Deck 2: Exploring Residential Design and Professional Office Practice

Full screen (f)
exit full mode
Question
The complexity of the residence determines which _____ are required.

A) bubble drawings
B) BIM drawings
C) working drawings
D) preliminary drawings
Use Space or
up arrow
down arrow
to flip the card.
Question
What are presentation boards used for?

A) displaying the initial working drawings
B) displaying the final drawings
C) explaining how large pieces of heirloom furniture will be displayed
D) presenting fabric samples for wall finishes and furniture
Question
Who usually obtains the necessary building permits?

A) owner or contractor
B) junior or senior CAD technician
C) designer or project manager
D) building inspector or job supervisor
Question
When placing furniture outlines to determine the amount of space in a room, you should use _____ from AutoCAD's DesignCenter.

A) viewport
B) blocks
C) purge
D) pan
Question
What term refers to freehand sketches used to help determine room locations and relationships?

A) working drawings
B) preliminary drawings
C) BIM drawings
D) bubble drawings
Question
Which type of lender often requires extra forms, drawings, and specifications that must be taken into account in the initial design stages?

A) credit union
B) corporate bank
C) private mortgage company
D) Federal Housing Administration (FHA)
Question
Drawing fees are generally charged per hour, price per square foot construction, a percentage of construction cost, or a combination of these methods.
Question
Who usually completes the foundation drawing?

A) junior CAD technician
B) senior CAD technician
C) designer
D) project manager
Question
Which stage of the design process comes next after the initial working drawings?

A) final design considerations
B) preliminary design studies
C) permit procedures
D) room planning
Question
A single construction permit usually covers all aspects of construction, including structural, mechanical, plumbing, and electrical work.
Question
Most houses are designed for one specific family.
Question
Basic materials will typically account for approximately _____ percent of the project cost.

A) 20
B) 35
C) 50
D) 65
Question
As a CAD technician, visiting construction sites of projects that you've worked on can be helpful in advancing in the office.
Question
Who should you should always check in with before entering a job site?

A) project manager
B) construction supervisor
C) building inspector
D) senior CAD technician
Question
The exact sizes of beams and other structural material are typically determined before the initial working drawings are prepared.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 2: Exploring Residential Design and Professional Office Practice
1
The complexity of the residence determines which _____ are required.

A) bubble drawings
B) BIM drawings
C) working drawings
D) preliminary drawings
C
2
What are presentation boards used for?

A) displaying the initial working drawings
B) displaying the final drawings
C) explaining how large pieces of heirloom furniture will be displayed
D) presenting fabric samples for wall finishes and furniture
D
3
Who usually obtains the necessary building permits?

A) owner or contractor
B) junior or senior CAD technician
C) designer or project manager
D) building inspector or job supervisor
A
4
When placing furniture outlines to determine the amount of space in a room, you should use _____ from AutoCAD's DesignCenter.

A) viewport
B) blocks
C) purge
D) pan
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
5
What term refers to freehand sketches used to help determine room locations and relationships?

A) working drawings
B) preliminary drawings
C) BIM drawings
D) bubble drawings
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
6
Which type of lender often requires extra forms, drawings, and specifications that must be taken into account in the initial design stages?

A) credit union
B) corporate bank
C) private mortgage company
D) Federal Housing Administration (FHA)
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
7
Drawing fees are generally charged per hour, price per square foot construction, a percentage of construction cost, or a combination of these methods.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
8
Who usually completes the foundation drawing?

A) junior CAD technician
B) senior CAD technician
C) designer
D) project manager
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
9
Which stage of the design process comes next after the initial working drawings?

A) final design considerations
B) preliminary design studies
C) permit procedures
D) room planning
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
10
A single construction permit usually covers all aspects of construction, including structural, mechanical, plumbing, and electrical work.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
11
Most houses are designed for one specific family.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
12
Basic materials will typically account for approximately _____ percent of the project cost.

A) 20
B) 35
C) 50
D) 65
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
13
As a CAD technician, visiting construction sites of projects that you've worked on can be helpful in advancing in the office.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
14
Who should you should always check in with before entering a job site?

A) project manager
B) construction supervisor
C) building inspector
D) senior CAD technician
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
15
The exact sizes of beams and other structural material are typically determined before the initial working drawings are prepared.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 15 flashcards in this deck.