Deck 14: Pricing General Expenses

Full screen (f)
exit full mode
Question
The cost of the electricity used to meet the general power and lighting needs of the job is most often an educated guess.
Use Space or
up arrow
down arrow
to flip the card.
Question
General expenses that cannot be priced until the total price of the work is determined are separated from the other general expense items and are priced at the end of the estimate as "____."

A)overhead
B)add-ons
C)overruns
D)conditionals
Question
Even when the new project is of a different type or size from the contractor's previous projects, an approximate schedule in the form of a bar chart of the major activities can often still be drafted.
Question
Most general expense items are referred to in the project specifications.
Question
The final cleanup expenses include the cost of renting large garbage containers and the cost of constructing and later taking down temporary garbage chutes on the project.
Question
The cost of labor, material, and equipment expended on the items that were measured in the quantity takeoffs is usually referred to as the "____" of the work.

A)indirect costs
B)inferred costs
C)extraneous costs
D)direct costs
Question
The "____" of a project comprise all of the additional, indirect costs that are also necessary to facilitate the construction of the project.

A)general expenses
B)direct costs
C)indirect costs
D)extraneous costs
Question
Layout is an allowance for the cost of helpers assisting a surveyor, an engineer, or the project superintendent with survey work involved in setting out the lines and levels of the project.
Question
Direct costs are sometimes titled General Requirements of the Project or Project Overheads.
Question
Worker's Compensation and Employer's Liability ____ is required by state regulations; contributions are collected to provide a fund from which workers who are injured while working or as a result of working are compensated.

A)Bond
B)Insurance
C)Pledge
D)Security
Question
The price of general expenses can be a substantial component of the bid, amounting to 15% and more of the total price in some cases.
Question
On a small to medium-sized project, the ____ sheet can be used as a checklist that allows the estimator to choose those items that are required on the project under consideration.

A)Detail Expense
B)Job Expense
C)General Expense
D)Overhead Expense
Question
________ refer(s)to a federal government requirement to provide retirement benefits to persons who become eligible.

A)Social Security Tax
B)Unemployment Compensation Tax
C)Worker's Compensation and Employer's Liability Insurance
D)Fringe Benefits
Question
Which of the following includes a number of items that could be contained in a contract of employment or a union collective agreement?

A)Public liability insurance
B)Property damage insurance
C)Social Security Tax
D)Fringe benefits
Question
____ refer to the cost of removing water from excavations and in some cases from the basements of projects under construction.

A)Dewatering expenses
B)Dehydration expenses
C)Environmental expenses
D)Preparation expenses
Question
Payroll taxes that apply to the total labor price of the estimate can be handled with an add-on.
Question
Many general expense items are calculated as a function of the duration of the project.
Question
Meeting general safety requirements can add up to _______ of the labor bill on a medium to large project.

A)1.5%
B)2.5%
C)5%
D)7.5%
Question
____ require construction sites to have first aid kits sufficient to meet the needs of the project.

A)Environmental Regulations
B)Material Safety Regulations
C)Industrial Operations Regulations
D)Occupational Health and Safety Regulations
Question
The ____ is the extra payment over and above the basic wage rate that is paid to employees who work time in excess of the standard work day or work week.

A)overtime premium
B)completion premium
C)delay premium
D)delivery premium
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 14: Pricing General Expenses
1
The cost of the electricity used to meet the general power and lighting needs of the job is most often an educated guess.
False
2
General expenses that cannot be priced until the total price of the work is determined are separated from the other general expense items and are priced at the end of the estimate as "____."

A)overhead
B)add-ons
C)overruns
D)conditionals
B
3
Even when the new project is of a different type or size from the contractor's previous projects, an approximate schedule in the form of a bar chart of the major activities can often still be drafted.
True
4
Most general expense items are referred to in the project specifications.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
The final cleanup expenses include the cost of renting large garbage containers and the cost of constructing and later taking down temporary garbage chutes on the project.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
The cost of labor, material, and equipment expended on the items that were measured in the quantity takeoffs is usually referred to as the "____" of the work.

A)indirect costs
B)inferred costs
C)extraneous costs
D)direct costs
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
The "____" of a project comprise all of the additional, indirect costs that are also necessary to facilitate the construction of the project.

A)general expenses
B)direct costs
C)indirect costs
D)extraneous costs
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
Layout is an allowance for the cost of helpers assisting a surveyor, an engineer, or the project superintendent with survey work involved in setting out the lines and levels of the project.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
Direct costs are sometimes titled General Requirements of the Project or Project Overheads.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
Worker's Compensation and Employer's Liability ____ is required by state regulations; contributions are collected to provide a fund from which workers who are injured while working or as a result of working are compensated.

A)Bond
B)Insurance
C)Pledge
D)Security
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
The price of general expenses can be a substantial component of the bid, amounting to 15% and more of the total price in some cases.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
On a small to medium-sized project, the ____ sheet can be used as a checklist that allows the estimator to choose those items that are required on the project under consideration.

A)Detail Expense
B)Job Expense
C)General Expense
D)Overhead Expense
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
________ refer(s)to a federal government requirement to provide retirement benefits to persons who become eligible.

A)Social Security Tax
B)Unemployment Compensation Tax
C)Worker's Compensation and Employer's Liability Insurance
D)Fringe Benefits
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
Which of the following includes a number of items that could be contained in a contract of employment or a union collective agreement?

A)Public liability insurance
B)Property damage insurance
C)Social Security Tax
D)Fringe benefits
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
____ refer to the cost of removing water from excavations and in some cases from the basements of projects under construction.

A)Dewatering expenses
B)Dehydration expenses
C)Environmental expenses
D)Preparation expenses
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
Payroll taxes that apply to the total labor price of the estimate can be handled with an add-on.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
Many general expense items are calculated as a function of the duration of the project.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
Meeting general safety requirements can add up to _______ of the labor bill on a medium to large project.

A)1.5%
B)2.5%
C)5%
D)7.5%
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
____ require construction sites to have first aid kits sufficient to meet the needs of the project.

A)Environmental Regulations
B)Material Safety Regulations
C)Industrial Operations Regulations
D)Occupational Health and Safety Regulations
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
The ____ is the extra payment over and above the basic wage rate that is paid to employees who work time in excess of the standard work day or work week.

A)overtime premium
B)completion premium
C)delay premium
D)delivery premium
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 20 flashcards in this deck.