Deck 7: Manufacturing Processes

Full screen (f)
exit full mode
Question
The focus in the make-to-stock environment is on providing finished goods where and when the customers want them.
Use Space or
up arrow
down arrow
to flip the card.
Question
Break-even analysis can be used to help decide whether to perform a task with a special-purpose machine or with a general-purpose machine.
Question
One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is discrete rather than continuous.
Question
A project layout is characterized by a relatively low number of production units in comparison with process and product layout formats.
Question
Engineer-to-order firms will work with the customer to design the product and then make it from purchased materials, parts, and components.
Question
The closer the customer is to the customer order decoupling point, the longer it takes the customer to receive the product.
Question
The term "assembly line" refers to progressive assembly linked by some material handling device.
Question
One methodology used to evaluate equipment investment decisions where the investment entails an initial investment, fixed costs, and variable costs is break-even analysis.
Question
A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate.
Question
Process selection refers to the strategic decision of selecting which kind of production processes to use to produce a product or provide a service.
Question
The volume requirements for the product are one determinant of the choice of which process structure to select.
Question
Break-even analysis can only be used in production equipment decision making when dealing solely with fixed costs, not variable costs.
Question
A general-purpose machine is less capable than a special-purpose machine in certain tasks but can perform a broader variety of tasks.
Question
The time needed to respond to a customer's order is called the customer response time.
Question
A make-to-order firm will work with the customer to design the product and then make it from purchased materials, parts, and components.
Question
The closer the customer is to the customer order decoupling point, the more quickly the customer receives the product.
Question
A project layout is characterized by a high degree of task ordering.
Question
The product-process matrix shows the relationship between process structures and product volume and variety characteristics.
Question
Work-center layouts allocate dissimilar machines into cells to work on products that have dissimilar processing requirements.
Question
One trade-off illustrated by the product-process matrix is between flexibility and cost.
Question
The essential issue in satisfying customers in the make-to-stock environment is to balance the level of finished inventory against the level of service to the customer.
Question
The essential issue in satisfying customers in the make-to-stock environment is to balance the cost of the finished item against the willingness of the consumer to pay for it.
Question
Lean manufacturing means minimizing the number of workers and machines used in a process.
Question
The placement of which of the following is not determined by production process organization decisions?

A) Departments
B) Work groups
C) Workstations
D) Machines
E) Emergency exits
Question
A manufacturing cell layout is a dedicated area where products that are for the same or very similar customers are produced.
Question
Which of the following is not considered a major workflow structure?

A) Work center
B) Project
C) Assembly line
D) Fabrication
E) Continuous flow
Question
An example of an assemble-to-order firm is Dell Computer.
Question
Which of the following is a basic type of process structure?

A) Process flow diagram
B) Product matrix
C) Process matrix
D) Work center
E) Manual assembly
Question
Assemble-to-order means moving the customer order decoupling point from finished goods to components.
Question
A difference between project and continuous flow categories of process flow structures is which of the following?

A) The size and bulk of the product
B) Discrete parts moving from workstation to workstation
C) Degree of equipment specialization
D) Being a "virtual factory"
E) Profit per unit
Question
A process flowchart denotes what happens to the product as it progresses through the productive facility.
Question
Which of the following basic types of process structures is one in which equipment or work processes are arranged according to the progressive steps by which the product is made?

A) Project
B) Work center
C) Manufacturing cell
D) Assembly line
E) Continuous process
Question
Which of the following is not a basic type of process structure?

A) Product-process matrix
B) Work center
C) Manufacturing cell
D) Assembly line
E) Continuous process
Question
Assume a fixed cost for a process of $15,000. The variable cost to produce each unit of product is $10, and the selling price for the finished product is $25. Which of the following is the number of units that has to be produced and sold to break even?

A) 500 units
B) 667 units
C) 790 units
D) 900 units
E) 1,000 units
Question
A customer order decoupling point is where the order moves from the marketing department to the production department.
Question
Assume a fixed cost for a process of $120,000. The variable cost to produce each unit of product is $35, and the selling price for the finished product is $50. Which of the following is the number of units that has to be produced and sold to break even?

A) 5,000 units
B) 6,000 units
C) 8,000 units
D) 11,000 units
E) 12,000 units
Question
A project layout is only used for products in a fixed location.
Question
Which of the following basic types of process structures is one in which similar equipment or functions are grouped together?

A) Project
B) Work center
C) Manufacturing cell
D) Assembly line
E) Continuous process
Question
In a work center, Machine A has a 10-minute set-up time per batch and a 2-minute per unit run time. Machine B performs the identical function but has a set-up time of 30 minutes and a 1-minute run time per unit. The work center makes products in batches ranging from 1 unit to 100 units. Assuming capacity is not a limitation on either Machine, in order to minimize the total processing time, on which batches should Machine B be used?

A) All batches should be run on Machine B.
B) Batches of more than 20 units should be run on Machine B.
C) Batches of fewer than 80 units should be run on Machine B.
D) Batches with up to 50 units should be run on Machine B.
E) No batches should be run on Machine B.
Question
You are hired as a consultant to decide if your client should purchase a new, highly specialized piece of equipment. The product to be produced by this equipment is forecast to have a total worldwide demand of 15,000 units over the entire product life. The initial investment to acquire and install the equipment is $256,000. The variable cost to produce each unit will be $15, and the selling price for the finished product will be $30. Which of the following best describes the situation the firm is facing?

A) The company will recover its initial investment.
B) The company's total margin will be less than its investment.
C) It is a good investment.
D) The break-even is lower than the 15,000 units that are expected to sell.
E) All of these choices are correct.
Question
This tool defines how parts go together, their order of assembly, and often the overall material flow pattern.

A) Blueprint
B) Assembly drawing
C) Flow diagram
D) Assembly chart
E) Operation and route sheet
Question
Here the firm works with the customer to design the product, which is then made from purchased material, parts, and components?

A) Engineer-to-order
B) Make-to-order
C) Assemble-to-order
D) Make-to-stock
E) Custom order
Question
Suppose that you have two processes A and B for producing a widget. Process A has a fixed cost of $10,000 and per unit variable cost of $80.00. Process B has a fixed cost of $30,000 and the per unit variable cost is $40.00. The widget sells for $100 regardless of production Process used. During the next three years (your planning horizon for the widgets) you expect the economy to be pretty good with sales of widgets to be at least 700 units per year. You will

A) be indifferent between choosing Process A and B, because they both have the same break-even point.
B) choose Process A since it has a low fixed cost.
C) choose Process B, since it has low variable cost.
D) choose either Process A or B, since both will result in same profit for the next three years.
E) choose Process B, since it will have higher net profit than Process A in the next three years.
Question
A production environment where the customer is served "on-demand" from finished goods inventory is?

A) Engineer-to-order
B) Make-to-order
C) Assemble-to-order
D) Make-to-stock
E) Custom order
Question
This tool specifies operations and process routing for a particular part.

A) Blueprint
B) Assembly drawing
C) Flow diagram
D) Assembly chart
E) Operation and route sheet
Question
In studying positioning of inventory in supply chains, which, if any, of the following is most appropriate?
I. As order decoupling point moves towards source, inventory investment goes down.
II. As order decoupling point moves towards the source, customer lead time gets longer.
III. As order decoupling point moves towards the source, inventory investment increases.
IV. As order decoupling point moves towards the source, customer lead time is unchanged.

A) I
B) II
C) III
D) IV
E) I and II
Question
In studying the product-process matrix describing layout strategies, which of the following is most appropriate?
I. As you move from project to manufacturing cell to continuous process, product volume increases while standardization increases.
II. As you move from project to manufacturing cell to continuous process, product volume decreases while standardization decreases.
III. As you move from project to manufacturing cell to continuous process, product volume increases while standardization decreases.
IV. As you move from project to manufacturing cell to continuous process, product volume decreases while standardization increases.

A) I
B) II
C) III
D) IV
E) I and II
Question
An exploded view of the product showing its component parts is?

A) Blueprint
B) Assembly drawing
C) Flow diagram
D) Assembly chart
E) Operation and route sheet
Question
Which of the following tend to have higher levels of inventory investment?

A) Assemble-to-order
B) Engineer-to-order
C) Make-to-stock
D) Make-to-order
Question
A production environment where pre-assembled components, subassemblies, and modules are put together in response to a specific customer order is?

A) Engineer-to-order
B) Make-to-order
C) Assemble-to-order
D) Make-to-stock
E) Custom order
Question
A production environment where the product is built directly from raw materials and components in response to a specific customer order is?

A) Engineer-to-order
B) Make-to-order
C) Assemble-to-order
D) Make-to-stock
E) Custom order
Question
Having stamping and drill press departments would imply which of the following types of layouts?

A) Project
B) Work-center
C) Manufacturing cell
D) Assembly line
E) Continuous process
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/52
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 7: Manufacturing Processes
1
The focus in the make-to-stock environment is on providing finished goods where and when the customers want them.
True
2
Break-even analysis can be used to help decide whether to perform a task with a special-purpose machine or with a general-purpose machine.
True
3
One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is discrete rather than continuous.
True
4
A project layout is characterized by a relatively low number of production units in comparison with process and product layout formats.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
5
Engineer-to-order firms will work with the customer to design the product and then make it from purchased materials, parts, and components.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
6
The closer the customer is to the customer order decoupling point, the longer it takes the customer to receive the product.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
7
The term "assembly line" refers to progressive assembly linked by some material handling device.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
8
One methodology used to evaluate equipment investment decisions where the investment entails an initial investment, fixed costs, and variable costs is break-even analysis.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
9
A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
10
Process selection refers to the strategic decision of selecting which kind of production processes to use to produce a product or provide a service.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
11
The volume requirements for the product are one determinant of the choice of which process structure to select.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
12
Break-even analysis can only be used in production equipment decision making when dealing solely with fixed costs, not variable costs.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
13
A general-purpose machine is less capable than a special-purpose machine in certain tasks but can perform a broader variety of tasks.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
14
The time needed to respond to a customer's order is called the customer response time.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
15
A make-to-order firm will work with the customer to design the product and then make it from purchased materials, parts, and components.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
16
The closer the customer is to the customer order decoupling point, the more quickly the customer receives the product.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
17
A project layout is characterized by a high degree of task ordering.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
18
The product-process matrix shows the relationship between process structures and product volume and variety characteristics.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
19
Work-center layouts allocate dissimilar machines into cells to work on products that have dissimilar processing requirements.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
20
One trade-off illustrated by the product-process matrix is between flexibility and cost.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
21
The essential issue in satisfying customers in the make-to-stock environment is to balance the level of finished inventory against the level of service to the customer.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
22
The essential issue in satisfying customers in the make-to-stock environment is to balance the cost of the finished item against the willingness of the consumer to pay for it.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
23
Lean manufacturing means minimizing the number of workers and machines used in a process.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
24
The placement of which of the following is not determined by production process organization decisions?

A) Departments
B) Work groups
C) Workstations
D) Machines
E) Emergency exits
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
25
A manufacturing cell layout is a dedicated area where products that are for the same or very similar customers are produced.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following is not considered a major workflow structure?

A) Work center
B) Project
C) Assembly line
D) Fabrication
E) Continuous flow
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
27
An example of an assemble-to-order firm is Dell Computer.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
28
Which of the following is a basic type of process structure?

A) Process flow diagram
B) Product matrix
C) Process matrix
D) Work center
E) Manual assembly
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
29
Assemble-to-order means moving the customer order decoupling point from finished goods to components.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
30
A difference between project and continuous flow categories of process flow structures is which of the following?

A) The size and bulk of the product
B) Discrete parts moving from workstation to workstation
C) Degree of equipment specialization
D) Being a "virtual factory"
E) Profit per unit
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
31
A process flowchart denotes what happens to the product as it progresses through the productive facility.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
32
Which of the following basic types of process structures is one in which equipment or work processes are arranged according to the progressive steps by which the product is made?

A) Project
B) Work center
C) Manufacturing cell
D) Assembly line
E) Continuous process
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
33
Which of the following is not a basic type of process structure?

A) Product-process matrix
B) Work center
C) Manufacturing cell
D) Assembly line
E) Continuous process
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
34
Assume a fixed cost for a process of $15,000. The variable cost to produce each unit of product is $10, and the selling price for the finished product is $25. Which of the following is the number of units that has to be produced and sold to break even?

A) 500 units
B) 667 units
C) 790 units
D) 900 units
E) 1,000 units
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
35
A customer order decoupling point is where the order moves from the marketing department to the production department.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
36
Assume a fixed cost for a process of $120,000. The variable cost to produce each unit of product is $35, and the selling price for the finished product is $50. Which of the following is the number of units that has to be produced and sold to break even?

A) 5,000 units
B) 6,000 units
C) 8,000 units
D) 11,000 units
E) 12,000 units
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
37
A project layout is only used for products in a fixed location.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
38
Which of the following basic types of process structures is one in which similar equipment or functions are grouped together?

A) Project
B) Work center
C) Manufacturing cell
D) Assembly line
E) Continuous process
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
39
In a work center, Machine A has a 10-minute set-up time per batch and a 2-minute per unit run time. Machine B performs the identical function but has a set-up time of 30 minutes and a 1-minute run time per unit. The work center makes products in batches ranging from 1 unit to 100 units. Assuming capacity is not a limitation on either Machine, in order to minimize the total processing time, on which batches should Machine B be used?

A) All batches should be run on Machine B.
B) Batches of more than 20 units should be run on Machine B.
C) Batches of fewer than 80 units should be run on Machine B.
D) Batches with up to 50 units should be run on Machine B.
E) No batches should be run on Machine B.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
40
You are hired as a consultant to decide if your client should purchase a new, highly specialized piece of equipment. The product to be produced by this equipment is forecast to have a total worldwide demand of 15,000 units over the entire product life. The initial investment to acquire and install the equipment is $256,000. The variable cost to produce each unit will be $15, and the selling price for the finished product will be $30. Which of the following best describes the situation the firm is facing?

A) The company will recover its initial investment.
B) The company's total margin will be less than its investment.
C) It is a good investment.
D) The break-even is lower than the 15,000 units that are expected to sell.
E) All of these choices are correct.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
41
This tool defines how parts go together, their order of assembly, and often the overall material flow pattern.

A) Blueprint
B) Assembly drawing
C) Flow diagram
D) Assembly chart
E) Operation and route sheet
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
42
Here the firm works with the customer to design the product, which is then made from purchased material, parts, and components?

A) Engineer-to-order
B) Make-to-order
C) Assemble-to-order
D) Make-to-stock
E) Custom order
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
43
Suppose that you have two processes A and B for producing a widget. Process A has a fixed cost of $10,000 and per unit variable cost of $80.00. Process B has a fixed cost of $30,000 and the per unit variable cost is $40.00. The widget sells for $100 regardless of production Process used. During the next three years (your planning horizon for the widgets) you expect the economy to be pretty good with sales of widgets to be at least 700 units per year. You will

A) be indifferent between choosing Process A and B, because they both have the same break-even point.
B) choose Process A since it has a low fixed cost.
C) choose Process B, since it has low variable cost.
D) choose either Process A or B, since both will result in same profit for the next three years.
E) choose Process B, since it will have higher net profit than Process A in the next three years.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
44
A production environment where the customer is served "on-demand" from finished goods inventory is?

A) Engineer-to-order
B) Make-to-order
C) Assemble-to-order
D) Make-to-stock
E) Custom order
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
45
This tool specifies operations and process routing for a particular part.

A) Blueprint
B) Assembly drawing
C) Flow diagram
D) Assembly chart
E) Operation and route sheet
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
46
In studying positioning of inventory in supply chains, which, if any, of the following is most appropriate?
I. As order decoupling point moves towards source, inventory investment goes down.
II. As order decoupling point moves towards the source, customer lead time gets longer.
III. As order decoupling point moves towards the source, inventory investment increases.
IV. As order decoupling point moves towards the source, customer lead time is unchanged.

A) I
B) II
C) III
D) IV
E) I and II
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
47
In studying the product-process matrix describing layout strategies, which of the following is most appropriate?
I. As you move from project to manufacturing cell to continuous process, product volume increases while standardization increases.
II. As you move from project to manufacturing cell to continuous process, product volume decreases while standardization decreases.
III. As you move from project to manufacturing cell to continuous process, product volume increases while standardization decreases.
IV. As you move from project to manufacturing cell to continuous process, product volume decreases while standardization increases.

A) I
B) II
C) III
D) IV
E) I and II
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
48
An exploded view of the product showing its component parts is?

A) Blueprint
B) Assembly drawing
C) Flow diagram
D) Assembly chart
E) Operation and route sheet
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
49
Which of the following tend to have higher levels of inventory investment?

A) Assemble-to-order
B) Engineer-to-order
C) Make-to-stock
D) Make-to-order
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
50
A production environment where pre-assembled components, subassemblies, and modules are put together in response to a specific customer order is?

A) Engineer-to-order
B) Make-to-order
C) Assemble-to-order
D) Make-to-stock
E) Custom order
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
51
A production environment where the product is built directly from raw materials and components in response to a specific customer order is?

A) Engineer-to-order
B) Make-to-order
C) Assemble-to-order
D) Make-to-stock
E) Custom order
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
52
Having stamping and drill press departments would imply which of the following types of layouts?

A) Project
B) Work-center
C) Manufacturing cell
D) Assembly line
E) Continuous process
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 52 flashcards in this deck.