Question
____, such as those used to show bending information for all reinforcing bars used in the job, are an important part of the drawings used in poured-in-place concrete drawings.

A) Specification details
B) Schedules
C) Provisional outlines
D) Fabrication requirements
Use Space or
up arrow
down arrow
to flip the card.
Question
One type of freestanding, self-supporting wall designed to hold back earth, water, or other material, ____ are very heavy, poured-in-place concrete walls usually restricted to applications requiring less than six feet of height.

A) security walls
B) shear walls
C) cantilever walls
D) gravity walls
Question
Briefly describe the three steps involved with poured-in-place concrete construction.
Question
One type of column used in poured-in-place concrete construction is a ____. These columns are reinforced with long, straight reinforcing bars surrounded by spiral wire or reinforcing bars.

A) tied column
B) spiral column
C) spliced column
D) rectangular column
Question
In what types of applications are cantilever walls more appropriate than other types of walls?
Question
The American Concrete Institute (ACI) standard sheet layout ____.

A) specifies the information that must be included on poured-in-place concrete drawings
B) specifies the size of sheet that must be used for poured-in-place concrete drawings
C) dictates the scale that must be used for all poured-in-place concrete drawings
D) is followed by many companies but can be modified to accommodate individual company preferences
Question
Poured-in-place concrete differs from ____ that is poured into forms at a manufacturing plant and then shipped to the jobsite and erected in piece.

A) precast concrete
B) molded concrete
C) ready-made concrete
D) prefabricated concrete
Question
Prepared from engineering drawings and sketches and specifications provided by engineers, ____ contain: plan views, sections and/or details, schedules, bending details, and notes.

A) working drawings
B) concrete structure drawings
C) wall-column drawings
D) placing drawings
Question
One type of column used in poured-in-place concrete construction is a ____. These columns are reinforced with long, straight reinforcing bars tied off with wire ties or smaller, bent reinforcing bars.

A) tied column
B) spiral column
C) spliced column
D) rectangular column
Question
As a typical example of a bar mark number assigned to a reinforcing bar shown on poured-in-place concrete drawings, 4A1 indicates ____.

A) a quantity of 4, bar type A, and length 1, where 1 is matched to the general legend for the drawings
B) a number 4 bar, type A, and quantity of 1 for this bar needed in the job
C) a number 4 bar, type A, and it is the first length of bar used in the job
D) the code for a particular bar type that is specified in the general legend for the drawings
Question
A ____ is a freestanding, self-supporting wall designed to hold back earth, water, or other material.

A) security wall
B) shear wall
C) tilt-up wall
D) retaining wall
Question
____ prepare engineering drawings of column layouts and wall systems from sketches and specifications supplied by structural engineers or architects.

A) CAD technicians
B) CAD managers
C) Junior architects
D) Drafting clerks
Question
Used within poured-in-place concrete structures, common applications of ____ are to provide security from fire, break-ins, or noise.

A) security walls
B) shear walls
C) tilt-up walls
D) retaining walls
Question
____ are used for fabricating the structural members for a job and ordering the materials necessary to do a job.

A) Shop drawings
B) Placing drawings
C) Engineer's sketches
D) Engineering drawings
Question
One of the two types of poured-in-place concrete drawings, ____ show the general layout of the structure, size and spacing of structural components (foundations, walls, beams, columns, etc.), and various notes containing information helpful to the reader in understanding the drawings.

A) shop drawings
B) placing drawings
C) engineer's sketches
D) engineering drawings
Question
One of the two types of poured-in-place concrete drawings, ____ are more detailed, showing the actual size, shape, and locations of all reinforcing bars in a structural member and how the bars are to be placed into the forms.

A) shop drawings
B) placing drawings
C) engineer's sketches
D) engineering drawings
Question
The first drawing in a set of poured-in-place concrete plans is the____.

A) foundation plan
B) footing plan
C) base plan
D) structure plan
Question
____ are used on poured-in-place concrete drawings as a part of a numbering system that relates the component number and indicates where the component fits into the overall job.

A) Mark numbers
B) Stock numbers
C) Legend numbers
D) Product ID numbers
Question
Used within poured-in-place concrete structures, ____ are used to brace tall structures against lateral loading from wind and swaying motions.

A) security walls
B) shear walls
C) tilt-up walls
D) retaining walls
Question
Commonly used as exterior walls of a structure, ____ are poured into forms that have been built at the jobsite, but they are not in place.

A) security walls
B) shear walls
C) tilt-up walls
D) retaining walls
Question
In a slab designation 3S4, the number 3 represents the ____.

A) slab number
B) slab depth
C) slab breadth
D) floor number
Question
A commonly used floor system in poured-in-place concrete, the ____ combines a thinner slab with concurrently poured joists or ribs to create a floor system very similar to a precast concrete double-tee system.

A) one-way ribbed system
B) one-way solid slab-and-beam system
C) two-way solid slab-and-beam floor system
D) two-way flat-plate floor system
Question
The ____ used with poured- in-place concrete floor systems consist of a plan view of the floor, sections, slab schedules, and notes.

A) engineering drawings
B) slab drawings
C) placing drawings
D) floor grid drawings
Question
The ____ is a poured-in-place concrete floor system consisting of a thick slab with a series of geometric recesses formed into it.

A) waffle-slab floor system
B) joist slab system
C) one-way ribbed system
D) two-way flat-plate floor system
Question
Name the two classifications of poured-in-place concrete floor systems.
Question
Stairs provide easy access between the floors of a building; one type, ____, have two turns and two landings.

A) straight stairs
B) L-shaped stairs
C) double-L stairs
D) U-shaped stairs
Question
The absence of beams and girders and the flat floor make the ____ an ideal poured-in-place concrete floor system in applications where headroom is a problem.

A) waffle-slab system
B) joist slab system
C) one-way ribbed system
D) two-way flat-plate floor system
Question
The ____ used with poured- in-place concrete floor systems contain a plan view of the floor, sections showing precise placement of the reinforcement bars, a slab schedule, and a bar details schedule

A) engineering drawings
B) slab drawings
C) placing drawings
D) floor grid drawings
Question
In stair design, all ____ are the same height.

A) verticals
B) risers
C) treads
D) spans
Question
One of the most commonly used floor systems in poured-in-place concrete is the ____, which consists of a 4" to 6" thick slab of concrete supported by parallel beams or walls.

A) one-way ribbed system
B) one-way solid slab-and-beam system
C) two-way solid slab-and-beam floor system
D) joist slab system
Question
In a ____, lateral stability may be increased by adding bridging at intervals between the joists or ribs.

A) one-way ribbed system
B) one-way solid slab-and-beam system
C) two-way solid slab-and-beam floor system
D) two-way flat-plate floor system
Question
A commonly used floor system in poured-in-place concrete, the ____ has beams running in two directions and is reinforced in two directions.

A) joist slab system
B) waffle-slab system
C) two-way solid slab-and-beam floor system
D) two-way flat-plate floor system
Question
____ are slightly sloped passages that serve the same purpose as stairs in that they provide access from one elevation in a building to another.

A) Ramps
B) Upgrades
C) Inclines
D) Gradients
Question
One critical dimension required in designing stairs, ____, is the distance from one floor to the next or, in other words, the height that the stairs must span.

A) total rise
B) x-distance
C) stair elevation
D) floor span
Question
What is the computational connection between risers and treads?

A) The number of treads is independent of the number of risers.
B) The number of risers and treads is equal.
C) There are twice as many risers as treads.
D) The number of risers is one more than the number of treads.
Question
In stair design, all ____ are the same width.

A) verticals
B) risers
C) treads
D) spans
Question
Stairs provide easy access between the floors of a building; one type, ____, have one 90-degree turn between elevations and the two sides pf the L are connected by a landing.

A) straight stairs
B) L-shaped stairs
C) double-L stairs
D) U-shaped stairs
Question
Stairs provide easy access between the floors of a building; one type, ____, run straight from one elevation to the next with no turns.

A) straight stairs
B) L-shaped stairs
C) double-L stairs
D) U-shaped stairs
Question
Stairs provide easy access between the floors of a building; one type, ____, traverse part of the distance between floors, usually half, in one direction and traverse the remaining distance in the opposite direction.

A) straight stairs
B) L-shaped stairs
C) double-L stairs
D) U-shaped stairs
Question
One critical dimension required in designing stairs, ____, is the horizontal distance the stairs cover.

A) total run
B) stair length
C) stair span
D) total stretch
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/40
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 2: Structural Poured-In-Place Concrete
1
____, such as those used to show bending information for all reinforcing bars used in the job, are an important part of the drawings used in poured-in-place concrete drawings.

A) Specification details
B) Schedules
C) Provisional outlines
D) Fabrication requirements
B
2
One type of freestanding, self-supporting wall designed to hold back earth, water, or other material, ____ are very heavy, poured-in-place concrete walls usually restricted to applications requiring less than six feet of height.

A) security walls
B) shear walls
C) cantilever walls
D) gravity walls
D
3
Briefly describe the three steps involved with poured-in-place concrete construction.
Poured-in-place concrete construction involves the following:
1. Building forms in place at the jobsite
2. Placing steel reinforcing bars into the forms
3. Pouring concrete into the forms around the reinforcing bars
4
One type of column used in poured-in-place concrete construction is a ____. These columns are reinforced with long, straight reinforcing bars surrounded by spiral wire or reinforcing bars.

A) tied column
B) spiral column
C) spliced column
D) rectangular column
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
5
In what types of applications are cantilever walls more appropriate than other types of walls?
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
6
The American Concrete Institute (ACI) standard sheet layout ____.

A) specifies the information that must be included on poured-in-place concrete drawings
B) specifies the size of sheet that must be used for poured-in-place concrete drawings
C) dictates the scale that must be used for all poured-in-place concrete drawings
D) is followed by many companies but can be modified to accommodate individual company preferences
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
7
Poured-in-place concrete differs from ____ that is poured into forms at a manufacturing plant and then shipped to the jobsite and erected in piece.

A) precast concrete
B) molded concrete
C) ready-made concrete
D) prefabricated concrete
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
8
Prepared from engineering drawings and sketches and specifications provided by engineers, ____ contain: plan views, sections and/or details, schedules, bending details, and notes.

A) working drawings
B) concrete structure drawings
C) wall-column drawings
D) placing drawings
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
9
One type of column used in poured-in-place concrete construction is a ____. These columns are reinforced with long, straight reinforcing bars tied off with wire ties or smaller, bent reinforcing bars.

A) tied column
B) spiral column
C) spliced column
D) rectangular column
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
10
As a typical example of a bar mark number assigned to a reinforcing bar shown on poured-in-place concrete drawings, 4A1 indicates ____.

A) a quantity of 4, bar type A, and length 1, where 1 is matched to the general legend for the drawings
B) a number 4 bar, type A, and quantity of 1 for this bar needed in the job
C) a number 4 bar, type A, and it is the first length of bar used in the job
D) the code for a particular bar type that is specified in the general legend for the drawings
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
11
A ____ is a freestanding, self-supporting wall designed to hold back earth, water, or other material.

A) security wall
B) shear wall
C) tilt-up wall
D) retaining wall
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
12
____ prepare engineering drawings of column layouts and wall systems from sketches and specifications supplied by structural engineers or architects.

A) CAD technicians
B) CAD managers
C) Junior architects
D) Drafting clerks
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
13
Used within poured-in-place concrete structures, common applications of ____ are to provide security from fire, break-ins, or noise.

A) security walls
B) shear walls
C) tilt-up walls
D) retaining walls
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
14
____ are used for fabricating the structural members for a job and ordering the materials necessary to do a job.

A) Shop drawings
B) Placing drawings
C) Engineer's sketches
D) Engineering drawings
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
15
One of the two types of poured-in-place concrete drawings, ____ show the general layout of the structure, size and spacing of structural components (foundations, walls, beams, columns, etc.), and various notes containing information helpful to the reader in understanding the drawings.

A) shop drawings
B) placing drawings
C) engineer's sketches
D) engineering drawings
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
16
One of the two types of poured-in-place concrete drawings, ____ are more detailed, showing the actual size, shape, and locations of all reinforcing bars in a structural member and how the bars are to be placed into the forms.

A) shop drawings
B) placing drawings
C) engineer's sketches
D) engineering drawings
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
17
The first drawing in a set of poured-in-place concrete plans is the____.

A) foundation plan
B) footing plan
C) base plan
D) structure plan
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
18
____ are used on poured-in-place concrete drawings as a part of a numbering system that relates the component number and indicates where the component fits into the overall job.

A) Mark numbers
B) Stock numbers
C) Legend numbers
D) Product ID numbers
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
19
Used within poured-in-place concrete structures, ____ are used to brace tall structures against lateral loading from wind and swaying motions.

A) security walls
B) shear walls
C) tilt-up walls
D) retaining walls
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
20
Commonly used as exterior walls of a structure, ____ are poured into forms that have been built at the jobsite, but they are not in place.

A) security walls
B) shear walls
C) tilt-up walls
D) retaining walls
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
21
In a slab designation 3S4, the number 3 represents the ____.

A) slab number
B) slab depth
C) slab breadth
D) floor number
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
22
A commonly used floor system in poured-in-place concrete, the ____ combines a thinner slab with concurrently poured joists or ribs to create a floor system very similar to a precast concrete double-tee system.

A) one-way ribbed system
B) one-way solid slab-and-beam system
C) two-way solid slab-and-beam floor system
D) two-way flat-plate floor system
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
23
The ____ used with poured- in-place concrete floor systems consist of a plan view of the floor, sections, slab schedules, and notes.

A) engineering drawings
B) slab drawings
C) placing drawings
D) floor grid drawings
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
24
The ____ is a poured-in-place concrete floor system consisting of a thick slab with a series of geometric recesses formed into it.

A) waffle-slab floor system
B) joist slab system
C) one-way ribbed system
D) two-way flat-plate floor system
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
25
Name the two classifications of poured-in-place concrete floor systems.
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
26
Stairs provide easy access between the floors of a building; one type, ____, have two turns and two landings.

A) straight stairs
B) L-shaped stairs
C) double-L stairs
D) U-shaped stairs
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
27
The absence of beams and girders and the flat floor make the ____ an ideal poured-in-place concrete floor system in applications where headroom is a problem.

A) waffle-slab system
B) joist slab system
C) one-way ribbed system
D) two-way flat-plate floor system
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
28
The ____ used with poured- in-place concrete floor systems contain a plan view of the floor, sections showing precise placement of the reinforcement bars, a slab schedule, and a bar details schedule

A) engineering drawings
B) slab drawings
C) placing drawings
D) floor grid drawings
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
29
In stair design, all ____ are the same height.

A) verticals
B) risers
C) treads
D) spans
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
30
One of the most commonly used floor systems in poured-in-place concrete is the ____, which consists of a 4" to 6" thick slab of concrete supported by parallel beams or walls.

A) one-way ribbed system
B) one-way solid slab-and-beam system
C) two-way solid slab-and-beam floor system
D) joist slab system
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
31
In a ____, lateral stability may be increased by adding bridging at intervals between the joists or ribs.

A) one-way ribbed system
B) one-way solid slab-and-beam system
C) two-way solid slab-and-beam floor system
D) two-way flat-plate floor system
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
32
A commonly used floor system in poured-in-place concrete, the ____ has beams running in two directions and is reinforced in two directions.

A) joist slab system
B) waffle-slab system
C) two-way solid slab-and-beam floor system
D) two-way flat-plate floor system
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
33
____ are slightly sloped passages that serve the same purpose as stairs in that they provide access from one elevation in a building to another.

A) Ramps
B) Upgrades
C) Inclines
D) Gradients
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
34
One critical dimension required in designing stairs, ____, is the distance from one floor to the next or, in other words, the height that the stairs must span.

A) total rise
B) x-distance
C) stair elevation
D) floor span
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
35
What is the computational connection between risers and treads?

A) The number of treads is independent of the number of risers.
B) The number of risers and treads is equal.
C) There are twice as many risers as treads.
D) The number of risers is one more than the number of treads.
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
36
In stair design, all ____ are the same width.

A) verticals
B) risers
C) treads
D) spans
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
37
Stairs provide easy access between the floors of a building; one type, ____, have one 90-degree turn between elevations and the two sides pf the L are connected by a landing.

A) straight stairs
B) L-shaped stairs
C) double-L stairs
D) U-shaped stairs
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
38
Stairs provide easy access between the floors of a building; one type, ____, run straight from one elevation to the next with no turns.

A) straight stairs
B) L-shaped stairs
C) double-L stairs
D) U-shaped stairs
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
39
Stairs provide easy access between the floors of a building; one type, ____, traverse part of the distance between floors, usually half, in one direction and traverse the remaining distance in the opposite direction.

A) straight stairs
B) L-shaped stairs
C) double-L stairs
D) U-shaped stairs
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
40
One critical dimension required in designing stairs, ____, is the horizontal distance the stairs cover.

A) total run
B) stair length
C) stair span
D) total stretch
Unlock Deck
Unlock for access to all 40 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 40 flashcards in this deck.