Deck 1: Civil Engineering

Full screen (f)
exit full mode
Question
From which of the following conditions do structural forces originate?
1. Point loads
2. Uniform loads
3. Compression
4. Non-uniformly distributed loads
5. Tension
6. Moments

A)1, 2
B)1, 3, 4
C)2, 4 ,5, 6
D)1, 2, 4, 6
Use Space or
up arrow
down arrow
to flip the card.
Question
What is the degree of saturation of a 600 cm3 soil sample given the following values from its three-phase diagram? Volume of air: 100 cm3; volume of solids: 320 cm3.

A)30%
B)64.3%
C)87.5%
D)Not enough information provided
Question
Which of the following hammers is not commonly used for conducting Standard Penetration Tests (SPTs)?

A)Split-spoon
B)Automatic
C)Donut
D)Safety
Question
Which of the following elements are typically included on the Erosion and Sediment Control Plan of a construction site?

A)Site drawing with existing and proposed conditions
B)Standard details of each erosion and sediment control best management plan (BMP) proposed for use
C)BMP inspection and maintenance schedule
D)All of the above.
Question
What is the velocity (in ft/sec) in a rectangular concrete channel with a width of 3 feet (ft), a hydraulic grade line slope of 0.002 ft/ft, a flow depth of 1.5 ft and an assumed Manning's coefficient n = 0.014?

A)0.15 ft/sec
B)1.50 ft/sec
C)3.92 ft/sec
D)None of the above
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/5
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 1: Civil Engineering
1
From which of the following conditions do structural forces originate?
1. Point loads
2. Uniform loads
3. Compression
4. Non-uniformly distributed loads
5. Tension
6. Moments

A)1, 2
B)1, 3, 4
C)2, 4 ,5, 6
D)1, 2, 4, 6
1, 2, 4, 6
2
What is the degree of saturation of a 600 cm3 soil sample given the following values from its three-phase diagram? Volume of air: 100 cm3; volume of solids: 320 cm3.

A)30%
B)64.3%
C)87.5%
D)Not enough information provided
64.3%
3
Which of the following hammers is not commonly used for conducting Standard Penetration Tests (SPTs)?

A)Split-spoon
B)Automatic
C)Donut
D)Safety
Split-spoon
4
Which of the following elements are typically included on the Erosion and Sediment Control Plan of a construction site?

A)Site drawing with existing and proposed conditions
B)Standard details of each erosion and sediment control best management plan (BMP) proposed for use
C)BMP inspection and maintenance schedule
D)All of the above.
Unlock Deck
Unlock for access to all 5 flashcards in this deck.
Unlock Deck
k this deck
5
What is the velocity (in ft/sec) in a rectangular concrete channel with a width of 3 feet (ft), a hydraulic grade line slope of 0.002 ft/ft, a flow depth of 1.5 ft and an assumed Manning's coefficient n = 0.014?

A)0.15 ft/sec
B)1.50 ft/sec
C)3.92 ft/sec
D)None of the above
Unlock Deck
Unlock for access to all 5 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 5 flashcards in this deck.