Deck 22: Standard Costing and Variance Analysis

Full screen (f)
exit full mode
Question
An unfavorable direct labor rate variance is recorded as a debit.
Use Space or
up arrow
down arrow
to flip the card.
Question
Use the following information to answer the following Questions
The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:
<strong>Use the following information to answer the following Questions The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:    -Determine the labor rate variance.</strong> A) $1,200 F B) $1,200 U C) $1,290 F D) $1,290 U E) None of the above <div style=padding-top: 35px>

-Determine the labor rate variance.

A) $1,200 F
B) $1,200 U
C) $1,290 F
D) $1,290 U
E) None of the above
Question
Use the following information to answer the following Questions
The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:
<strong>Use the following information to answer the following Questions The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:    -Determine the labor efficiency variance.</strong> A) $4,410 U B) $4,410 F C) $4,500 F D) $4,500 U E) None of the above <div style=padding-top: 35px>

-Determine the labor efficiency variance.

A) $4,410 U
B) $4,410 F
C) $4,500 F
D) $4,500 U
E) None of the above
Question
Use the following information to answer the following Questions
The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:
<strong>Use the following information to answer the following Questions The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:    -Determine the labor efficiency variance.</strong> A) $2,000 F B) $2,000 U C) $2,050 F D) $2,050 U E) None of the above <div style=padding-top: 35px>

-Determine the labor efficiency variance.

A) $2,000 F
B) $2,000 U
C) $2,050 F
D) $2,050 U
E) None of the above
Question
Use the following information to answer the following Questions
The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:
<strong>Use the following information to answer the following Questions The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:    -Determine the materials price variance.</strong> A) $1,200 F B) $1,200 U C) $1,155 U D) $1,155 F E) None of the above <div style=padding-top: 35px>

-Determine the materials price variance.

A) $1,200 F
B) $1,200 U
C) $1,155 U
D) $1,155 F
E) None of the above
Question
Use the following information to answer the following Questions
Kraig Fencing considers 4,000 direct labor hours or 100 fences to be its normal monthly capacity. Its standard variable overhead rate is $9 per direct labor hour. During the current month, $33,500 of variable overhead costs were incurred in working 3,800 direct labor hours to complete 92 fences.

-What is the variable overhead efficiency variance?

A) $1,080 U
B) $1,080 F
C) $1,800 U
D) $1,800 F
E) None of the above
Question
Use the following information to answer the following Questions
Phillips Fencing considers 6,000 direct labor hours or 200 fences to be its normal monthly capacity. Its standard variable overhead rate is $7 per direct labor hour. During the current month, $44,500 of variable overhead costs were incurred in working 6,200 direct labor hours to complete 215 fences.

-What is the variable overhead spending variance?

A) $1,100 F
B) $2,500 F
C) $1,100 U
D) $2,500 U
E) None of the above
Question
Use the following information to answer the following Questions
Phillips Fencing considers 6,000 direct labor hours or 200 fences to be its normal monthly capacity. Its standard variable overhead rate is $7 per direct labor hour. During the current month, $44,500 of variable overhead costs were incurred in working 6,200 direct labor hours to complete 215 fences.

-What is the variable overhead efficiency variance?

A) $1,400 U
B) $1,750 U
C) $1,400 F
D) $1,750 F
E) None of the above
Question
Use the following information to answer the following Questions
Landreth Fencing considers 3,000 direct labor hours or 50 fences to be its normal monthly capacity. Its standard variable overhead rate is $12 per direct labor hour. During the current month, $29,800 of variable overhead costs were incurred in working 2,950 direct labor hours to complete 45 fences.

-What is the variable overhead spending variance?

A) 5,600 F
B) 5,600 U
C) 6,200 F
D) 6,200 U
E) None of the above
Question
Use the following information to answer the following Questions
The following data relates to Koontz Corporation's operations for the month. 1,000 finished units of product were produced and the normal monthly capacity is 2,200 direct labor hours.
<strong>Use the following information to answer the following Questions The following data relates to Koontz Corporation's operations for the month. 1,000 finished units of product were produced and the normal monthly capacity is 2,200 direct labor hours.    -What is the materials efficiency variance?</strong> A) $1,960 U B) $1,960 F C) $2,000 U D) $2,000 F E) None of the above <div style=padding-top: 35px>

-What is the materials efficiency variance?

A) $1,960 U
B) $1,960 F
C) $2,000 U
D) $2,000 F
E) None of the above
Question
Use the following information to answer the following Questions
The following data relates to Koontz Corporation's operations for the month. 1,000 finished units of product were produced and the normal monthly capacity is 2,200 direct labor hours.
<strong>Use the following information to answer the following Questions The following data relates to Koontz Corporation's operations for the month. 1,000 finished units of product were produced and the normal monthly capacity is 2,200 direct labor hours.    -What is the labor efficiency variance?</strong> A) $4,000 U B) $8,000 U C) $4,000 F D) $8,000 F E) None of the above <div style=padding-top: 35px>

-What is the labor efficiency variance?

A) $4,000 U
B) $8,000 U
C) $4,000 F
D) $8,000 F
E) None of the above
Question
Use the following information to answer the following Questions
The following data relates to Koontz Corporation's operations for the month. 1,000 finished units of product were produced and the normal monthly capacity is 2,200 direct labor hours.
<strong>Use the following information to answer the following Questions The following data relates to Koontz Corporation's operations for the month. 1,000 finished units of product were produced and the normal monthly capacity is 2,200 direct labor hours.    -What is the variable overhead efficiency variance?</strong> A) $1,200 F B) $1,200 U C) $1,600 F D) $1,600 U E) None of the above <div style=padding-top: 35px>

-What is the variable overhead efficiency variance?

A) $1,200 F
B) $1,200 U
C) $1,600 F
D) $1,600 U
E) None of the above
Question
Use the following information to answer the following Questions
The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.
<strong>Use the following information to answer the following Questions The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.    -What is the materials efficiency variance?</strong> A) $2,500.00 U B) $2,500.00 F C) $2,537.50 U D) $2,537.50 F E) None of the above <div style=padding-top: 35px>

-What is the materials efficiency variance?

A) $2,500.00 U
B) $2,500.00 F
C) $2,537.50 U
D) $2,537.50 F
E) None of the above
Question
Use the following information to answer the following Questions
The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.
<strong>Use the following information to answer the following Questions The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.    -What is the labor efficiency variance?</strong> A) $5,970 U B) $6,000 U C) $5,970 F D) $6,000 F E) None of the above <div style=padding-top: 35px>

-What is the labor efficiency variance?

A) $5,970 U
B) $6,000 U
C) $5,970 F
D) $6,000 F
E) None of the above
Question
Use the following information to answer the following Questions
The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.
<strong>Use the following information to answer the following Questions The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.    -What is the variable overhead spending variance?</strong> A) $3,000 F B) $3,000 U C) $4,500 F D) $4,500 U E) None of the above <div style=padding-top: 35px>

-What is the variable overhead spending variance?

A) $3,000 F
B) $3,000 U
C) $4,500 F
D) $4,500 U
E) None of the above
Question
Use the following information to answer the following Questions
The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.
<strong>Use the following information to answer the following Questions The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.    -What is the variable overhead efficiency variance?</strong> A) $1,500 U B) $1,500 F C) $3,000 U D) $3,000 F E) None of the above <div style=padding-top: 35px>

-What is the variable overhead efficiency variance?

A) $1,500 U
B) $1,500 F
C) $3,000 U
D) $3,000 F
E) None of the above
Question
Martin Corporation's accountant provided the following information:
Martin Corporation's accountant provided the following information:   If there is a $3,750 Favorable variable overhead efficiency variance, what is the variable overhead spending variance?<div style=padding-top: 35px> If there is a $3,750 Favorable variable overhead efficiency variance, what is the variable overhead spending variance?
Question
The following data relates to Pokagon Corporation's operations for the month. Pokagon produced 4,800 units and the normal monthly capacity is 20,000 direct labor hours.
The following data relates to Pokagon Corporation's operations for the month. Pokagon produced 4,800 units and the normal monthly capacity is 20,000 direct labor hours.   Use fork diagrams to calculate the following variances: a. Materials price variance b. Materials efficiency variance c. Labor rate variance d. Labor efficiency variance e. Variable overhead spending variance f. Variable overhead efficiency variance<div style=padding-top: 35px> Use fork diagrams to calculate the following variances:
a. Materials price variance
b. Materials efficiency variance
c. Labor rate variance
d. Labor efficiency variance
e. Variable overhead spending variance
f. Variable overhead efficiency variance
Question
What are variances?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/19
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 22: Standard Costing and Variance Analysis
1
An unfavorable direct labor rate variance is recorded as a debit.
True
2
Use the following information to answer the following Questions
The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:
<strong>Use the following information to answer the following Questions The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:    -Determine the labor rate variance.</strong> A) $1,200 F B) $1,200 U C) $1,290 F D) $1,290 U E) None of the above

-Determine the labor rate variance.

A) $1,200 F
B) $1,200 U
C) $1,290 F
D) $1,290 U
E) None of the above
$1,290 F
3
Use the following information to answer the following Questions
The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:
<strong>Use the following information to answer the following Questions The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:    -Determine the labor efficiency variance.</strong> A) $4,410 U B) $4,410 F C) $4,500 F D) $4,500 U E) None of the above

-Determine the labor efficiency variance.

A) $4,410 U
B) $4,410 F
C) $4,500 F
D) $4,500 U
E) None of the above
$4,500 U
4
Use the following information to answer the following Questions
The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:
<strong>Use the following information to answer the following Questions The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:    -Determine the labor efficiency variance.</strong> A) $2,000 F B) $2,000 U C) $2,050 F D) $2,050 U E) None of the above

-Determine the labor efficiency variance.

A) $2,000 F
B) $2,000 U
C) $2,050 F
D) $2,050 U
E) None of the above
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
5
Use the following information to answer the following Questions
The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:
<strong>Use the following information to answer the following Questions The following actual and standard cost data for direct material and direct labor relate to the production of 4,000 units of product:    -Determine the materials price variance.</strong> A) $1,200 F B) $1,200 U C) $1,155 U D) $1,155 F E) None of the above

-Determine the materials price variance.

A) $1,200 F
B) $1,200 U
C) $1,155 U
D) $1,155 F
E) None of the above
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
6
Use the following information to answer the following Questions
Kraig Fencing considers 4,000 direct labor hours or 100 fences to be its normal monthly capacity. Its standard variable overhead rate is $9 per direct labor hour. During the current month, $33,500 of variable overhead costs were incurred in working 3,800 direct labor hours to complete 92 fences.

-What is the variable overhead efficiency variance?

A) $1,080 U
B) $1,080 F
C) $1,800 U
D) $1,800 F
E) None of the above
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
7
Use the following information to answer the following Questions
Phillips Fencing considers 6,000 direct labor hours or 200 fences to be its normal monthly capacity. Its standard variable overhead rate is $7 per direct labor hour. During the current month, $44,500 of variable overhead costs were incurred in working 6,200 direct labor hours to complete 215 fences.

-What is the variable overhead spending variance?

A) $1,100 F
B) $2,500 F
C) $1,100 U
D) $2,500 U
E) None of the above
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
8
Use the following information to answer the following Questions
Phillips Fencing considers 6,000 direct labor hours or 200 fences to be its normal monthly capacity. Its standard variable overhead rate is $7 per direct labor hour. During the current month, $44,500 of variable overhead costs were incurred in working 6,200 direct labor hours to complete 215 fences.

-What is the variable overhead efficiency variance?

A) $1,400 U
B) $1,750 U
C) $1,400 F
D) $1,750 F
E) None of the above
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
9
Use the following information to answer the following Questions
Landreth Fencing considers 3,000 direct labor hours or 50 fences to be its normal monthly capacity. Its standard variable overhead rate is $12 per direct labor hour. During the current month, $29,800 of variable overhead costs were incurred in working 2,950 direct labor hours to complete 45 fences.

-What is the variable overhead spending variance?

A) 5,600 F
B) 5,600 U
C) 6,200 F
D) 6,200 U
E) None of the above
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
10
Use the following information to answer the following Questions
The following data relates to Koontz Corporation's operations for the month. 1,000 finished units of product were produced and the normal monthly capacity is 2,200 direct labor hours.
<strong>Use the following information to answer the following Questions The following data relates to Koontz Corporation's operations for the month. 1,000 finished units of product were produced and the normal monthly capacity is 2,200 direct labor hours.    -What is the materials efficiency variance?</strong> A) $1,960 U B) $1,960 F C) $2,000 U D) $2,000 F E) None of the above

-What is the materials efficiency variance?

A) $1,960 U
B) $1,960 F
C) $2,000 U
D) $2,000 F
E) None of the above
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
11
Use the following information to answer the following Questions
The following data relates to Koontz Corporation's operations for the month. 1,000 finished units of product were produced and the normal monthly capacity is 2,200 direct labor hours.
<strong>Use the following information to answer the following Questions The following data relates to Koontz Corporation's operations for the month. 1,000 finished units of product were produced and the normal monthly capacity is 2,200 direct labor hours.    -What is the labor efficiency variance?</strong> A) $4,000 U B) $8,000 U C) $4,000 F D) $8,000 F E) None of the above

-What is the labor efficiency variance?

A) $4,000 U
B) $8,000 U
C) $4,000 F
D) $8,000 F
E) None of the above
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
12
Use the following information to answer the following Questions
The following data relates to Koontz Corporation's operations for the month. 1,000 finished units of product were produced and the normal monthly capacity is 2,200 direct labor hours.
<strong>Use the following information to answer the following Questions The following data relates to Koontz Corporation's operations for the month. 1,000 finished units of product were produced and the normal monthly capacity is 2,200 direct labor hours.    -What is the variable overhead efficiency variance?</strong> A) $1,200 F B) $1,200 U C) $1,600 F D) $1,600 U E) None of the above

-What is the variable overhead efficiency variance?

A) $1,200 F
B) $1,200 U
C) $1,600 F
D) $1,600 U
E) None of the above
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
13
Use the following information to answer the following Questions
The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.
<strong>Use the following information to answer the following Questions The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.    -What is the materials efficiency variance?</strong> A) $2,500.00 U B) $2,500.00 F C) $2,537.50 U D) $2,537.50 F E) None of the above

-What is the materials efficiency variance?

A) $2,500.00 U
B) $2,500.00 F
C) $2,537.50 U
D) $2,537.50 F
E) None of the above
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
14
Use the following information to answer the following Questions
The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.
<strong>Use the following information to answer the following Questions The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.    -What is the labor efficiency variance?</strong> A) $5,970 U B) $6,000 U C) $5,970 F D) $6,000 F E) None of the above

-What is the labor efficiency variance?

A) $5,970 U
B) $6,000 U
C) $5,970 F
D) $6,000 F
E) None of the above
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
15
Use the following information to answer the following Questions
The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.
<strong>Use the following information to answer the following Questions The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.    -What is the variable overhead spending variance?</strong> A) $3,000 F B) $3,000 U C) $4,500 F D) $4,500 U E) None of the above

-What is the variable overhead spending variance?

A) $3,000 F
B) $3,000 U
C) $4,500 F
D) $4,500 U
E) None of the above
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
16
Use the following information to answer the following Questions
The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.
<strong>Use the following information to answer the following Questions The following data relates to Camire Corporation's operations for the month. 3,000 finished units of product were produced and the normal monthly capacity is 4,800 direct labor hours.    -What is the variable overhead efficiency variance?</strong> A) $1,500 U B) $1,500 F C) $3,000 U D) $3,000 F E) None of the above

-What is the variable overhead efficiency variance?

A) $1,500 U
B) $1,500 F
C) $3,000 U
D) $3,000 F
E) None of the above
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
17
Martin Corporation's accountant provided the following information:
Martin Corporation's accountant provided the following information:   If there is a $3,750 Favorable variable overhead efficiency variance, what is the variable overhead spending variance? If there is a $3,750 Favorable variable overhead efficiency variance, what is the variable overhead spending variance?
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
18
The following data relates to Pokagon Corporation's operations for the month. Pokagon produced 4,800 units and the normal monthly capacity is 20,000 direct labor hours.
The following data relates to Pokagon Corporation's operations for the month. Pokagon produced 4,800 units and the normal monthly capacity is 20,000 direct labor hours.   Use fork diagrams to calculate the following variances: a. Materials price variance b. Materials efficiency variance c. Labor rate variance d. Labor efficiency variance e. Variable overhead spending variance f. Variable overhead efficiency variance Use fork diagrams to calculate the following variances:
a. Materials price variance
b. Materials efficiency variance
c. Labor rate variance
d. Labor efficiency variance
e. Variable overhead spending variance
f. Variable overhead efficiency variance
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
19
What are variances?
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 19 flashcards in this deck.