Deck 21: Roof Trusses
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/21
Play
Full screen (f)
Deck 21: Roof Trusses
1
In the note "NYS P.E. Approved Roof Trusses @24" OC," P.E. stands for ____.
A) professional estimation
B) practiced estimation
C) process engineer
D) professional engineer
A) professional estimation
B) practiced estimation
C) process engineer
D) professional engineer
D
2
The truss ____ includes a drawing of the truss and all the engineering data required to build the truss.
A) profile
B) span
C) layout
D) detail
A) profile
B) span
C) layout
D) detail
D
3
The roof framing at a gable end need not include studs.
False
4

A) delivery list
B) detail plan
C) layout plan
D) floor plan
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
5
To see what the engineered trusses are, refer to the truss ____ from the engineer.
A) plans
B) drawings
C) estimations
D) elevations
A) plans
B) drawings
C) estimations
D) elevations
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
6
On the sheet showing all the types of trusses, the profile is ____.
A) the distance between the outside walls the truss will cover
B) the engineer's letter/number designation for that truss type
C) the number of each type of truss needed for the building
D) a small drawing showing the basic shape of the truss
A) the distance between the outside walls the truss will cover
B) the engineer's letter/number designation for that truss type
C) the number of each type of truss needed for the building
D) a small drawing showing the basic shape of the truss
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
7
The horizontal distance the top chord must extend beyond the building wall is the ____.
A) slope
B) overhang
C) span
D) pitch
A) slope
B) overhang
C) span
D) pitch
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
8
On the sheet showing all the types of trusses, the span is ____.
A) the distance between the outside walls the truss will cover
B) the engineer's letter/number designation for that truss type
C) the number of each type of truss needed for the building
D) a small drawing showing the basic shape of the truss
A) the distance between the outside walls the truss will cover
B) the engineer's letter/number designation for that truss type
C) the number of each type of truss needed for the building
D) a small drawing showing the basic shape of the truss
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
9
A ____ is the triangle formed at the end of the roof by the two top chords of the truss and its bottom chord.
A) gable
B) detail
C) dormer
D) pinnacle
A) gable
B) detail
C) dormer
D) pinnacle
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
10
A ____ sheet shows all the types of trusses used in the building.
A) completion
B) profile
C) plan
D) delivery
A) completion
B) profile
C) plan
D) delivery
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
11

A) delivery list
B) engineering detail
C) layout plan
D) floor plan
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
12

A) dormer without overhang
B) dormer with overhang
C) gable-end truss without overhang
D) gable-end truss with overhang
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
13
The snow accumulation may weigh up to 40 pounds per square foot on level ground and the wind might be up to 115 miles per hour.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
14
The plans and elevations for the building show a minimum of information about the trusses.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
15
The unit rise of the roof is the ____.
A) overhang
B) slope
C) profile
D) span
A) overhang
B) slope
C) profile
D) span
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
16
The packet of engineering drawings usually includes a truss layout plan.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
17
In most roofs the frame is made up primarily of rafters.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
18
On the sheet showing all the types of trusses, the truss ID is ____.
A) the distance between the outside walls the truss will cover
B) the engineer's letter/number designation for that truss type
C) the number of each type of truss needed for the building
D) a small drawing showing the basic shape of the truss
A) the distance between the outside walls the truss will cover
B) the engineer's letter/number designation for that truss type
C) the number of each type of truss needed for the building
D) a small drawing showing the basic shape of the truss
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
19
The ____ plan shows each truss in place on the building, with a label to indicate the truss ID.
A) truss detail
B) truss overview
C) truss layout
D) truss profile
A) truss detail
B) truss overview
C) truss layout
D) truss profile
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
20
In some applications, the engineer will call for the trusses to be applied in 2-ply or 3-ply.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
21
When an overhang is needed on the gable end, it can be built as part of the gable-end ____.
A) joint
B) wall
C) beam
D) truss
A) joint
B) wall
C) beam
D) truss
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck