Question
In general, items of excavation, backfill, and fill materials are measured in cubic feet.
Use Space or
up arrow
down arrow
to flip the card.
Question
"Bank measure" amounts are obtained by using the dimensions of the holes excavated or filled with no adjustment made to the quantities obtained for swell or compaction of materials.
Question
Before the estimator can measure the site work, he or she has to make an assessment of excavation requirements from data in the specifications and drawings and from information gathered on visits to the site.
Question
Bearing piles are classified as all of the following EXCEPT:

A)Caisson piles
B)Square timber piles
C)Steel piles
D)Round timber piles
Question
The soil that is extracted from an excavation is less dense than before it was excavated, so it will occupy more space than it did when it was in the ground.
Question
The difference between the volume of the hole and the volume of the material once it has been dug out is known as the ____ factor.

A)swell
B)growth
C)limiting
D)compaction
Question
The purpose of the ____ is to furnish data about the site that is necessary to undertake the design of the foundation system.

A)site report
B)soils report
C)environmental report
D)geology report
Question
In accordance with the general principle of measuring net quantities, excavation and backfill quantities are calculated using "____."

A)depth measure
B)composite measure
C)bank measure
D)hold measure
Question
Bearing piles are measured in linear feet or in linear meters.
Question
Contractors are usually advised in the "____" to satisfy themselves as to the present condition of the site.

A)Notice to Bidders
B)Notice to Contractors
C)Instructions to Bidders
D)Instructions to Contractors
Question
Measuring sitework and excavation work is the same as measuring most other work of a construction project.
Question
The difference between the volume of the hole to be filled and the volume of fill material used to fill is referred to as the ____ factor.

A)swell
B)limiting
C)bank
D)compaction
Question
____ are electronic devices that enable the user to take measurements from drawings and input the data directly into a computer program.

A)Digitizers
B)Analyzers
C)Analogs
D)Probes
Question
The volume of excavation for pits or basements can be obtained by using which formula?

A)Pit Volume = Average Length of Pit + Average Width of Pit + Average Depth of Pit
B)Pit Volume = Average Length of Pit X Average Width of Pit X Average Depth of Pit
C)Pit Volume = Average Length of Pit / Average Width of Pit X Average Depth of Pit
D)Pit Volume = Average Length of Pit X Average Width of Pit / Average Depth of Pit
Question
Generally, the volume of backfill for a trench is equal to the volume of excavation minus the volume of what is to be contained within the trench.
Question
Sheet piling is measured in _____.

A)square feet
B)cubic feet
C)cubic meters
D)square yards
Question
OSHA's Construction Safety and Health Regulation s require that the sides of all earth embankments and trenches over 6'0"deep be adequately protected by a shoring system or by cutting back the sides of the excavations to a safe angle.
Question
When a soils report is included with the specifications, it is usually a bid document.
Question
The soils report provides information about the subsurface conditions at the site obtained from bore holes or other investigations made by the topographic engineer.
Question
Calculation by the "________" method requires a survey of the site showing the elevation of the existing grade at each intersection point on the grid.

A)grid
B)grade
C)elevation
D)intersection
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 4: Measuring Sitework, Excavation and Piling
1
In general, items of excavation, backfill, and fill materials are measured in cubic feet.
False
2
"Bank measure" amounts are obtained by using the dimensions of the holes excavated or filled with no adjustment made to the quantities obtained for swell or compaction of materials.
True
3
Before the estimator can measure the site work, he or she has to make an assessment of excavation requirements from data in the specifications and drawings and from information gathered on visits to the site.
True
4
Bearing piles are classified as all of the following EXCEPT:

A)Caisson piles
B)Square timber piles
C)Steel piles
D)Round timber piles
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
The soil that is extracted from an excavation is less dense than before it was excavated, so it will occupy more space than it did when it was in the ground.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
The difference between the volume of the hole and the volume of the material once it has been dug out is known as the ____ factor.

A)swell
B)growth
C)limiting
D)compaction
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
The purpose of the ____ is to furnish data about the site that is necessary to undertake the design of the foundation system.

A)site report
B)soils report
C)environmental report
D)geology report
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
In accordance with the general principle of measuring net quantities, excavation and backfill quantities are calculated using "____."

A)depth measure
B)composite measure
C)bank measure
D)hold measure
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
Bearing piles are measured in linear feet or in linear meters.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
Contractors are usually advised in the "____" to satisfy themselves as to the present condition of the site.

A)Notice to Bidders
B)Notice to Contractors
C)Instructions to Bidders
D)Instructions to Contractors
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
Measuring sitework and excavation work is the same as measuring most other work of a construction project.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
The difference between the volume of the hole to be filled and the volume of fill material used to fill is referred to as the ____ factor.

A)swell
B)limiting
C)bank
D)compaction
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
____ are electronic devices that enable the user to take measurements from drawings and input the data directly into a computer program.

A)Digitizers
B)Analyzers
C)Analogs
D)Probes
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
The volume of excavation for pits or basements can be obtained by using which formula?

A)Pit Volume = Average Length of Pit + Average Width of Pit + Average Depth of Pit
B)Pit Volume = Average Length of Pit X Average Width of Pit X Average Depth of Pit
C)Pit Volume = Average Length of Pit / Average Width of Pit X Average Depth of Pit
D)Pit Volume = Average Length of Pit X Average Width of Pit / Average Depth of Pit
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
Generally, the volume of backfill for a trench is equal to the volume of excavation minus the volume of what is to be contained within the trench.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
Sheet piling is measured in _____.

A)square feet
B)cubic feet
C)cubic meters
D)square yards
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
OSHA's Construction Safety and Health Regulation s require that the sides of all earth embankments and trenches over 6'0"deep be adequately protected by a shoring system or by cutting back the sides of the excavations to a safe angle.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
When a soils report is included with the specifications, it is usually a bid document.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
The soils report provides information about the subsurface conditions at the site obtained from bore holes or other investigations made by the topographic engineer.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
Calculation by the "________" method requires a survey of the site showing the elevation of the existing grade at each intersection point on the grid.

A)grid
B)grade
C)elevation
D)intersection
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 20 flashcards in this deck.