Deck 36: Process Planning and Production Control

Full screen (f)
exit full mode
Question
The manufacturing support systems are the procedures and systems used by a company to solve the technical and logistics problems encountered in planning the processes, ordering materials, controlling production, and ensuring that the company's products meet required quality specifications:
Use Space or
up arrow
down arrow
to flip the card.
Question
The manufacturing engineering department in an organization is best described as which one of the following:

A)branch of the sales department
B)concurrent engineers
C)management
D)product designers
E)production supervisors
F)technical staff function
Question
Which of the following are the usual responsibilities of the manufacturing engineering department (four best answers):

A)advising on design for manufacturability
B)facilities planning
C)marketing the product
D)plant management
E)process improvement
F)process planning
G)product design
H)solving technical problems in the production departments
I)supervision of production workers
Question
In the sequence of manufacturing processes used to produce a part, a basic process establishes the final geometry of the part, whereas secondary processes are used to enhance properties and provide coatings (e.g., painting or plating) on the part surface:
Question
Which of the following are considered basic processes, as opposed to secondary processes (four correct answers):

A)annealing
B)anodizing
C)drilling
D)electroplating
E)forward hot extrusion to produce aluminum bar stock
F)impression die forging
G)rolling of sheet steel
H)sand casting
I)sheet-metal stamping
J)spot welding
K)surface grinding of hardened steel
L)tempering of martensitic steel
M)turning
Question
Which of the following would be considered secondary processes, as opposed to basic processes (four correct answers):

A)annealing
B)arc welding
C)drilling
D)electroplating
E)extrusion to produce steel automotive components
F)impression die forging
G)painting
H)plastic injection molding
I)rolling of sheet steel
J)sand casting
K)sheet-metal stamping
L)sintering of pressed ceramic powders
M)ultrasonic machining
Question
Which of the following are operations to enhance physical properties (three correct answers):

A)annealing
B)anodizing
C)die casting
D)drilling
E)electroplating
F)rolling of nickel alloys
G)sheet metal drawing
H)sintering of pressed ceramic powders
I)surface grinding of hardened steel
J)tempering of martensitic steel
K)turning
L)ultrasonic cleaning
Question
A route sheet is a document whose principal function is which one of the following:

A)continuous improvement
B)design for manufacturability
C)provides authorization for material handlers to move the part
D)quality inspection procedure
E)specifies the process plan
F)specifies the detailed method for a given operation
Question
In a make or buy situation, the decision should always be to purchase the component if the vendor's quoted price is less than the in-house estimated cost of the component:
Question
Which one of the following types of computer-aided process planning relies on parts classification and coding in group technology:

A)generative CAPP
B)retrieval CAPP
C)traditional process planning
D)none of the preceding
Question
Concurrent engineering refers to an approach to product design in which companies attempt to increase the elapsed time to bring a new product to market by integrating design engineering, manufacturing engineering, and other functions in the company:
Question
Which one of the following terms best describes the overall function of production planning and control:

A)inventory control
B)manufacturing logistics
C)manufacturing engineering
D)mass production
E)product design
Question
Which of the following are the three categories of items usually listed in the master production schedule:

A)components used to build the final products
B)firm customer orders
C)general product lines
D)orders for maintenance and spare parts
E)sales forecasts
F)spare tires
Question
Material requirements planning (MRP) is a computational procedure used to convert the detailed schedule for raw materials and components used in end products into the master production schedule for end products:
Question
With which of the following manufacturing resources is capacity requirements planning primarily concerned (two best answers):

A)component parts
B)direct labor
C)inventory storage space
D)production equipment
E)raw materials
Question
Plant capacity adjustments that can be made in the short term include which of the following (three best answers):

A)buying out a competing company
B)increasing or decreasing the number of hours per shift
C)increasing or decreasing the number of shifts per week
D)increasing or decreasing the number of workers
E)purchasing new equipment
F)opening a new plant
Question
The three modules in shop floor control are which of the following (three best answers):

A)capacity planning
B)master production scheduling
C)material requirements planning
D)order planning
E)order progress
F)order release
G)order scheduling
H)shipping
Question
Machine loading refers most closely to which one of the following:

A)assigning jobs to a work center
B)floor foundation in the factory
C)managing work-in-process in the factory
D)releasing orders to the shop
E)sequencing jobs through a machine
Question
Small batch sizes are made economically feasible by increasing the setup time for each batch:
Question
In comparing a just-in-time system with material requirements planning, JIT is a push system of production control, whereas MRP is a pull system:
Question
The word kanban is most closely associated with which one of the following:

A)capacity planning
B)just-in-time production
C)master production schedule
D)material requirements planning
Question
Autonomation refers to the design of production machines that operate autonomously so long as they function the way they are supposed to, but if and when they do not operate that way, they are designed to stop:
Question
In lean production, which of the following are principles and objectives most closely associated with autonomation (three best answers):

A)continuous improvement
B)error prevention
C)just-in-time
D)stop the process
E)total productive maintenance
F)visual management
G)worker involvement
Question
Of the following types of maintenance, which one should be avoided whenever possible:

A)emergency maintenance
B)predictive maintenance
C)preventive maintenance
Question
In lean production, which of the following are principles and objectives most closely associated with worker involvement (three best answers):

A)continuous improvement
B)error prevention
C)just-in-time
D)standard work procedures
E)total productive maintenance
F)visual management
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/25
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 36: Process Planning and Production Control
1
The manufacturing support systems are the procedures and systems used by a company to solve the technical and logistics problems encountered in planning the processes, ordering materials, controlling production, and ensuring that the company's products meet required quality specifications:
True
2
The manufacturing engineering department in an organization is best described as which one of the following:

A)branch of the sales department
B)concurrent engineers
C)management
D)product designers
E)production supervisors
F)technical staff function
technical staff function
3
Which of the following are the usual responsibilities of the manufacturing engineering department (four best answers):

A)advising on design for manufacturability
B)facilities planning
C)marketing the product
D)plant management
E)process improvement
F)process planning
G)product design
H)solving technical problems in the production departments
I)supervision of production workers
advising on design for manufacturability
process improvement
process planning
solving technical problems in the production departments
4
In the sequence of manufacturing processes used to produce a part, a basic process establishes the final geometry of the part, whereas secondary processes are used to enhance properties and provide coatings (e.g., painting or plating) on the part surface:
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
5
Which of the following are considered basic processes, as opposed to secondary processes (four correct answers):

A)annealing
B)anodizing
C)drilling
D)electroplating
E)forward hot extrusion to produce aluminum bar stock
F)impression die forging
G)rolling of sheet steel
H)sand casting
I)sheet-metal stamping
J)spot welding
K)surface grinding of hardened steel
L)tempering of martensitic steel
M)turning
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
6
Which of the following would be considered secondary processes, as opposed to basic processes (four correct answers):

A)annealing
B)arc welding
C)drilling
D)electroplating
E)extrusion to produce steel automotive components
F)impression die forging
G)painting
H)plastic injection molding
I)rolling of sheet steel
J)sand casting
K)sheet-metal stamping
L)sintering of pressed ceramic powders
M)ultrasonic machining
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following are operations to enhance physical properties (three correct answers):

A)annealing
B)anodizing
C)die casting
D)drilling
E)electroplating
F)rolling of nickel alloys
G)sheet metal drawing
H)sintering of pressed ceramic powders
I)surface grinding of hardened steel
J)tempering of martensitic steel
K)turning
L)ultrasonic cleaning
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
8
A route sheet is a document whose principal function is which one of the following:

A)continuous improvement
B)design for manufacturability
C)provides authorization for material handlers to move the part
D)quality inspection procedure
E)specifies the process plan
F)specifies the detailed method for a given operation
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
9
In a make or buy situation, the decision should always be to purchase the component if the vendor's quoted price is less than the in-house estimated cost of the component:
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
10
Which one of the following types of computer-aided process planning relies on parts classification and coding in group technology:

A)generative CAPP
B)retrieval CAPP
C)traditional process planning
D)none of the preceding
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
11
Concurrent engineering refers to an approach to product design in which companies attempt to increase the elapsed time to bring a new product to market by integrating design engineering, manufacturing engineering, and other functions in the company:
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
12
Which one of the following terms best describes the overall function of production planning and control:

A)inventory control
B)manufacturing logistics
C)manufacturing engineering
D)mass production
E)product design
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following are the three categories of items usually listed in the master production schedule:

A)components used to build the final products
B)firm customer orders
C)general product lines
D)orders for maintenance and spare parts
E)sales forecasts
F)spare tires
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
14
Material requirements planning (MRP) is a computational procedure used to convert the detailed schedule for raw materials and components used in end products into the master production schedule for end products:
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
15
With which of the following manufacturing resources is capacity requirements planning primarily concerned (two best answers):

A)component parts
B)direct labor
C)inventory storage space
D)production equipment
E)raw materials
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
16
Plant capacity adjustments that can be made in the short term include which of the following (three best answers):

A)buying out a competing company
B)increasing or decreasing the number of hours per shift
C)increasing or decreasing the number of shifts per week
D)increasing or decreasing the number of workers
E)purchasing new equipment
F)opening a new plant
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
17
The three modules in shop floor control are which of the following (three best answers):

A)capacity planning
B)master production scheduling
C)material requirements planning
D)order planning
E)order progress
F)order release
G)order scheduling
H)shipping
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
18
Machine loading refers most closely to which one of the following:

A)assigning jobs to a work center
B)floor foundation in the factory
C)managing work-in-process in the factory
D)releasing orders to the shop
E)sequencing jobs through a machine
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
19
Small batch sizes are made economically feasible by increasing the setup time for each batch:
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
20
In comparing a just-in-time system with material requirements planning, JIT is a push system of production control, whereas MRP is a pull system:
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
21
The word kanban is most closely associated with which one of the following:

A)capacity planning
B)just-in-time production
C)master production schedule
D)material requirements planning
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
22
Autonomation refers to the design of production machines that operate autonomously so long as they function the way they are supposed to, but if and when they do not operate that way, they are designed to stop:
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
23
In lean production, which of the following are principles and objectives most closely associated with autonomation (three best answers):

A)continuous improvement
B)error prevention
C)just-in-time
D)stop the process
E)total productive maintenance
F)visual management
G)worker involvement
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
24
Of the following types of maintenance, which one should be avoided whenever possible:

A)emergency maintenance
B)predictive maintenance
C)preventive maintenance
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
25
In lean production, which of the following are principles and objectives most closely associated with worker involvement (three best answers):

A)continuous improvement
B)error prevention
C)just-in-time
D)standard work procedures
E)total productive maintenance
F)visual management
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 25 flashcards in this deck.