Deck 20: Value at Risk

Full screen (f)
exit full mode
Question
Which was the minimum capital requirement for market risk in the 1996 BIS Amendment?

A)At least 3 times the 10-day VaR with a 99% confidence level
B)At least 3 times 7-day VaR with a 97% confidence level
C)At least 2 times 5-day VaR with a 95% confidence level
D)1-day VaR with a 99% confidence level
Use Space or
up arrow
down arrow
to flip the card.
Question
The gain from a project is equally likely to have any value between -$0.15 million and +$0.85 million.What is the 99% value at risk?

A)$0.145 million
B)$0.14 million
C)$0.13 million
D)$0.10 million
Question
At the end of Thursday,the estimated volatility of asset B is 1% per day.During Friday asset B produces a return of zero.An EWMA model with lambda equal to 0.9 is used.What is an estimate of the volatility of asset A at the end of Friday?

A)0)98%
B)0)95%
C)0)92%
D)0)90%
Question
What does EWMA stand for?

A)Equally weighted moving average
B)Equally weighted median approximation
C)Exponentially weighted moving average
D)Exponentially weighted median average
Question
Which of the following is a definition of the covariance between X and Y?

A)Correlation between X and Y times variance of X times variance of Y
B)Variance of X times the variance of Y
C)Correlation between X and Y divided by the product of the standard deviation of X and the standard deviation of Y
D)Correlation between X and Y times standard deviation of X times standard deviation of Y
Question
Which of the following is true?

A)Cash flow mapping is a way of calculating the present value of cash flows
B)Cash flow mapping is used to handle interest rate exposures in the model building approach
C)Cash flow mapping is used to handle interest rate exposures in the historical simulation approach
D)None of the above
Question
What is the method of testing how often a VaR with a certain confidence level was exceeded in the past called?

A)Stress testing
B)Backtesting
C)EWMA
D)The model-building approach
Question
Which of the following is true of the historical simulation method for calculating VaR?

A)It fits historical data on the behavior of variables to a normal distribution
B)It fits historical data on the behavior of variables to a lognormal distribution
C)It assumes that what will happen in the future is a random sample from what has happened in the past
D)It uses Monte Carlo simulation to create random future scenarios
Question
The 10-day VaR is often assumed to be which of the following?

A)The 1-day VaR multiplied by 10
B)The 1-day VaR multiplied by the square root of 10
C)The 1-day VaR divided by 10
D)The 1-day VaR divided by the square root of 10
Question
Which of the following describes stressed VaR?

A)It is based on movements in market variables in stressed market conditions
B)It is VaR with a very high confidence level
C)It is VaR multiplied by a factor of 3
D)None of the above
Question
Which of the following is true when lambda equals 0.95?

A)The weight given to the most recent observation is 0.95
B)The weight given to the observation one day ago is 95% of the weight given to the observation two days ago
C)The weights given to observations add up to 0.95
D)The weights given to the observation two days ago is 95% of the weight given to the observation one day ago
Question
Which of the following is true of a covariance matrix?

A)The numbers on the diagonal are variances
B)The numbers on the diagonal are standard deviations
C)The numbers on the diagonal are all one
D)The numbers on the diagonal are all zero
Question
If the volatility for a portfolio is 20% per year,what is the volatility per quarter?

A)20%
B)10%
C)5%
D)2%
Question
Which of the following is true?

A)The quadratic model approximates daily changes in using delta and gamma
B)The quadratic model approximates daily changes using delta.but not gamma
C)The quadratic model approximates daily changes using gamma.but not delta
D)None of the above
Question
The gain from a project is equally likely to have any value between -$0.15 million and +$0.85 million.What is the 99% expected shortfall?

A)$0.145 million
B)$0.14 million
C)$0.13 million
D)$0.10 million
Question
Which of the following is true when delta,but not gamma,is used in calculating VaR for option positions?

A)VaR for a long call is too low and VaR for a long put is too low
B)VaR for a long call is too low and VaR for a long put is too high
C)VaR for a long call is too high and VaR for a long put is too low
D)VaR for a long call is too high and VaR for a long put is too high
Question
At the end of Thursday,the estimated covariance between assets A and B is 0.0001.During Friday asset A produces a return of 3% and asset B produces a return of zero.An EWMA model with lambda equal to 0.9 is used.What is an estimate of the covariance at the end of Friday?

A)0)000090
B)0)000081
C)0)000100
D)0)000095
Question
An investor has $2,000 invested in stock A and $5,000 in stock B.The daily volatilities of A and B are 1.5% and 1% respectively and the coefficient of correlation is 0.8.What is the one day 99% VaR? (Note that N(-2.33)=0.01)

A)$177
B)$135
C)$215
D)$331
Question
Which of the following is true of the 99.9% value at risk?

A)There is 1 chance in 10 that the loss will be greater than the value of risk
B)There is 1 chance in 100 that the loss will be greater than the value of risk
C)There is 1 chance in 1000 that the loss will be greater than the value of risk
D)None of the above
Question
At the end of Thursday,the estimated volatility of asset A is 2% per day.During Friday asset A produces a return of 3%.An EWMA model with lambda equal to 0.9 is used.What is an estimate of the volatility of asset A at the end of Friday?

A)2)08%
B)2)10%
C)2)12%
D)2)14%
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 20: Value at Risk
1
Which was the minimum capital requirement for market risk in the 1996 BIS Amendment?

A)At least 3 times the 10-day VaR with a 99% confidence level
B)At least 3 times 7-day VaR with a 97% confidence level
C)At least 2 times 5-day VaR with a 95% confidence level
D)1-day VaR with a 99% confidence level
A
2
The gain from a project is equally likely to have any value between -$0.15 million and +$0.85 million.What is the 99% value at risk?

A)$0.145 million
B)$0.14 million
C)$0.13 million
D)$0.10 million
B
3
At the end of Thursday,the estimated volatility of asset B is 1% per day.During Friday asset B produces a return of zero.An EWMA model with lambda equal to 0.9 is used.What is an estimate of the volatility of asset A at the end of Friday?

A)0)98%
B)0)95%
C)0)92%
D)0)90%
B
4
What does EWMA stand for?

A)Equally weighted moving average
B)Equally weighted median approximation
C)Exponentially weighted moving average
D)Exponentially weighted median average
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
Which of the following is a definition of the covariance between X and Y?

A)Correlation between X and Y times variance of X times variance of Y
B)Variance of X times the variance of Y
C)Correlation between X and Y divided by the product of the standard deviation of X and the standard deviation of Y
D)Correlation between X and Y times standard deviation of X times standard deviation of Y
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
Which of the following is true?

A)Cash flow mapping is a way of calculating the present value of cash flows
B)Cash flow mapping is used to handle interest rate exposures in the model building approach
C)Cash flow mapping is used to handle interest rate exposures in the historical simulation approach
D)None of the above
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
What is the method of testing how often a VaR with a certain confidence level was exceeded in the past called?

A)Stress testing
B)Backtesting
C)EWMA
D)The model-building approach
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
Which of the following is true of the historical simulation method for calculating VaR?

A)It fits historical data on the behavior of variables to a normal distribution
B)It fits historical data on the behavior of variables to a lognormal distribution
C)It assumes that what will happen in the future is a random sample from what has happened in the past
D)It uses Monte Carlo simulation to create random future scenarios
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
The 10-day VaR is often assumed to be which of the following?

A)The 1-day VaR multiplied by 10
B)The 1-day VaR multiplied by the square root of 10
C)The 1-day VaR divided by 10
D)The 1-day VaR divided by the square root of 10
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
Which of the following describes stressed VaR?

A)It is based on movements in market variables in stressed market conditions
B)It is VaR with a very high confidence level
C)It is VaR multiplied by a factor of 3
D)None of the above
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following is true when lambda equals 0.95?

A)The weight given to the most recent observation is 0.95
B)The weight given to the observation one day ago is 95% of the weight given to the observation two days ago
C)The weights given to observations add up to 0.95
D)The weights given to the observation two days ago is 95% of the weight given to the observation one day ago
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following is true of a covariance matrix?

A)The numbers on the diagonal are variances
B)The numbers on the diagonal are standard deviations
C)The numbers on the diagonal are all one
D)The numbers on the diagonal are all zero
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
If the volatility for a portfolio is 20% per year,what is the volatility per quarter?

A)20%
B)10%
C)5%
D)2%
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
Which of the following is true?

A)The quadratic model approximates daily changes in using delta and gamma
B)The quadratic model approximates daily changes using delta.but not gamma
C)The quadratic model approximates daily changes using gamma.but not delta
D)None of the above
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
The gain from a project is equally likely to have any value between -$0.15 million and +$0.85 million.What is the 99% expected shortfall?

A)$0.145 million
B)$0.14 million
C)$0.13 million
D)$0.10 million
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
Which of the following is true when delta,but not gamma,is used in calculating VaR for option positions?

A)VaR for a long call is too low and VaR for a long put is too low
B)VaR for a long call is too low and VaR for a long put is too high
C)VaR for a long call is too high and VaR for a long put is too low
D)VaR for a long call is too high and VaR for a long put is too high
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
At the end of Thursday,the estimated covariance between assets A and B is 0.0001.During Friday asset A produces a return of 3% and asset B produces a return of zero.An EWMA model with lambda equal to 0.9 is used.What is an estimate of the covariance at the end of Friday?

A)0)000090
B)0)000081
C)0)000100
D)0)000095
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
An investor has $2,000 invested in stock A and $5,000 in stock B.The daily volatilities of A and B are 1.5% and 1% respectively and the coefficient of correlation is 0.8.What is the one day 99% VaR? (Note that N(-2.33)=0.01)

A)$177
B)$135
C)$215
D)$331
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
Which of the following is true of the 99.9% value at risk?

A)There is 1 chance in 10 that the loss will be greater than the value of risk
B)There is 1 chance in 100 that the loss will be greater than the value of risk
C)There is 1 chance in 1000 that the loss will be greater than the value of risk
D)None of the above
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
At the end of Thursday,the estimated volatility of asset A is 2% per day.During Friday asset A produces a return of 3%.An EWMA model with lambda equal to 0.9 is used.What is an estimate of the volatility of asset A at the end of Friday?

A)2)08%
B)2)10%
C)2)12%
D)2)14%
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 20 flashcards in this deck.