Deck 6: Lean Systems
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/166
Play
Full screen (f)
Deck 6: Lean Systems
1
Regarding the Eight Types of Waste that must be eliminated to implement lean systems, excessive movement and material handling of product between processes is part of which general waste category?
A) Motion
B) Transportation
C) Inappropriate Processing
D) Underutilization of Employees
A) Motion
B) Transportation
C) Inappropriate Processing
D) Underutilization of Employees
B
2
Continuous improvement with lean systems:
A) involves navigating a ship over treacherous rocks.
B) requires periodically increasing lot sizes or workforce levels to uncover problems.
C) entails systematically stressing the system and focusing on problem areas.
D) focuses exclusively on internal operations without addressing relationships with customers and suppliers.
A) involves navigating a ship over treacherous rocks.
B) requires periodically increasing lot sizes or workforce levels to uncover problems.
C) entails systematically stressing the system and focusing on problem areas.
D) focuses exclusively on internal operations without addressing relationships with customers and suppliers.
C
3
An operator standing idly by his workstation because a previous process with quality issues was delayed is an example of ________.
Waiting
4
In a lean system, the key to continuous improvement is the understanding that excess capacity or inventory hides problems on the shop floor and thus prevents waste sources from being identified and eliminated.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
5
In manufacturing systems, one way to achieve continuous improvement can be to maintain low inventories, and periodically cut safety stocks almost to zero.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
6
The just-in-time (JIT) system is a(n):
A) management system of people and procedures to fulfill all delivery deadlines.
B) production system of small-lot manufacturing to reduce work-in-process inventory.
C) materials management system for removing all inventories.
D) integrated system of managing resources, information, and decision processes to eliminate waste.
A) management system of people and procedures to fulfill all delivery deadlines.
B) production system of small-lot manufacturing to reduce work-in-process inventory.
C) materials management system for removing all inventories.
D) integrated system of managing resources, information, and decision processes to eliminate waste.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
7
________ is the philosophy that waste can be eliminated by cutting unnecessary inventory and removing non-value-adding activities in operations.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
8
Which of the following statements is True with regard to the eight types of waste that must be eliminated to implement lean systems?
A) Jobs with excessive motion should be redesigned.
B) Work-in-process inventory is the direct result of underutilization of employees.
C) Manufacturing an item before it is needed helps an organization detect and reduce defects.
D) Product damage and deterioration result from using expensive high precision equipment.
A) Jobs with excessive motion should be redesigned.
B) Work-in-process inventory is the direct result of underutilization of employees.
C) Manufacturing an item before it is needed helps an organization detect and reduce defects.
D) Product damage and deterioration result from using expensive high precision equipment.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
9
In lean systems, work-in-process inventory is a direct result of overproduction and waiting.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
10
Kaizen is the Japanese term for continuous improvement.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
11
What did the production manager say to the pile of scrapped material?
A) "Hello muda."
B) "Hello fadduh."
C) "We need more kanbans."
D) "JIT II Brute?"
A) "Hello muda."
B) "Hello fadduh."
C) "We need more kanbans."
D) "JIT II Brute?"
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
12
The Japanese term for continuous improvement in quality and productivity is ________.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
13
In a lean system, large inventories are not considered a type of waste, because they prevent operator wait times.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
14
Regarding the Eight Types of Waste that must be eliminated to implement lean systems, manufacturing an item before it is needed is part of which general waste category?
A) Inappropriate Processing
B) Waiting
C) Inventory
D) Overproduction
A) Inappropriate Processing
B) Waiting
C) Inventory
D) Overproduction
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
15
Regarding the Eight Types of Waste that must be eliminated to implement lean systems, using expensive high precision equipment when a simpler machine would suffice is part of which general waste category?
A) Motion
B) Overproduction
C) Inappropriate Processing
D) Defects
A) Motion
B) Overproduction
C) Inappropriate Processing
D) Defects
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
16
List and briefly define the eight types of waste (or muda) that often occur in firms which must be eliminated in implementing lean systems.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
17
In a lean system, an item that is manufactured before it is needed is not considered waste, because it helps keep material flowing through the system.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
18
Just-in-time (JIT) systems need close relationships with suppliers.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
19
Long production runs, poor material flows, and processes that are not tightly linked to one another can cause over 90% of a product's lead time to be spent waiting.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
20
The just-in-time (JIT) philosophy is the belief that cutting inventory and removing non-value-added activities in operations can eliminate waste.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
21
One tactic of Total Preventive Maintenance (TPM) is to make workers responsible for routine minor maintenance of their own equipment.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
22
A firm that averages sales of 320 units for every 480-minute shift it runs has a takt time of 90 seconds.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
23
A power cord that can be plugged in only one way is an example of a poka-yoke.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
24
Just-in-time (JIT) systems rely on inspectors to inspect quality into the product.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
25
Takt time is the cycle time needed to maximize utilization of an organization's workers and equipment.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
26
Five S practices can be applied to both manufacturing and service settings and can include offices, work spaces, tool rooms, and shop floors.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
27
In lean systems, the need for single-digit setups is driven by the desire for small lot sizes.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
28
Mixed-model assembly is a type of assembly that produces a mix of models in smaller lots.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
29
Firms that have highly repetitive processes and well-defined work flows of standardized items often use the pull method.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
30
Productivity tends to increase when components are standardized because each worker performs a standardized task or work method more often each day.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
31
Toyota sets up all of its operations as experiments and teaches employees at all levels how to use the trial and error method of problem solving.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
32
Automatically stopping the process when something is wrong and then fixing the problems on the line itself as they occur is called jidoka.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
33
While lean systems work very well for manufacturing systems, they cannot be applied to service systems.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
34
Takt time is the cycle time needed to match the rate of production to the rate of sales.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
35
Heijunka is the leveling of production load by both volume and product mix.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
36
JIT II refers to a form of supplier partnership that places a supplier representative, who is empowered to plan and schedule the replenishment of materials from the supplier, in the customer's plant on a full-time basis.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
37
Quality at the source is a philosophy whereby defects are caught and corrected where they are created.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
38
Preventive maintenance is typically given very low priority in just-in-time systems.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
39
Five S practices can enable workers to visually see everything differently, prioritize tasks, and achieve a greater degree of focus.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
40
Push systems are often used in firms with highly repetitive processes and well defined work flows of standardized items.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
41
Lean systems maintain inventory in small lot sizes because small lot sizes:
A) increase pipeline inventory, allowing the organization to buffer against demand uncertainties.
B) increase the quality level of the product.
C) enable schedules to use machine capacities more efficiently.
D) increase manufacturing lead time because of the increase in waiting time.
A) increase pipeline inventory, allowing the organization to buffer against demand uncertainties.
B) increase the quality level of the product.
C) enable schedules to use machine capacities more efficiently.
D) increase manufacturing lead time because of the increase in waiting time.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
42
A method in which production of an item begins in advance of customer needs is called:
A) the andon method.
B) the pull method.
C) the jidoka method.
D) the push method.
A) the andon method.
B) the pull method.
C) the jidoka method.
D) the push method.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
43
There are many requirements for the successful implementation of the lean system of production. Which one of the following is not such a requirement?
A) uniform assembly schedule
B) short setup time
C) low machine failure and low defects
D) substantial natural resources
A) uniform assembly schedule
B) short setup time
C) low machine failure and low defects
D) substantial natural resources
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
44
A takt time of 90 seconds generates a process output of:
A) 40 units per hour.
B) 30 units per hour.
C) 4 units per hour.
D) 90 units per hour.
A) 40 units per hour.
B) 30 units per hour.
C) 4 units per hour.
D) 90 units per hour.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
45
The takt time of a process is defined as:
A) the cycle time needed to match the rate of production to the rate of consumption.
B) the total time required to move an item through a process.
C) the time required to change a machine to run a new model.
D) the lead time necessary to notify maintenance that a problem has occurred in an operation.
A) the cycle time needed to match the rate of production to the rate of consumption.
B) the total time required to move an item through a process.
C) the time required to change a machine to run a new model.
D) the lead time necessary to notify maintenance that a problem has occurred in an operation.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
46
Lean systems try to:
A) produce a product in anticipation of demand.
B) maximize the value added by each of its activities.
C) organize production in large lots to minimize the number of setups.
D) reduce the labor content in all processes.
A) produce a product in anticipation of demand.
B) maximize the value added by each of its activities.
C) organize production in large lots to minimize the number of setups.
D) reduce the labor content in all processes.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
47
Companies using lean systems generally have:
A) many suppliers to ensure that material shortages never occur.
B) suppliers that are located nearby to decrease delivery lead time.
C) suppliers that are willing to accept short-term contracts.
D) suppliers who are low-cost producers.
A) many suppliers to ensure that material shortages never occur.
B) suppliers that are located nearby to decrease delivery lead time.
C) suppliers that are willing to accept short-term contracts.
D) suppliers who are low-cost producers.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
48
The lean system concept will not work without the proper environment. Which one of the following characteristics is most common to firms that have successfully implemented a lean system?
A) uniform assembly schedules
B) specialized workforce
C) high rates of machine failures
D) longer setup times
A) uniform assembly schedules
B) specialized workforce
C) high rates of machine failures
D) longer setup times
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
49
The production of 150 units during a 480-minute work shift results in a takt time of:
A) 150 seconds.
B) 192 seconds.
C) 120 seconds.
D) 18.8 seconds.
A) 150 seconds.
B) 192 seconds.
C) 120 seconds.
D) 18.8 seconds.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
50
Using customer demand to activate production of an item or service is called:
A) the andon method.
B) the pull method.
C) the jidoka method.
D) the push method.
A) the andon method.
B) the pull method.
C) the jidoka method.
D) the push method.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
51
In the Toyota Production System, when a work station needs more material, it is obvious to both the worker and the supplier that material is needed. Further, the amount needed must be understood as well as the delivery time for replenishment.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
52
In the Toyota Production System, services and goods are pushed to the next available person or machine to maintain smooth, rapid flow.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
53
Justin Thyme used to run one batch each of 500 As, 300 Bs and 100 Cs every month but now he runs a batch of 5 As, 3 Bs, and 1 C every half day with the use of:
A) single-digit setups.
B) andon lights.
C) mixed-model assembly.
D) push method.
A) single-digit setups.
B) andon lights.
C) mixed-model assembly.
D) push method.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
54
The production of 240 units during a 480-minute work shift results in a takt time of:
A) 24 seconds.
B) 30 seconds.
C) 120 seconds.
D) 240 seconds.
A) 24 seconds.
B) 30 seconds.
C) 120 seconds.
D) 240 seconds.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
55
In lean systems, if a defective product is found, which of the following is generally not done?
A) The production line is stopped.
B) The defective unit is passed on to the next workstation.
C) The defective unit is returned to the worker responsible for creating the defect.
D) The production line is made aware of the problem without necessarily stopping the line.
A) The production line is stopped.
B) The defective unit is passed on to the next workstation.
C) The defective unit is returned to the worker responsible for creating the defect.
D) The production line is made aware of the problem without necessarily stopping the line.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
56
Mistake-proofing is known by the term:
A) andon.
B) muda.
C) jidoka.
D) poka-yoke.
A) andon.
B) muda.
C) jidoka.
D) poka-yoke.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
57
Lean systems use the standardization of components because standardization:
A) decreases the demand for each component.
B) increases repeatability.
C) increases lot sizes more easily.
D) decreases repeatability.
A) decreases the demand for each component.
B) increases repeatability.
C) increases lot sizes more easily.
D) decreases repeatability.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
58
Automatically stopping the process when something is wrong and then fixing the problems on the line itself as they occur is known as:
A) andon.
B) muda.
C) jidoka.
D) poka-yoke.
A) andon.
B) muda.
C) jidoka.
D) poka-yoke.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
59
The goal of single-digit setups is to have a setup time:
A) of less than one shift.
B) of less than one hour.
C) of less than 30 minutes.
D) of less than 10 minutes.
A) of less than one shift.
B) of less than one hour.
C) of less than 30 minutes.
D) of less than 10 minutes.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
60
Items to be assembled that fit together only the proper way are an example of:
A) andon.
B) jidoka.
C) poka-yoke.
D) muda.
A) andon.
B) jidoka.
C) poka-yoke.
D) muda.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
61
The four bolts that hold the passenger seat in a pickup truck are tightened in a clockwise order beginning with the front right bolt, in 24 seconds. This production factoid illustrates which of the following principles of the Toyota Production System?
A) All work must be specified as to content.
B) Every customer-supplier connection must be direct and unambiguous.
C) The pathway for every service and product must be direct.
D) Any improvements to the system must be made in accordance with the scientific method.
A) All work must be specified as to content.
B) Every customer-supplier connection must be direct and unambiguous.
C) The pathway for every service and product must be direct.
D) Any improvements to the system must be made in accordance with the scientific method.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
62
________ is a methodology consisting of five workplace practices that are conducive to visual controls and lean production.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
63
________ is the leveling of production load by both volume and product mix.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
64
________ refers to mistake-proofing methods aimed at designing fail-safe systems that minimize human error.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
65
A lean system's ________ refers to the cycle time needed to match the rate of production to the rate of sales or consumption.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
66
Automatically stopping the process when something is wrong and then fixing the problems on the line itself as they occur is called ________.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
67
"When in doubt, weed it out" describes which 5S element?
A) Sort
B) Straighten
C) Shine
D) Standardize
A) Sort
B) Straighten
C) Shine
D) Standardize
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
68
Management at Pepman has decided to switch from a push system to a pull system of manufacturing. They are a large repetitive manufacturer of bicycles. Which one of the following is most likely to occur?
A) The cycle time will increase, resulting in higher inventory levels.
B) The space required will increase due to the increase in the number of units that require rework.
C) The decrease in WIP inventory levels will reduce the space requirements.
D) The workers at any given process will produce units before they are needed by the subsequent process.
A) The cycle time will increase, resulting in higher inventory levels.
B) The space required will increase due to the increase in the number of units that require rework.
C) The decrease in WIP inventory levels will reduce the space requirements.
D) The workers at any given process will produce units before they are needed by the subsequent process.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
69
The ________ method activates production of a service or item based on customer demand.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
70
The pathway for every service and product in the Toyota Production System must be ________ and ________.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
71
________ refers to a form of supplier partnership that places a supplier representative, who is empowered to plan and schedule the replenishment of materials from the supplier, in the customer's plant on a full-time basis.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
72
Weeding out unnecessary items, neatly arranging what's left, and cleaning the work area are components of:
A) a Kanban system.
B) a constraint management system.
C) mixed-model assembly.
D) a 5S program.
A) a Kanban system.
B) a constraint management system.
C) mixed-model assembly.
D) a 5S program.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
73
________ practices include early testing of machine parts that may need to be replaced and making workers responsible for routine minor maintenance of their own equipment.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
74
The rack at my assembly station that holds rear view mirrors is empty, so a runner wheels it away and replaces it with a new rack, fully populated with rear view mirrors. This production factoid illustrates which of the following principles of the Toyota Production System?
A) All work must be specified as to content.
B) Every customer-supplier connection must be direct and unambiguous.
C) The pathway for every service and product must be direct.
D) Any improvements to the system must be made in accordance with the scientific method.
A) All work must be specified as to content.
B) Every customer-supplier connection must be direct and unambiguous.
C) The pathway for every service and product must be direct.
D) Any improvements to the system must be made in accordance with the scientific method.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
75
________ refers to the goal of having a setup time of fewer than 10 minutes.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
76
A(n) ________ is a group of activities needed to readjust a process between successive lots of items.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
77
The list of five S practices includes ________, ________, ________, ________ and ________.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
78
A ________ assembly line produces a mix of models in smaller lots.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
79
All improvements to the Toyota Production System must be made using the ________ method.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck
80
Which of the following statements about the Toyota Production System is best?
A) Toyota has built a learning organization over the course of 50 years.
B) The key to success for Toyota is the set of tools and procedures readily apparent on a plant tour.
C) The four principles that form the basis to TPS are impossible to replicate.
D) Toyota has 23 manufacturing plants in North America alone.
A) Toyota has built a learning organization over the course of 50 years.
B) The key to success for Toyota is the set of tools and procedures readily apparent on a plant tour.
C) The four principles that form the basis to TPS are impossible to replicate.
D) Toyota has 23 manufacturing plants in North America alone.
Unlock Deck
Unlock for access to all 166 flashcards in this deck.
Unlock Deck
k this deck