Deck 27: Ductwork Plans
1
The metal takeoff shows a total of 2000 pounds with a waste factor of 30% gives you a total of metal need of __________ pounds.
A) 2000
B) 600
C) 2300
D) 2600
A) 2000
B) 600
C) 2300
D) 2600
D
2
The three kinds of material used for fabricating ductwork are _________, ___________, and __________.
sheet metal, ductboard, and flexible
3
The process for the linear takeoff of duct insulation is the same to the ductwork takeoff of sheet metal.
True
4
The three differant types od duct work insulation is ________, ___________, and __________.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
5
The gauge metal to use is determined by the __________ dimension of the rectangular duct size.
A) smaller
B) smaller+larger
C) cross section
D) larger
A) smaller
B) smaller+larger
C) cross section
D) larger
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
6
The labor cost factor for should be poundage of metal times the labor cost factor. If you have 2600 pounds of metal x $1.10 per pound gives us a labor cost of __________.
A) $2610.00
B) $1100.00
C) $2860.00
D) $2601.10
A) $2610.00
B) $1100.00
C) $2860.00
D) $2601.10
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
7
When ductwork fittings are fafricated, there is more waste with fittings than straignt duct.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
8
The labor cost for installing the ductwork insulation is determined by ___________.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
9
Ductwork insulation takeoff procedures are the same regarardless of the _______ or ______ of insulation.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
10
If the duct size changes in a fitting, one linear measurment across the fitting is made using one duct dimension and the second measurment across the fitting mde using the other duct dimension.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
11
The percentage of waste factor and labor cost for fabrication varies from shop to shop.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
12
The cost of fabfication and installation of the ductwork can be determined by multiplying the ____________ times the labor cost for fabrication and installation.
A) total width
B) total weight
C) total length
D) size
A) total width
B) total weight
C) total length
D) size
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
13
The ductwork takeoff person must have a ________ that keep up with duct takeoff and facilitates tabulation of the total weight of metal needed to fabricate the ductwork.
A) form
B) pad
C) chart
D) technician
A) form
B) pad
C) chart
D) technician
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
14
For the majority of air -conditioning and heating jobs, ductwork is not included as part of the installation.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
15
The kind of ductwork is noted and described on the plans and __________.