the above
200 units and the closing inventory is to be 100 units. What should be the weekly planned production for level production?
A) 990
B) 1000
C) 1010
D) 1030
E) none of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
9
Over the time span of the production plan, which of the following can usually be varied to change capacity?
A) work force
B) inventories
C) plant and equipment
D) all of the above
E) a and b above
A) work force
B) inventories
C) plant and equipment
D) all of the above
E) a and b above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
10
Which basic production planning strategy will build inventory and avoid the costs of excess capacity?
A) demand matching (chase)
B) production leveling
C) subcontracting
D) all the above
E) none of the above
A) demand matching (chase)
B) production leveling
C) subcontracting
D) all the above
E) none of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
11
Priority in production planning relates to:
A) routing
B) how much of what is needed and when
C) capacity
D) an objective of the firm
E) none of the above
A) routing
B) how much of what is needed and when
C) capacity
D) an objective of the firm
E) none of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
12
For the purposes of production planning, product groups should be established on the basis of:
A) market segments
B) similarity of manufacturing process
C) the availability of materials
D) the availability of machinery
E) all of the above
A) market segments
B) similarity of manufacturing process
C) the availability of materials
D) the availability of machinery
E) all of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following statements is most appropriate regarding production planning?
A) a high level of detail is not needed
B) a translation must be made from product demand to capacity demand
C) product groups based on similarity of manufacturing process should be used in planning
D) all of the above are true
E) none of the above is true
A) a high level of detail is not needed
B) a translation must be made from product demand to capacity demand
C) product groups based on similarity of manufacturing process should be used in planning
D) all of the above are true
E) none of the above is true
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
14
Determining the need for labor, machines, physical resources to meet the production objectives of the firm is called:
A) production control
B) production planning
C) capacity planning
D) all of the above
E) none of the above
A) production control
B) production planning
C) capacity planning
D) all of the above
E) none of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
15
The function of setting the limits or levels of manufacturing operations based on the market plan and resource availability is called:
A) production planning
B) production activity level
C) capacity planning
D) all of the above
E) none of the above
A) production planning
B) production activity level
C) capacity planning
D) all of the above
E) none of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
16
In terms of INCREASING level of detail, which is the best sequence of activities?
I) Material requirements planning.
II) Master production scheduling.
III) Production planning.
A) I, II and III
B) I, III, and II
C) II, III, and I
D) II, I, and III
E) III, II, and I
I) Material requirements planning.
II) Master production scheduling.
III) Production planning.
A) I, II and III
B) I, III, and II
C) II, III, and I
D) II, I, and III
E) III, II, and I
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
17
Which of the following is an input to the production plan?
A) strategic business plan
B) financial plan
C) market plan
D) engineering plan
E) all of the above are inputs
A) strategic business plan
B) financial plan
C) market plan
D) engineering plan
E) all of the above are inputs
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
18
If the opening inventory is 100 units, the sales are 500 units and the ending inventory is 200 units, then manufacturing must produce:
A) 300 units
B) 400 units
C) 500 units
D) 600 units
E) none of the above
A) 300 units
B) 400 units
C) 500 units
D) 600 units
E) none of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
19
A statement of a schedule of requirements for individual end items is called:
A) a master production schedule
B) a material requirements plan
C) a production plan
D) a capacity plan
E) none of the above
A) a master production schedule
B) a material requirements plan
C) a production plan
D) a capacity plan
E) none of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
20
Which of the following is a basic strategy in developing a production plan?
A) hybrid strategy
B) production leveling
C) chase strategy
D) a and b above
E) b and c above
A) hybrid strategy
B) production leveling
C) chase strategy
D) a and b above
E) b and c above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
21
If the old backlog was 200 units, the forecast for the next period is 500 units, and production for the next period is 600 units, what will be the backlog at the end of the next period?
A) 100 units
B) 200 units
C) 300 units
D) 700 units
E) 800 units
A) 100 units
B) 200 units
C) 300 units
D) 700 units
E) 800 units
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following information is needed to develop a make-to-stock production plan?
I) Forecast by time period for the production plan.
II) Opening inventory.
III) Opening backlog of customer orders.
IV) Desired ending inventory.
A) I, II and III
B) I, II and IV
C) 1, III and IV
D) II, III and IV
E) none of the above
I) Forecast by time period for the production plan.
II) Opening inventory.
III) Opening backlog of customer orders.
IV) Desired ending inventory.
A) I, II and III
B) I, II and IV
C) 1, III and IV
D) II, III and IV
E) none of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
23
Which of the following represents the major reason for developing the production plan as part of
Sales and Operations Planning?
A) To decide how to best produce exactly what is in the sales plan
B) To plan for resources required to produce to the agreed plan
C) To plan a schedule for the production of individual products
D) To plan the acquisition of new manufacturing facilities
Sales and Operations Planning?
A) To decide how to best produce exactly what is in the sales plan
B) To plan for resources required to produce to the agreed plan
C) To plan a schedule for the production of individual products
D) To plan the acquisition of new manufacturing facilities
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
24
When a company establishes a program to recycle or reuse products discarded or returned from customers it is typically called which of the following?
A) Product return contract
B) Reverse supply chain
C) Customer servicing
D) Resupply planning
A) Product return contract
B) Reverse supply chain
C) Customer servicing
D) Resupply planning
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
25
Firms will generally make-to-stock when:
A) demand is unpredictable
B) there are many product options
C) delivery lead times are long
D) all of the above
E) none of the above
A) demand is unpredictable
B) there are many product options
C) delivery lead times are long
D) all of the above
E) none of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following is NOT a rule of Sales and Operations Planning?
A) Product Groups need not be decided
B) Planning units of measure need to be decided
C) A planning horizon must include new product development time
D) Performance review periods to be compared should be decided
A) Product Groups need not be decided
B) Planning units of measure need to be decided
C) A planning horizon must include new product development time
D) Performance review periods to be compared should be decided
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
27
Which of the following is true?
I The strategic plan is stated in product terms
II The strategic business plan is stated in financial terms
III The strategic business plan is developed from the strategic plan
A) I and II only
B) I and III only
C) II and III only
D) I, II, and III
E) None are correct
I The strategic plan is stated in product terms
II The strategic business plan is stated in financial terms
III The strategic business plan is developed from the strategic plan
A) I and II only
B) I and III only
C) II and III only
D) I, II, and III
E) None are correct
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
28
Firms will generally make-to-order when:
A) products are produced to customer specifications
B) there are many product options
C) product is expensive to make and store
D) all of the above
E) none of the above
A) products are produced to customer specifications
B) there are many product options
C) product is expensive to make and store
D) all of the above
E) none of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the following is a complete closed loop planning system that develops plans for all materials and operations?
A) Capacity requirements planning
B) Enterprise resource planning
C) Supply chain management
D) Material requirements planning
A) Capacity requirements planning
B) Enterprise resource planning
C) Supply chain management
D) Material requirements planning
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
30
Which of the following is most true about Sales and Operations Planning
A) It usually is produced only once a year
B) It usually includes only sales and manufacturing people
C) It is typically done in financial terms
D) It usually includes all functions at the executive level
A) It usually is produced only once a year
B) It usually includes only sales and manufacturing people
C) It is typically done in financial terms
D) It usually includes all functions at the executive level
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following is concerned with long-term planning of manufacturing activity?
A) Sales and operations planning
B) Master production scheduling
C) MRP
D) Production activity control
E) Master planning
A) Sales and operations planning
B) Master production scheduling
C) MRP
D) Production activity control
E) Master planning
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck