Deck 16: Budget Estimating

Full screen (f)
exit full mode
Question
The____ method is the most sophisticated preliminary estimating technique and provides the greatest ability to manage the cost of projects from conception to construction.

A)assembly
B)piece
C)elemental
D)labor
Use Space or
up arrow
down arrow
to flip the card.
Question
The assembly method of estimating is less accurate than the single-rate methods.
Question
Single-rate methods are generally accurate and can be very useful for the cost management of a project.
Question
The typical bay method is more flexible than the assembly method.
Question
____ estimation methods include price per typical bay, assembly, and elemental estimates.

A)Single-rate
B)Bulk-rate
C)Multi-rate
D)Volume
Question
The ____ of the building is calculated by multiplying the area of the building by the height from the bottom of the gravel under the basement slab-on-grade to the top of the roof surface.

A)area
B)coverage
C)volume
D)mass
Question
Preliminary estimating methods can be used to determine a price before working drawings are available.
Question
Estimators typically turn to preliminary estimating methods to compile a budget estimate when there is too little design information available to put together a detailed estimate.
Question
Using the price per unit estimating method can generate a rough estimate quickly, but the lack of accuracy will render it of little use in cost planning.
Question
With the ____ method of estimating, a certain unit that is common to all projects of this type is selected and the number of these units is calculated for each project.

A)price per unit
B)single-rate
C)piece
D)job
Question
Assembly estimating can be a powerful cost control tool since the nature of the assembly, materials, and construction methods can all be defined and these data can be reflected in the estimated price.
Question
Using the ____ method, a building, which may contain hundreds of components, may be reduced to a few assemblies, which can be measured and priced relatively quickly from records of previous assembly costs.

A)elemental
B)component
C)piece
D)assembly
Question
Which of the following is NOT a multi-rate method of preliminary estimating?

A)Cost per unit area
B)Cost per typical day
C)Assembly estimates
D)Elemental estimates
Question
The ____ is defined as the area of all floors measured to the outside of the containing walls.

A)gross work area
B)gross coverage area
C)gross blanket area
D)gross floor area
Question
____ estimating methods include the price per unit, price per unit area, and price per unit volume.

A)Volume
B)Single-rate
C)Bulk-rate
D)Multi-rate
Question
The ____ estimating method can be used with any building layout and provides the estimator the opportunity to account for variables on an overall basis without having to contend with the fine detail of the design.

A)assembly
B)elemental
C)component
D)unit
Question
Single-rate methods of preliminary estimating include all of the following EXCEPT ____________.

A)cost per unit
B)cost per unit area
C)cost per typical bay
D)cost per unit volume
Question
____ is the most common method of preliminary estimating.

A)Price per room
B)Price per unit area
C)Price per day
D)Price per hour
Question
Typical bay estimates are very common because it is easy to find a "typical" bay size.
Question
Composite unit prices that are custom made for the particular project are superior.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 16: Budget Estimating
1
The____ method is the most sophisticated preliminary estimating technique and provides the greatest ability to manage the cost of projects from conception to construction.

A)assembly
B)piece
C)elemental
D)labor
C
2
The assembly method of estimating is less accurate than the single-rate methods.
False
3
Single-rate methods are generally accurate and can be very useful for the cost management of a project.
False
4
The typical bay method is more flexible than the assembly method.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
____ estimation methods include price per typical bay, assembly, and elemental estimates.

A)Single-rate
B)Bulk-rate
C)Multi-rate
D)Volume
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
The ____ of the building is calculated by multiplying the area of the building by the height from the bottom of the gravel under the basement slab-on-grade to the top of the roof surface.

A)area
B)coverage
C)volume
D)mass
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
Preliminary estimating methods can be used to determine a price before working drawings are available.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
Estimators typically turn to preliminary estimating methods to compile a budget estimate when there is too little design information available to put together a detailed estimate.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
Using the price per unit estimating method can generate a rough estimate quickly, but the lack of accuracy will render it of little use in cost planning.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
With the ____ method of estimating, a certain unit that is common to all projects of this type is selected and the number of these units is calculated for each project.

A)price per unit
B)single-rate
C)piece
D)job
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
Assembly estimating can be a powerful cost control tool since the nature of the assembly, materials, and construction methods can all be defined and these data can be reflected in the estimated price.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
Using the ____ method, a building, which may contain hundreds of components, may be reduced to a few assemblies, which can be measured and priced relatively quickly from records of previous assembly costs.

A)elemental
B)component
C)piece
D)assembly
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following is NOT a multi-rate method of preliminary estimating?

A)Cost per unit area
B)Cost per typical day
C)Assembly estimates
D)Elemental estimates
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
The ____ is defined as the area of all floors measured to the outside of the containing walls.

A)gross work area
B)gross coverage area
C)gross blanket area
D)gross floor area
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
____ estimating methods include the price per unit, price per unit area, and price per unit volume.

A)Volume
B)Single-rate
C)Bulk-rate
D)Multi-rate
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
The ____ estimating method can be used with any building layout and provides the estimator the opportunity to account for variables on an overall basis without having to contend with the fine detail of the design.

A)assembly
B)elemental
C)component
D)unit
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
Single-rate methods of preliminary estimating include all of the following EXCEPT ____________.

A)cost per unit
B)cost per unit area
C)cost per typical bay
D)cost per unit volume
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
____ is the most common method of preliminary estimating.

A)Price per room
B)Price per unit area
C)Price per day
D)Price per hour
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
Typical bay estimates are very common because it is easy to find a "typical" bay size.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
Composite unit prices that are custom made for the particular project are superior.