Deck 7: Operations and Quality Management

Full screen (f)
exit full mode
Question
Capacity decisions have a direct influence on performance of production system in respect of ________

A)delivery performance
B)quality control
C)plant size
D)manpower
Use Space or
up arrow
down arrow
to flip the card.
Question
Productivity tends to be more difficult to improve in the service sector because the work is _________________.

A)often difficult to automate .
B)typically labor intensive .
C)frequently individually processed and customised.
D)often an intellectual task performed by professionals.
Question
________family is primarily concerned with quality management.

A)iso 9004.
B)iso 14000.
C)iso 9000.
D)iso 14001.
Question
Select the odd one which is not the required document for the ISO certificate?

A)quality policy manual.
B)quality system procedures.
C)records.
D)contract review.
Question
_________is carried out to verify whether a quality system is effective and suitable.

A)quality audit.
B)quality assurance audit.
C)quality verification.
D)quality analysis.
Question
Performance appraisal is also known as ______.

A)merit rating.
B)quality rating .
C)credit rating.
D)critical rating.
Question
Select the odd one which is not the dimension of quality?

A)response.
B)reliability.
C)reputation.
D)reassurance.
Question
Supplier rating system is also referred to as a _________used to obtain an over all rating of suppliers performance.

A)score card system.
B)open ended system .
C)credit card system .
D)sub system.
Question
The term muda in TQM refers to ______ classes of waste.

A)six.
B)seven.
C)eight .
D)nine.
Question
RPN in total quality management denotes _______.

A)risk priority number.
B)return priority number.
C)risk preference number.
D)return preference number.
Question
A _____________ is something which is offered to customers to satisfy their needs or wants.

A)process.
B)price.
C)promotion.
D)product.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/11
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 7: Operations and Quality Management
1
Capacity decisions have a direct influence on performance of production system in respect of ________

A)delivery performance
B)quality control
C)plant size
D)manpower
delivery performance
2
Productivity tends to be more difficult to improve in the service sector because the work is _________________.

A)often difficult to automate .
B)typically labor intensive .
C)frequently individually processed and customised.
D)often an intellectual task performed by professionals.
frequently individually processed and customised.
3
________family is primarily concerned with quality management.

A)iso 9004.
B)iso 14000.
C)iso 9000.
D)iso 14001.
iso 9000.
4
Select the odd one which is not the required document for the ISO certificate?

A)quality policy manual.
B)quality system procedures.
C)records.
D)contract review.
Unlock Deck
Unlock for access to all 11 flashcards in this deck.
Unlock Deck
k this deck
5
_________is carried out to verify whether a quality system is effective and suitable.

A)quality audit.
B)quality assurance audit.
C)quality verification.
D)quality analysis.
Unlock Deck
Unlock for access to all 11 flashcards in this deck.
Unlock Deck
k this deck
6
Performance appraisal is also known as ______.

A)merit rating.
B)quality rating .
C)credit rating.
D)critical rating.
Unlock Deck
Unlock for access to all 11 flashcards in this deck.
Unlock Deck
k this deck
7
Select the odd one which is not the dimension of quality?

A)response.
B)reliability.
C)reputation.
D)reassurance.
Unlock Deck
Unlock for access to all 11 flashcards in this deck.
Unlock Deck
k this deck
8
Supplier rating system is also referred to as a _________used to obtain an over all rating of suppliers performance.

A)score card system.
B)open ended system .
C)credit card system .
D)sub system.
Unlock Deck
Unlock for access to all 11 flashcards in this deck.
Unlock Deck
k this deck
9
The term muda in TQM refers to ______ classes of waste.

A)six.
B)seven.
C)eight .
D)nine.
Unlock Deck
Unlock for access to all 11 flashcards in this deck.
Unlock Deck
k this deck
10
RPN in total quality management denotes _______.

A)risk priority number.
B)return priority number.
C)risk preference number.
D)return preference number.
Unlock Deck
Unlock for access to all 11 flashcards in this deck.
Unlock Deck
k this deck
11
A _____________ is something which is offered to customers to satisfy their needs or wants.

A)process.
B)price.
C)promotion.
D)product.
Unlock Deck
Unlock for access to all 11 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 11 flashcards in this deck.