Deck 3: Contract Pricing and Costing Methods

Full screen (f)
exit full mode
Question
Provision for increase in the contract price to accommodate increase in material and labour cost

A)De escalation clause
B)fluctuating price
C)Fixed price
D)Escalation price
Use Space or
up arrow
down arrow
to flip the card.
Question
A contract in which the contractor is given the lost of work done plus a certain percentage for profit is called …………………….

A)Cost plus contract
B)Sub contract
C)Fixed price contract
D)none of these
Question
The person who gives the work on contract is known as ……

A)Contractor
B)contractee
C)Sub contraction
D)sub contractee
Question
……….. is the portion of work certified not paid by the contractee till completion of the work

A)Work certified
B)Uncertified
C)Retention money
D)notional profit
Question
The work in the process of completion is known as …………….

A)Work certified
B)work in progress
C)Work un certified
D)notional profit
Question
…………….. is the provision to increase the contract price increase in the Cost of construction over a particular level

A)Escalation clause
B)Desecration clause
C)Retention money
D)work certified
Question
Estimated profit on incomplete contract can also be called as ,……………..

A)Net profit
B)notional profit
C)Work in progress
D)net loss
Question
A contract in which the price is fixed in advance is a ………….. contract

A)Sub contract
B)fixed price contract
C)Cost plus contract
D)Fixed cost with Escalation clause
Question
A portion of the contact entrusted to somebody else is known as ……………..

A)Extra work
B)Sub contract
C)Cost plus contract
D)fixed price contract
Question
A method of costing applied where costs are collected and accumulated for each work order is ………………….

A)Process a/c
B)contract costing
C)Operating costing
D)job costing
Question
The method of costing applied when articles are manufactured in definite batches is ………………………….

A)Job costing
B)operation costing
C)Batch costing
D)service costing
Question
The number of units to be manufactured in one batch

A)Economic order Quantity
B)Economic Quantity
C)Economic batch Quantity
D)ordering unit
Question
The method of job costing is applied

A)Biscuit manufacturing
B)oil refining
C)Medicine manufacturing
D)Engineering work shop
Question
The method of batch costing is used in …………………

A)Manufacture of agriculture product
B)construction of building
C)Manufacturing medicines
D)processing of oil
Question
Job costing is ………………………….

A)Method of costing
B)technique of costing
C)Cost ascertainment
D)cost estimation
Question
The method of costing applied in lathe is ………………….

A)Process costing
B)marginal costing
C)Absorption costing
D)job costing
Question
The method of costing applied in cycle parts manufacturing is ………..

A)Job costing
B)process costing
C)Batch costing
D)contract costing
Question
Job costing is applied when the product are of …………… nature

A)Similar
B)Dissimilar
C)Non separable
D)none of these
Question
Job costing can also be called as ……………….. costing

A)Specific order costing
B)batch costing
C)Transport costing
D)Farm costing
Question
For each job a …………………. Is given under job costing

A)Distinct number
B)Equal number
C)Coding
D)None of these
Question
In ……………… costing production is always made for stock

A)Job costing
B)batch costing
C)Process costing
D)contract costing
Question
Cost of product in each stage is calculated in ………. Costing

A)Contract costing
B)marginal costing
C)Multiple costing
D)process costing
Question
Un avoidable loss inherent in the material

A)Normal los
B)abnormal loss
C)Accidental loss
D)spoilage
Question
Incidental residue from manufacture with recoverable value

A)Scrap
B)spoilage
C)Defective
D)loss
Question
………….. product are produced incidental to the main product

A)Joint product
B)By product
C)Co - product
D)none of these
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/25
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 3: Contract Pricing and Costing Methods
1
Provision for increase in the contract price to accommodate increase in material and labour cost

A)De escalation clause
B)fluctuating price
C)Fixed price
D)Escalation price
Escalation price
2
A contract in which the contractor is given the lost of work done plus a certain percentage for profit is called …………………….

A)Cost plus contract
B)Sub contract
C)Fixed price contract
D)none of these
Cost plus contract
3
The person who gives the work on contract is known as ……

A)Contractor
B)contractee
C)Sub contraction
D)sub contractee
contractee
4
……….. is the portion of work certified not paid by the contractee till completion of the work

A)Work certified
B)Uncertified
C)Retention money
D)notional profit
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
5
The work in the process of completion is known as …………….

A)Work certified
B)work in progress
C)Work un certified
D)notional profit
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
6
…………….. is the provision to increase the contract price increase in the Cost of construction over a particular level

A)Escalation clause
B)Desecration clause
C)Retention money
D)work certified
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
7
Estimated profit on incomplete contract can also be called as ,……………..

A)Net profit
B)notional profit
C)Work in progress
D)net loss
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
8
A contract in which the price is fixed in advance is a ………….. contract

A)Sub contract
B)fixed price contract
C)Cost plus contract
D)Fixed cost with Escalation clause
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
9
A portion of the contact entrusted to somebody else is known as ……………..

A)Extra work
B)Sub contract
C)Cost plus contract
D)fixed price contract
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
10
A method of costing applied where costs are collected and accumulated for each work order is ………………….

A)Process a/c
B)contract costing
C)Operating costing
D)job costing
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
11
The method of costing applied when articles are manufactured in definite batches is ………………………….

A)Job costing
B)operation costing
C)Batch costing
D)service costing
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
12
The number of units to be manufactured in one batch

A)Economic order Quantity
B)Economic Quantity
C)Economic batch Quantity
D)ordering unit
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
13
The method of job costing is applied

A)Biscuit manufacturing
B)oil refining
C)Medicine manufacturing
D)Engineering work shop
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
14
The method of batch costing is used in …………………

A)Manufacture of agriculture product
B)construction of building
C)Manufacturing medicines
D)processing of oil
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
15
Job costing is ………………………….

A)Method of costing
B)technique of costing
C)Cost ascertainment
D)cost estimation
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
16
The method of costing applied in lathe is ………………….

A)Process costing
B)marginal costing
C)Absorption costing
D)job costing
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
17
The method of costing applied in cycle parts manufacturing is ………..

A)Job costing
B)process costing
C)Batch costing
D)contract costing
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
18
Job costing is applied when the product are of …………… nature

A)Similar
B)Dissimilar
C)Non separable
D)none of these
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
19
Job costing can also be called as ……………….. costing

A)Specific order costing
B)batch costing
C)Transport costing
D)Farm costing
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
20
For each job a …………………. Is given under job costing

A)Distinct number
B)Equal number
C)Coding
D)None of these
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
21
In ……………… costing production is always made for stock

A)Job costing
B)batch costing
C)Process costing
D)contract costing
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
22
Cost of product in each stage is calculated in ………. Costing

A)Contract costing
B)marginal costing
C)Multiple costing
D)process costing
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
23
Un avoidable loss inherent in the material

A)Normal los
B)abnormal loss
C)Accidental loss
D)spoilage
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
24
Incidental residue from manufacture with recoverable value

A)Scrap
B)spoilage
C)Defective
D)loss
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
25
………….. product are produced incidental to the main product

A)Joint product
B)By product
C)Co - product
D)none of these
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 25 flashcards in this deck.