Deck 4: Leed

Full screen (f)
exit full mode
Question
The LEED Rating System is the benchmark for the design, construction, and operation of the following high-performance green buildings except:

A)Healthcare facilities
B)Homes
C)Neighborhood construction
D)Retail
Use Space or
up arrow
down arrow
to flip the card.
Question
According to a report to California's Sustainable Building Task Force, a green building has the potential to reduce construction waste on an average of:

A)40%
B)60%
C)70%
D)80%
Question
All but one of the following are considerations that should be taken in evaluating the life-cycle of a building. Which one is not a consideration?

A)Where building materials comes from and where they will go after use
B)What the energy and water sources are
C)How the building users will get to and from the building
D)New and innovative technologies and strategies
Question
The Schematic Design (SD) phase in construction serves which purpose?

A)Explores several design options and alternatives, with the intent to establish an agreed-upon project layout and scope of work
B)Begins the process of spatial refinement and usually involves the first design of a project's energy systems
C)Carries the design into the detail level for all spaces, systems, and materials so that construction can take place
D)Entails gathering information, recognizing stakeholder needs, establishing project goals, and selecting the site
Question
LEED-certified buildings are designed to do all of the following except:

A)Lower operating costs and increase asset value
B)Reduce waste sent to landfills
C)Qualify for tax rebates, zoning allowances, and other incentives in hundreds of cities
D)Promote publicity to announce LEED project registration
Question
All LEED Professional Credentialing exams assess candidates' abilities at the following hierarchical cognitive levels, except:

A)Recognition
B)Quantitative comparison
C)Analysis
D)Application
Question
Life-cycle cost analysis looks at the cost of green building and:

A)The types of advantages that are discovered when investments are made
B)The ways to create more comfortable, healthier, and sustainable built environments
C)The cost of on-site renewable energy source
D)Measures the overall energy reduction
Question
In conventional design and construction processes, project team members:

A)Practice integrated approach
B)Move through each phase independently
C)Move through the schematic design phase independently
D)Move through phases in both the integrated approach and independently
Question
All but one of the following items are included in the Design phase of the construction process. Which one is not included?

A)Predesign
B)Schematic design
C)Design development
D)Construction documents
Question
During the construction administration phase, which one of the following tasks is performed?

A)Commissioning
B)Bidding
C)Construction documents
D)Costs are established
Question
Recommissioning, along with occupant surveying (via a post-occupancy evaluation), is recommended to take place at regular intervals in which phase of the building lifecycle?

A)Occupancy
B)Construction
C)Certificate of occupancy
D)Sale
Question
A project team member is detailing the specifics in planning the air conditioning systems within a building. This project is in the ________ phase of construction.

A)Schematic design
B)Design development
C)Construction documents
D)Construction administration
Question
In a project, the construction documents phase occurs before ______ and after ______.

A)Construction administration; construction
B)Construction; construction administration
C)Construction; bidding
D)Construction administration; schematic design
Question
The sequential order of construction phase is as follows:

A)Design, construction administration, bidding, and occupancy
B)Predesign, design, bidding, construction, and occupancy
C)Predesign, design, construction, construction documents, and construction administration
D)Design, bidding, construction and construction documents, and sale
Question
Which of the following is not part of the design team?

A)Planning staff
B)Architect
C)Day lighting and energy modeler
D)Commissioning authority
Question
Studies indicate that ____% of the decisions associated with environmental impacts are made during the first _____% of the design process:

A)25; 10
B)50; 25
C)70; 10
D)90; 25
Question
What is expected to be the outcome of an integrated design process?

A)Higher first cost and higher operating costs
B)Lower first cost and lower operating costs
C)Higher first cost and lower operating costs
D)Lower first cost and higher operating cots
Question
Studies have demonstrated that ______% or less of the average marginal cost of a building is associated with green buildings.

A)1
B)2
C)4
D)5
Question
What contributes to the largest consumption of energy in buildings in the United States?

A)Water heating
B)Space heating
C)Space cooling
D)Electric lighting
Question
S. Green Building Council emphasizes using which type of design process?

A)Linear
B)Multiple
C)Integrative
D)Tiered
Question
What are the three aspects of sustainability affecting the triple bottom line?

A)Economic theory, cultural agendas, and global sustainability
B)Energy efficiency, water efficiency, and indoor environmental quality
C)Building codes, green practices, and economic theory
D)Economic prosperity, environmental stewardship, and social responsibility
Question
The installation of an electric hand blow dryer in restrooms will result in which of the following?

A)Reduced water use
B)Reduced materials and resources
C)Reduced hours of occupancy
D)Increased productivity
Question
LEED points are weighted based on what?

A)Environmental impact and human benefits
B)Environmental performance and difficulty to achieve each credit
C)Material costs and economic prosperity of each credit
D)Regional priority and health benefits
Question
Which construction phase is the most important in order to incorporate an integrative design approach?

A)Predesign
B)Schematic design
C)Design development
D)Construction documents
Question
Sustainable design is different from regenerative design in that:

A)Sustainable design is referred to as high performance building
B)Sustainable design is a long-term maintenance of the ecosystem components
C)Regenerative design goes beyond reducing negative impact on the environment
D)Regenerative design meets the needs of the present without compromising the ability of future generations to meet their own needs
Question
Carbon footprint is a measure of:

A)Transportation
B)Volatile organic compounds
C)Greenhouse gas emissions
D)Energy use
Question
Which of the following is considered to be biodegradable?

A)Plastics
B)Metals
C)Paper
D)Glass
Question
All of the following are ways of reducing a building's operational carbon footprint except:

A)Improving building insulation
B)Replacing incandescent lights with CFLS
C)Purchasing carbon offsets
D)Providing public transit subsidies for employees
Question
When registering a project to be LEED-certified, one must:

A)Go to www.usgbc.org
B)Go to www.gbci.org
C)Go to www.leedratingsystem.org
D)Go to www.leedonline.org
Question
After having obtained Continuing Education (CE) credits to apply towards your LEED Credential Maintenance Program (CMP), one must submit their hours to:

A)www.usgbc.org
B)www.gbci.org
C)www.leedratingsystem.org
D)www.leedonline.org
Question
To find information on green building research, one should go to:

A)www.usgbc.org
B)www.gbci.org
C)www.leedratingsystem.org
D)www.leedonline.org
Question
After reviewing the LEED Rating System, a project team agrees to reach Platinum level for certification for New Construction and Major Renovations. Out of 100 points, the team expects to obtain 88 points with 40 being prerequisites. How many points are required for the project?

A)40
B)48
C)88
D)100
Question
A project team is working on credits under the Location and Linkages category. Which of the following LEED Rating System are they working on?

A)LEED for Neighborhood Development
B)LEED for Homes
C)LEED for Schools
D)LEED for New Construction
Question
A project team has successfully earned the point for Awareness and Education (AE 2) for Education of Building Manager. Which of the following LEED rating systems are they working on?

A)LEED for Neighborhood Development
B)LEED for Homes
C)LEED for Schools
D)LEED for New Construction
Question
A project team is working on the Smart Location and Linkages applications to determine what the best locations are for the new development that would ensure compact, contiguous buildings with multiple transportation options. The LEED Rating Systems they are working on is:

A)LEED for Neighborhood Development
B)LEED for Homes
C)LEED for Schools
D)LEED for New Construction
Question
The Green Infrastructure and Buildings category promotes the design and construction of buildings and infrastructure that reduce energy and water use, while promoting more sustainable use of materials, reuse of existing and historic structures, and other sustainable best practices. This category in LEED Rating System can be found in:

A)LEED for Neighborhood Development
B)LEED for Homes
C)LEED for Schools
D)LEED for New Construction
Question
Each prerequisite and credit in the LEED 2009 reference guides contains the following components except:

A)Definitions
B)Benefits and issues to consider
C)Implementation
D)Charts and Diagrams
Question
An optional LEED Green Building Rating System component whose achievement results in the earning of points toward certification is called:

A)registration
B)intent
C)credit
D)certification
Question
All of the following statements are true except:

A)all LEED Rating Systems are based on 100 points
B)all LEED credits are worth a minimum of one point
C)all LEED credits are positive and whole numbers
D)all LEED credits receive a single, static weight in each rating system
Question
A project team has earned 65 points with the maximum bonus credits for Innovation in Design for LEED for Schools. Which level of certification has this project reached?

A)Certified
B)Silver
C)Gold
D)Platinum
Question
The Rating System for LEED for Existing Schools is in which Reference Guide?

A)LEED Reference Guide for Green Building Design and Construction
B)LEED Reference Guide for Green Interior Design and Construction
C)LEED Reference Guide for Green Building Operations and Maintenance
D)LEED Reference Guide for Green Neighborhood Development
Question
All Rating Systems must commit to sharing with USGBC and/or GBCI all available actual whole project energy and water usage data for a period of at least __ years:

A)5
B)7
C)9
D)10
Question
This LEED Rating System works hand in hand with the LEED for Core & Shell certification system:

A)LEED for Commercial Interiors
B)LEED for Existing Buildings
C)LEED for Healthcare
D)LEED for New Construction and Major Renovations
Question
Which LEED Rating System addresses issues such as increased sensitivity to chemicals and pollutants, traveling distances from parking facilities, and access to natural spaces?

A)LEED for Neighborhood Development
B)LEED for Healthcare
C)LEED for Schools
D)LEED for New Construction and Major Renovations
Question
Projects involving postsecondary academic buildings or prekindergarten buildings may choose to use either LEED for Schools or:

A)LEED for Neighborhood Development
B)LEED for Homes
C)LEED for Schools
D)LEED for New Construction and Major Renovations
Question
LEED for Retail can be certified along with all of the following except:

A)LEED for New Construction and Major Renovations
B)LEED for Commercial Interiors
C)LEED for Existing Buildings
D)LEED for Core and Shell
Question
Which LEED Rating System is targeted to single buildings?

A)LEED for Existing Buildings
B)LEED for Homes
C)LEED for Schools
D)LEED for Healthcare
Question
The guidance and procedures as well as default figures that must be used for the LEED Core & Shell Rating System include all of the following except:

A)default occupancy counts
B)core & shell day lighting modeling guidelines
C)core & shell project scope
D)tenant lease or sales agreement
Question
One of the team members working on a LEED for Homes project has asked to be provided the status updates and time lines. This team member then was advised to:

A)use LEED Online
B)review the updated checklist
C)contact GBCI
D)contact LEED customer service
Question
Once a project team submits design and construction phase documentation to LEED Online, all the following third party certification process takes place except:

A)preliminary review
B)intermediate review
C)final review
D)appeal review
Question
A LEED Professional had submitted false data to GBCI for review during the Certification process as a result of an audit was determined that the individual had broken the code of conduct for:

A)LEED professional ethics
B)LEED Steering Committee
C)disciplinary policy
D)ethics policy
Question
How many LEED Rating Systems are available?

A)4
B)10
C)11
D)12
Question
What is the procedure required to achieve LEED certification?

A)register the project, pay applicable review fees and submit documentation
B)register the project, retain a LEED professional and pay applicable review fees
C)pay applicable review fees, submit documentation and submit for appeal review
D)pay applicable review fees, register the project and submit documentation
Question
A description of the background/history of the project, the use(s) of the building in detail, the location and surrounding area of the building , and any other project attributes the team would like to highlight is called:

A)LEED description
B)LEED intent
C)project narrative
D)project boundary
Question
A candidate is eligible to be LEED Accredited Professional with Specialty by fulfilling all the following requirements except:

A)document the involvement in support of LEED
B)have previous experience with a LEED Registered project within five years of the application submittal date
C)complete 30 CE hours biennially
D)agree to the Disciplinary Policy
Question
Which of the following is not one of the review stages used on LEED for Neighborhood Development?

A)verification and reflection on achievements
B)review prior to completion of the entitlement process
C)review of a completed neighborhood development
D)certification of an approved development plan
Question
S. General Services Administration requires that all new federal government construction projects and substantial renovations achieve LEED certification, and it encourages projects to achieve at least a ___ rating.

A)certified
B)silver
C)gold
D)platinum
Question
The value of green building construction is projected to increase to $__ billion by 2010.

A)20
B)40
C)60
D)80
Question
Integrative designs where rainwater is captured for domestic use and domestic wastewater is then used for landscape irrigation is called:

A)open-loop system
B)closed-loop system
C)reclaimed water
D)stormwater management
Question
A University of California-Berkeley researchers calculated that at prevailing capitalization rates, green buildings adds more than $__ million to the market value of each property.

A)5
B)7
C)9
D)11
Question
GBCI administers all LEED project certification through third-party certification bodies accredited by:

A)LEED Technical Advisory Group
B)Environmental Protection Agency
C)U.S. Green Building Council
D)American National Standards Institute
Question
How many green building categories are available in each LEED Rating System?

A)5
B)6
C)7
D)8
Question
The three highest categories of relative importance of impacts based on priorities in the 2009 versions of LEED rating system are as follows:

A)climate change, resource depletion and indoor environmental quality
B)climate change, human health criteria and water intake
C)human health criteria, indoor environmental quality and resource depletion
D)human health criteria, climate change and water intake
Question
The goal of the Wingspread Principals call for urgent and effective action to reduce ___ by 60% to 80% below 1990 levels by midcentury.

A)greenhouse gas emissions
B)energy consumption
C)water consumption
D)transportation demand
Question
Some green buildings have greater reductions in greenhouse gas emissions than others because of:

A)specific strategies used to achieve LEED certification
B)the varied level of LEED certification
C)the U.S. Environmental Protection Agency guidelines varies by location
D)the varied energy efficiency strategies
Question
The total greenhouse gas emissions associated with its construction and operation for a LEED-certified project was measured to determine the building's:

A)embodied emissions of energy
B)embodied emission of materials
C)carbon footprint
D)carbon overlay
Question
The building's carbon footprint is determined by all of the following factors except:

A)building systems
B)transportation
C)climate change
D)water
Question
To achieve LEED Platinum certification requires satisfying:

A)achieving all the Innovation in Design and Regional Priority credits
B)all points available in the applicable rating system
C)all prerequisites and earning a minimum number of points in the applicable rating system
D)minimum number of points in the applicable rating system
Question
Project team members are allowed to submit supporting LEED Documentation for a project during the following construction phase(s):

A)predesign
B)design
C)construction
D)design and construction
Question
How many USGBC reviews are included in the registration fee?

A)0
B)1
C)2
D)3
Question
Which two LEED rating systems follow slightly different processes ,reflecting differences in planning and development?

A)LEED for Homes and LEED for Neighborhood Development
B)LEED for Homes and LEED for Hospitals
C)LEED for Neighborhood Development and LEED for Retail
D)LEED for Neighborhood Development and LEED for Core & Shell
Question
Early planning, design, build, verification and certification and reflection on achievement are five steps for which LEED rating system?

A)LEED for Homes
B)LEED for Neighborhood Development
C)LEED for Retail
D)LEED for Core & Shell
Question
How many review stages does the LEED for Neighborhood Development offer?

A)2
B)3
C)4
D)5
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/73
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 4: Leed
1
The LEED Rating System is the benchmark for the design, construction, and operation of the following high-performance green buildings except:

A)Healthcare facilities
B)Homes
C)Neighborhood construction
D)Retail
Neighborhood construction
2
According to a report to California's Sustainable Building Task Force, a green building has the potential to reduce construction waste on an average of:

A)40%
B)60%
C)70%
D)80%
70%
3
All but one of the following are considerations that should be taken in evaluating the life-cycle of a building. Which one is not a consideration?

A)Where building materials comes from and where they will go after use
B)What the energy and water sources are
C)How the building users will get to and from the building
D)New and innovative technologies and strategies
New and innovative technologies and strategies
4
The Schematic Design (SD) phase in construction serves which purpose?

A)Explores several design options and alternatives, with the intent to establish an agreed-upon project layout and scope of work
B)Begins the process of spatial refinement and usually involves the first design of a project's energy systems
C)Carries the design into the detail level for all spaces, systems, and materials so that construction can take place
D)Entails gathering information, recognizing stakeholder needs, establishing project goals, and selecting the site
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
5
LEED-certified buildings are designed to do all of the following except:

A)Lower operating costs and increase asset value
B)Reduce waste sent to landfills
C)Qualify for tax rebates, zoning allowances, and other incentives in hundreds of cities
D)Promote publicity to announce LEED project registration
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
6
All LEED Professional Credentialing exams assess candidates' abilities at the following hierarchical cognitive levels, except:

A)Recognition
B)Quantitative comparison
C)Analysis
D)Application
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
7
Life-cycle cost analysis looks at the cost of green building and:

A)The types of advantages that are discovered when investments are made
B)The ways to create more comfortable, healthier, and sustainable built environments
C)The cost of on-site renewable energy source
D)Measures the overall energy reduction
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
8
In conventional design and construction processes, project team members:

A)Practice integrated approach
B)Move through each phase independently
C)Move through the schematic design phase independently
D)Move through phases in both the integrated approach and independently
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
9
All but one of the following items are included in the Design phase of the construction process. Which one is not included?

A)Predesign
B)Schematic design
C)Design development
D)Construction documents
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
10
During the construction administration phase, which one of the following tasks is performed?

A)Commissioning
B)Bidding
C)Construction documents
D)Costs are established
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
11
Recommissioning, along with occupant surveying (via a post-occupancy evaluation), is recommended to take place at regular intervals in which phase of the building lifecycle?

A)Occupancy
B)Construction
C)Certificate of occupancy
D)Sale
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
12
A project team member is detailing the specifics in planning the air conditioning systems within a building. This project is in the ________ phase of construction.

A)Schematic design
B)Design development
C)Construction documents
D)Construction administration
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
13
In a project, the construction documents phase occurs before ______ and after ______.

A)Construction administration; construction
B)Construction; construction administration
C)Construction; bidding
D)Construction administration; schematic design
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
14
The sequential order of construction phase is as follows:

A)Design, construction administration, bidding, and occupancy
B)Predesign, design, bidding, construction, and occupancy
C)Predesign, design, construction, construction documents, and construction administration
D)Design, bidding, construction and construction documents, and sale
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
15
Which of the following is not part of the design team?

A)Planning staff
B)Architect
C)Day lighting and energy modeler
D)Commissioning authority
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
16
Studies indicate that ____% of the decisions associated with environmental impacts are made during the first _____% of the design process:

A)25; 10
B)50; 25
C)70; 10
D)90; 25
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
17
What is expected to be the outcome of an integrated design process?

A)Higher first cost and higher operating costs
B)Lower first cost and lower operating costs
C)Higher first cost and lower operating costs
D)Lower first cost and higher operating cots
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
18
Studies have demonstrated that ______% or less of the average marginal cost of a building is associated with green buildings.

A)1
B)2
C)4
D)5
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
19
What contributes to the largest consumption of energy in buildings in the United States?

A)Water heating
B)Space heating
C)Space cooling
D)Electric lighting
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
20
S. Green Building Council emphasizes using which type of design process?

A)Linear
B)Multiple
C)Integrative
D)Tiered
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
21
What are the three aspects of sustainability affecting the triple bottom line?

A)Economic theory, cultural agendas, and global sustainability
B)Energy efficiency, water efficiency, and indoor environmental quality
C)Building codes, green practices, and economic theory
D)Economic prosperity, environmental stewardship, and social responsibility
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
22
The installation of an electric hand blow dryer in restrooms will result in which of the following?

A)Reduced water use
B)Reduced materials and resources
C)Reduced hours of occupancy
D)Increased productivity
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
23
LEED points are weighted based on what?

A)Environmental impact and human benefits
B)Environmental performance and difficulty to achieve each credit
C)Material costs and economic prosperity of each credit
D)Regional priority and health benefits
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
24
Which construction phase is the most important in order to incorporate an integrative design approach?

A)Predesign
B)Schematic design
C)Design development
D)Construction documents
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
25
Sustainable design is different from regenerative design in that:

A)Sustainable design is referred to as high performance building
B)Sustainable design is a long-term maintenance of the ecosystem components
C)Regenerative design goes beyond reducing negative impact on the environment
D)Regenerative design meets the needs of the present without compromising the ability of future generations to meet their own needs
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
26
Carbon footprint is a measure of:

A)Transportation
B)Volatile organic compounds
C)Greenhouse gas emissions
D)Energy use
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
27
Which of the following is considered to be biodegradable?

A)Plastics
B)Metals
C)Paper
D)Glass
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
28
All of the following are ways of reducing a building's operational carbon footprint except:

A)Improving building insulation
B)Replacing incandescent lights with CFLS
C)Purchasing carbon offsets
D)Providing public transit subsidies for employees
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
29
When registering a project to be LEED-certified, one must:

A)Go to www.usgbc.org
B)Go to www.gbci.org
C)Go to www.leedratingsystem.org
D)Go to www.leedonline.org
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
30
After having obtained Continuing Education (CE) credits to apply towards your LEED Credential Maintenance Program (CMP), one must submit their hours to:

A)www.usgbc.org
B)www.gbci.org
C)www.leedratingsystem.org
D)www.leedonline.org
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
31
To find information on green building research, one should go to:

A)www.usgbc.org
B)www.gbci.org
C)www.leedratingsystem.org
D)www.leedonline.org
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
32
After reviewing the LEED Rating System, a project team agrees to reach Platinum level for certification for New Construction and Major Renovations. Out of 100 points, the team expects to obtain 88 points with 40 being prerequisites. How many points are required for the project?

A)40
B)48
C)88
D)100
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
33
A project team is working on credits under the Location and Linkages category. Which of the following LEED Rating System are they working on?

A)LEED for Neighborhood Development
B)LEED for Homes
C)LEED for Schools
D)LEED for New Construction
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
34
A project team has successfully earned the point for Awareness and Education (AE 2) for Education of Building Manager. Which of the following LEED rating systems are they working on?

A)LEED for Neighborhood Development
B)LEED for Homes
C)LEED for Schools
D)LEED for New Construction
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
35
A project team is working on the Smart Location and Linkages applications to determine what the best locations are for the new development that would ensure compact, contiguous buildings with multiple transportation options. The LEED Rating Systems they are working on is:

A)LEED for Neighborhood Development
B)LEED for Homes
C)LEED for Schools
D)LEED for New Construction
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
36
The Green Infrastructure and Buildings category promotes the design and construction of buildings and infrastructure that reduce energy and water use, while promoting more sustainable use of materials, reuse of existing and historic structures, and other sustainable best practices. This category in LEED Rating System can be found in:

A)LEED for Neighborhood Development
B)LEED for Homes
C)LEED for Schools
D)LEED for New Construction
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
37
Each prerequisite and credit in the LEED 2009 reference guides contains the following components except:

A)Definitions
B)Benefits and issues to consider
C)Implementation
D)Charts and Diagrams
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
38
An optional LEED Green Building Rating System component whose achievement results in the earning of points toward certification is called:

A)registration
B)intent
C)credit
D)certification
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
39
All of the following statements are true except:

A)all LEED Rating Systems are based on 100 points
B)all LEED credits are worth a minimum of one point
C)all LEED credits are positive and whole numbers
D)all LEED credits receive a single, static weight in each rating system
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
40
A project team has earned 65 points with the maximum bonus credits for Innovation in Design for LEED for Schools. Which level of certification has this project reached?

A)Certified
B)Silver
C)Gold
D)Platinum
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
41
The Rating System for LEED for Existing Schools is in which Reference Guide?

A)LEED Reference Guide for Green Building Design and Construction
B)LEED Reference Guide for Green Interior Design and Construction
C)LEED Reference Guide for Green Building Operations and Maintenance
D)LEED Reference Guide for Green Neighborhood Development
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
42
All Rating Systems must commit to sharing with USGBC and/or GBCI all available actual whole project energy and water usage data for a period of at least __ years:

A)5
B)7
C)9
D)10
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
43
This LEED Rating System works hand in hand with the LEED for Core & Shell certification system:

A)LEED for Commercial Interiors
B)LEED for Existing Buildings
C)LEED for Healthcare
D)LEED for New Construction and Major Renovations
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
44
Which LEED Rating System addresses issues such as increased sensitivity to chemicals and pollutants, traveling distances from parking facilities, and access to natural spaces?

A)LEED for Neighborhood Development
B)LEED for Healthcare
C)LEED for Schools
D)LEED for New Construction and Major Renovations
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
45
Projects involving postsecondary academic buildings or prekindergarten buildings may choose to use either LEED for Schools or:

A)LEED for Neighborhood Development
B)LEED for Homes
C)LEED for Schools
D)LEED for New Construction and Major Renovations
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
46
LEED for Retail can be certified along with all of the following except:

A)LEED for New Construction and Major Renovations
B)LEED for Commercial Interiors
C)LEED for Existing Buildings
D)LEED for Core and Shell
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
47
Which LEED Rating System is targeted to single buildings?

A)LEED for Existing Buildings
B)LEED for Homes
C)LEED for Schools
D)LEED for Healthcare
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
48
The guidance and procedures as well as default figures that must be used for the LEED Core & Shell Rating System include all of the following except:

A)default occupancy counts
B)core & shell day lighting modeling guidelines
C)core & shell project scope
D)tenant lease or sales agreement
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
49
One of the team members working on a LEED for Homes project has asked to be provided the status updates and time lines. This team member then was advised to:

A)use LEED Online
B)review the updated checklist
C)contact GBCI
D)contact LEED customer service
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
50
Once a project team submits design and construction phase documentation to LEED Online, all the following third party certification process takes place except:

A)preliminary review
B)intermediate review
C)final review
D)appeal review
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
51
A LEED Professional had submitted false data to GBCI for review during the Certification process as a result of an audit was determined that the individual had broken the code of conduct for:

A)LEED professional ethics
B)LEED Steering Committee
C)disciplinary policy
D)ethics policy
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
52
How many LEED Rating Systems are available?

A)4
B)10
C)11
D)12
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
53
What is the procedure required to achieve LEED certification?

A)register the project, pay applicable review fees and submit documentation
B)register the project, retain a LEED professional and pay applicable review fees
C)pay applicable review fees, submit documentation and submit for appeal review
D)pay applicable review fees, register the project and submit documentation
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
54
A description of the background/history of the project, the use(s) of the building in detail, the location and surrounding area of the building , and any other project attributes the team would like to highlight is called:

A)LEED description
B)LEED intent
C)project narrative
D)project boundary
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
55
A candidate is eligible to be LEED Accredited Professional with Specialty by fulfilling all the following requirements except:

A)document the involvement in support of LEED
B)have previous experience with a LEED Registered project within five years of the application submittal date
C)complete 30 CE hours biennially
D)agree to the Disciplinary Policy
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
56
Which of the following is not one of the review stages used on LEED for Neighborhood Development?

A)verification and reflection on achievements
B)review prior to completion of the entitlement process
C)review of a completed neighborhood development
D)certification of an approved development plan
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
57
S. General Services Administration requires that all new federal government construction projects and substantial renovations achieve LEED certification, and it encourages projects to achieve at least a ___ rating.

A)certified
B)silver
C)gold
D)platinum
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
58
The value of green building construction is projected to increase to $__ billion by 2010.

A)20
B)40
C)60
D)80
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
59
Integrative designs where rainwater is captured for domestic use and domestic wastewater is then used for landscape irrigation is called:

A)open-loop system
B)closed-loop system
C)reclaimed water
D)stormwater management
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
60
A University of California-Berkeley researchers calculated that at prevailing capitalization rates, green buildings adds more than $__ million to the market value of each property.

A)5
B)7
C)9
D)11
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
61
GBCI administers all LEED project certification through third-party certification bodies accredited by:

A)LEED Technical Advisory Group
B)Environmental Protection Agency
C)U.S. Green Building Council
D)American National Standards Institute
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
62
How many green building categories are available in each LEED Rating System?

A)5
B)6
C)7
D)8
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
63
The three highest categories of relative importance of impacts based on priorities in the 2009 versions of LEED rating system are as follows:

A)climate change, resource depletion and indoor environmental quality
B)climate change, human health criteria and water intake
C)human health criteria, indoor environmental quality and resource depletion
D)human health criteria, climate change and water intake
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
64
The goal of the Wingspread Principals call for urgent and effective action to reduce ___ by 60% to 80% below 1990 levels by midcentury.

A)greenhouse gas emissions
B)energy consumption
C)water consumption
D)transportation demand
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
65
Some green buildings have greater reductions in greenhouse gas emissions than others because of:

A)specific strategies used to achieve LEED certification
B)the varied level of LEED certification
C)the U.S. Environmental Protection Agency guidelines varies by location
D)the varied energy efficiency strategies
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
66
The total greenhouse gas emissions associated with its construction and operation for a LEED-certified project was measured to determine the building's:

A)embodied emissions of energy
B)embodied emission of materials
C)carbon footprint
D)carbon overlay
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
67
The building's carbon footprint is determined by all of the following factors except:

A)building systems
B)transportation
C)climate change
D)water
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
68
To achieve LEED Platinum certification requires satisfying:

A)achieving all the Innovation in Design and Regional Priority credits
B)all points available in the applicable rating system
C)all prerequisites and earning a minimum number of points in the applicable rating system
D)minimum number of points in the applicable rating system
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
69
Project team members are allowed to submit supporting LEED Documentation for a project during the following construction phase(s):

A)predesign
B)design
C)construction
D)design and construction
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
70
How many USGBC reviews are included in the registration fee?

A)0
B)1
C)2
D)3
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
71
Which two LEED rating systems follow slightly different processes ,reflecting differences in planning and development?

A)LEED for Homes and LEED for Neighborhood Development
B)LEED for Homes and LEED for Hospitals
C)LEED for Neighborhood Development and LEED for Retail
D)LEED for Neighborhood Development and LEED for Core & Shell
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
72
Early planning, design, build, verification and certification and reflection on achievement are five steps for which LEED rating system?

A)LEED for Homes
B)LEED for Neighborhood Development
C)LEED for Retail
D)LEED for Core & Shell
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
73
How many review stages does the LEED for Neighborhood Development offer?

A)2
B)3
C)4
D)5
Unlock Deck
Unlock for access to all 73 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 73 flashcards in this deck.