Deck 18: Material Requirements Planning

Full screen (f)
exit full mode
Question
A modular bill of materials includes items with fractional options.
Use Space or
up arrow
down arrow
to flip the card.
Question
An input to the material requirements planning (MRP) system is an exception report.
Question
Manufacturing firms maintain bill of materials (BOM) files, which are simply a sequencing of everything that goes into a final product.
Question
A BOM file is often called a product structure file or product tree because it shows how a product is put together.
Question
An output of MRP is a bill of materials (BOM) file.
Question
An input to the material requirements planning (MRP) system is an inventory records file.
Question
MRP is based on dependent demand.
Question
MRP stands for Material Requirements Planning.
Question
MRP is most valuable in industries where a number of products are made in batches using the same productive equipment.
Question
The master production schedule states the number of items to be produced during specific time periods.
Question
MRP is a logical, easily understandable approach to the problem of determining the number of parts, components, and materials needed to produce each end item.
Question
A modular bill of materials is the term for an item that can be produced and stocked as a subassembly.
Question
A master production schedule is an input to a material requirements planning (MRP) system.
Question
Computing the quantity of each component that goes into a finished product can be done by expanding (or exploding) each item in a product structure file and summing at all levels.
Question
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to become more "lumpy."
Question
MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.
Question
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to smooth out and become even over time.
Question
The MRP program performs its analysis from the bottom up of the product structure trees, imploding requirements level by level.
Question
MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.
Question
MRP stands for Manufacturing Requirements Planning.
Question
Net change MRP systems are "activity" driven.
Question
In a net change MRP system requirements and schedules are considered rigid and never updated.
Question
In a net change MRP system requirements and schedules are updated whenever a transaction is processed that has an impact on the item.
Question
The least total cost method (LTC) lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal.
Question
The least unit cost method (LUC) lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal.
Question
Generally, determining lot sizes in MRP systems is simple.
Question
The least unit cost method of lot-sizing technique adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
Question
Since MRP systems focus on batch or lot-sized orders and JIT is focused on individual item production, the two systems are incompatible and cannot work together.
Question
Low level coding in MRP indicates the exact status of each item managed by the system in "real time."
Question
Lot-for-lot (L4L) is the most common lot sizing technique.
Question
The economic order quantity (EOQ) lot sizing technique uses the "square root formula" to balance set-up cost and carrying cost.
Question
The lot-for-lot (L4L) lot sizing technique minimizes carryin g cost by taking into account setup costs and capacity limitations.
Question
A lot-for-lot (L4L) lot sizing technique does not take into account setup costs or capacity limitations.
Question
In a net change MRP program, a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.
Question
The least unit cost method of lot-sizing adds ordering, stock-out and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
Question
"Projected available balance" is a term referring to unsold finished goods inventory.
Question
The economic order quantity (EOQ) lot sizing technique uses the "square root formula" to balance set-up cost, carrying cost and cost of stock-outs.
Question
The economic order quantity (EOQ) lot sizing technique produces or acquires exactly the amount of product that is needed each time period with none carried over into future periods.
Question
Projected available balance is the amount of inventory that is expected as of the beginning of a period.
Question
Net change MRP reflects the exact status of each item managed by the system in "real time."
Question
One of the main purposes of a MRP system is which of the following?

A)Track inventory levels.
B)Create productive capacity.
C)Decrease layers of management.
D)Develop schedules specifying when each component should be ordered or produced.
E)Upgrade manufacturing's professionalism.
Question
When implemented correctly, MRP links all areas of the business.
Question
Materials Requirements Planning (MRP) evolved from Enterprise Resource Planning (ERP).
Question
The time-phased plan specifying how many and when the firm plans to build each end item is called the
Materials Requirements Plan (MRP.)
Question
MRP systems seek to achieve which of the following?

A)Minimize lot sizes
B)Determine the number of dependent demand items needed
C)Relieve capacity bottlenecks
D)Provide a yardstick for future improvements
E)Improve on JIT methods
Question
Which of the following is an input to the master production schedule?

A)Prototype products from product development
B)Aggregate component schedule
C)Peg reports
D)Exception reports
E)Forecasts of random demand from customers
Question
A BOM file is also called which of the following?

A)Product structure tree
B)Stocking plan
C)Inventory usage record
D)Production parts plan
E)Time bucket schedule
Question
Which of the following is one of the main purposes of a MRP system?

A)Educate personnel in basic work rules.
B)To determine the amount of materials needed to produce each end item.
C)Stimulate the work force.
D)Decrease labor requirements.
E)Increase inventory accuracy.
Question
The customer grace period is a time-span having some specified level of opportunity for the customer to make changes.
Question
Enterprise Resource Planning (ERP) evolved from Materials Requirements Planning (MRP).
Question
Time fences are periods of time having some specified level of opportunity for the customer to make changes.
Question
The three main inputs to an MRP system are the bill of materials, the master schedule and the inventory records file.
Question
Which of the following industry types will not benefit greatly from the application of MRP?

A)Fabricate-to-order
B)Assemble-to-stock
C)Assemble-to-order
D)Manufacture-to-order
E)None of the above
Question
Which of the following industry types has high expected benefits from the application of MRP?

A)Fabricate-to-stock
B)Fabricate-to-order
C)Assemble-to-stock
D)Continuous process
E)Service and repair parts
Question
Which of the following is an input to the master production schedule (MPS)?

A)Inventory records file
B)The aggregate plan
C)The bill of materials
D)The exception report
E)Planned order schedules
Question
Which of the following is an input to the master production schedule?

A)Bill of materials (BOM) file
B)Inventory records file
C)Exception reports
D)Planned-order schedules
E)None of the above
Question
Which of the following is most closely related to the reason a firm might implement MRP?

A)So they can order the right parts
B)So they can order parts sufficient for immediate use
C)So they can insure that parts to arrive prior to when they are needed
D)To assure appropriate quality levels
E)To keep process costs between the LCL and the UCL
Question
The time-phased plan specifying how many and when the firm plans to build each end item is called the master production schedule (MPS).
Question
Which of the following industry types has high expected benefits from the application of MRP?

A)Fabricate-to-order
B)Hospitals
C)Assemble-to-order
D)Aircraft manufacturers
E)Oil refineries
Question
A product structure tree can do which of the following?

A)Help to compute component usage
B)Reduce product scrap
C)Reduce labor overtime
D)Reduce regular time labor
E)Locate raw material supplies
Question
Which of the following is an input file necessary to run an MRP system?

A)Exception report
B)Computer-aided-design files
C)Inventory records file
D)Personnel files
E)Planned order schedule
Question
Which of the following files allows us to retrace a material requirement upward in the product structure through each level, identifying each parent item that created the demand?

A)Planning bill of materials file
B)Modular bill of materials file
C)Super bill of materials file
D)Exception report file
E)Peg record file
Question
We would expect to see which of the following in an MRP system's inventory status file?

A)End items produced
B)Late/early delivery records
C)Scrap parts
D)Labor efficiency
E)Computer errors
Question
Which of the following is not a production activity report generated by MRP?

A)Exception report
B)Planning report
C)Performance control report
D)Planned-order schedules
E)Bill of materials report
Question
Which of the following is an input file necessary to run an MRP system?

A)Bill of materials (BOM) file
B)Quality management report
C)Exception reports
D)Planned-order schedules
E)Purchasing contracts
Question
In an MRP program, the program accesses the status segment of an inventory record according to specific periods called which of the following?

A)Cubed time units
B)Time buckets
C)BOM units
D)Time modules
E)Time lines
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/66
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 18: Material Requirements Planning
1
A modular bill of materials includes items with fractional options.
False
2
An input to the material requirements planning (MRP) system is an exception report.
False
3
Manufacturing firms maintain bill of materials (BOM) files, which are simply a sequencing of everything that goes into a final product.
True
4
A BOM file is often called a product structure file or product tree because it shows how a product is put together.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
5
An output of MRP is a bill of materials (BOM) file.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
6
An input to the material requirements planning (MRP) system is an inventory records file.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
7
MRP is based on dependent demand.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
8
MRP stands for Material Requirements Planning.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
9
MRP is most valuable in industries where a number of products are made in batches using the same productive equipment.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
10
The master production schedule states the number of items to be produced during specific time periods.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
11
MRP is a logical, easily understandable approach to the problem of determining the number of parts, components, and materials needed to produce each end item.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
12
A modular bill of materials is the term for an item that can be produced and stocked as a subassembly.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
13
A master production schedule is an input to a material requirements planning (MRP) system.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
14
Computing the quantity of each component that goes into a finished product can be done by expanding (or exploding) each item in a product structure file and summing at all levels.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
15
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to become more "lumpy."
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
16
MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
17
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to smooth out and become even over time.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
18
The MRP program performs its analysis from the bottom up of the product structure trees, imploding requirements level by level.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
19
MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
20
MRP stands for Manufacturing Requirements Planning.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
21
Net change MRP systems are "activity" driven.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
22
In a net change MRP system requirements and schedules are considered rigid and never updated.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
23
In a net change MRP system requirements and schedules are updated whenever a transaction is processed that has an impact on the item.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
24
The least total cost method (LTC) lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
25
The least unit cost method (LUC) lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
26
Generally, determining lot sizes in MRP systems is simple.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
27
The least unit cost method of lot-sizing technique adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
28
Since MRP systems focus on batch or lot-sized orders and JIT is focused on individual item production, the two systems are incompatible and cannot work together.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
29
Low level coding in MRP indicates the exact status of each item managed by the system in "real time."
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
30
Lot-for-lot (L4L) is the most common lot sizing technique.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
31
The economic order quantity (EOQ) lot sizing technique uses the "square root formula" to balance set-up cost and carrying cost.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
32
The lot-for-lot (L4L) lot sizing technique minimizes carryin g cost by taking into account setup costs and capacity limitations.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
33
A lot-for-lot (L4L) lot sizing technique does not take into account setup costs or capacity limitations.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
34
In a net change MRP program, a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
35
The least unit cost method of lot-sizing adds ordering, stock-out and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
36
"Projected available balance" is a term referring to unsold finished goods inventory.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
37
The economic order quantity (EOQ) lot sizing technique uses the "square root formula" to balance set-up cost, carrying cost and cost of stock-outs.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
38
The economic order quantity (EOQ) lot sizing technique produces or acquires exactly the amount of product that is needed each time period with none carried over into future periods.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
39
Projected available balance is the amount of inventory that is expected as of the beginning of a period.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
40
Net change MRP reflects the exact status of each item managed by the system in "real time."
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
41
One of the main purposes of a MRP system is which of the following?

A)Track inventory levels.
B)Create productive capacity.
C)Decrease layers of management.
D)Develop schedules specifying when each component should be ordered or produced.
E)Upgrade manufacturing's professionalism.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
42
When implemented correctly, MRP links all areas of the business.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
43
Materials Requirements Planning (MRP) evolved from Enterprise Resource Planning (ERP).
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
44
The time-phased plan specifying how many and when the firm plans to build each end item is called the
Materials Requirements Plan (MRP.)
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
45
MRP systems seek to achieve which of the following?

A)Minimize lot sizes
B)Determine the number of dependent demand items needed
C)Relieve capacity bottlenecks
D)Provide a yardstick for future improvements
E)Improve on JIT methods
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
46
Which of the following is an input to the master production schedule?

A)Prototype products from product development
B)Aggregate component schedule
C)Peg reports
D)Exception reports
E)Forecasts of random demand from customers
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
47
A BOM file is also called which of the following?

A)Product structure tree
B)Stocking plan
C)Inventory usage record
D)Production parts plan
E)Time bucket schedule
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
48
Which of the following is one of the main purposes of a MRP system?

A)Educate personnel in basic work rules.
B)To determine the amount of materials needed to produce each end item.
C)Stimulate the work force.
D)Decrease labor requirements.
E)Increase inventory accuracy.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
49
The customer grace period is a time-span having some specified level of opportunity for the customer to make changes.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
50
Enterprise Resource Planning (ERP) evolved from Materials Requirements Planning (MRP).
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
51
Time fences are periods of time having some specified level of opportunity for the customer to make changes.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
52
The three main inputs to an MRP system are the bill of materials, the master schedule and the inventory records file.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
53
Which of the following industry types will not benefit greatly from the application of MRP?

A)Fabricate-to-order
B)Assemble-to-stock
C)Assemble-to-order
D)Manufacture-to-order
E)None of the above
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
54
Which of the following industry types has high expected benefits from the application of MRP?

A)Fabricate-to-stock
B)Fabricate-to-order
C)Assemble-to-stock
D)Continuous process
E)Service and repair parts
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
55
Which of the following is an input to the master production schedule (MPS)?

A)Inventory records file
B)The aggregate plan
C)The bill of materials
D)The exception report
E)Planned order schedules
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
56
Which of the following is an input to the master production schedule?

A)Bill of materials (BOM) file
B)Inventory records file
C)Exception reports
D)Planned-order schedules
E)None of the above
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
57
Which of the following is most closely related to the reason a firm might implement MRP?

A)So they can order the right parts
B)So they can order parts sufficient for immediate use
C)So they can insure that parts to arrive prior to when they are needed
D)To assure appropriate quality levels
E)To keep process costs between the LCL and the UCL
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
58
The time-phased plan specifying how many and when the firm plans to build each end item is called the master production schedule (MPS).
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
59
Which of the following industry types has high expected benefits from the application of MRP?

A)Fabricate-to-order
B)Hospitals
C)Assemble-to-order
D)Aircraft manufacturers
E)Oil refineries
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
60
A product structure tree can do which of the following?

A)Help to compute component usage
B)Reduce product scrap
C)Reduce labor overtime
D)Reduce regular time labor
E)Locate raw material supplies
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
61
Which of the following is an input file necessary to run an MRP system?

A)Exception report
B)Computer-aided-design files
C)Inventory records file
D)Personnel files
E)Planned order schedule
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
62
Which of the following files allows us to retrace a material requirement upward in the product structure through each level, identifying each parent item that created the demand?

A)Planning bill of materials file
B)Modular bill of materials file
C)Super bill of materials file
D)Exception report file
E)Peg record file
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
63
We would expect to see which of the following in an MRP system's inventory status file?

A)End items produced
B)Late/early delivery records
C)Scrap parts
D)Labor efficiency
E)Computer errors
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
64
Which of the following is not a production activity report generated by MRP?

A)Exception report
B)Planning report
C)Performance control report
D)Planned-order schedules
E)Bill of materials report
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
65
Which of the following is an input file necessary to run an MRP system?

A)Bill of materials (BOM) file
B)Quality management report
C)Exception reports
D)Planned-order schedules
E)Purchasing contracts
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
66
In an MRP program, the program accesses the status segment of an inventory record according to specific periods called which of the following?

A)Cubed time units
B)Time buckets
C)BOM units
D)Time modules
E)Time lines
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 66 flashcards in this deck.