Deck 9: Estimating Project Costs

Full screen (f)
exit full mode
Question
Which of the following types of estimates would a contractor most likely use to bid a project?

A) Square foot
B) Unit price
C) Systems
D) Conceptual
E) Aggregate
Use Space or
up arrow
down arrow
to flip the card.
Question
Which of the following best defines learning curve?

A) Repetition is inversely related to productivity.
B) Productivity increases as repetitions increase.
C) Worker productivity is a constant.
D) Productivity decreases as the size of a project increases.
E) None of the above
Question
When adjusting an estimate for time and location, the adjustment for location must be made first.
Question
The amount of profit a bidder includes is a factor of ????

A) Extent of perceived risk
B) Level of expected competition
C) Project duration
D) The particular client
E) All of the above
Question
As an estimate progresses from conceptual to detailed, it takes longer to prepare and becomes less accurate.
Question
The value of the quality to the owner ????as the design quality of a project increases.

A) Increases at a decreasing rate
B) Increases at an increasing rate
C) Increases at a constant rate
D) Decreases
E) Does not change
Question
An index measures change with respect to an established baseline.
Question
Overhead burden is greatest on which of the following cost categories?

A) In-house material
B) In-house labor
C) In-house equipment
D) Subcontractor
E) Overhead is applied equally to all cost categories
Question
The Masterformat specification format, as compared to the Uniformat, better reflects the manner in which a project is built.
Question
The level of contingency applied to a project should ????as the project moves towards completion.

A) Increase
B) Decrease
C) Remain constant
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 9: Estimating Project Costs
1
Which of the following types of estimates would a contractor most likely use to bid a project?

A) Square foot
B) Unit price
C) Systems
D) Conceptual
E) Aggregate
Unit price
2
Which of the following best defines learning curve?

A) Repetition is inversely related to productivity.
B) Productivity increases as repetitions increase.
C) Worker productivity is a constant.
D) Productivity decreases as the size of a project increases.
E) None of the above
Productivity increases as repetitions increase.
3
When adjusting an estimate for time and location, the adjustment for location must be made first.
False
4
The amount of profit a bidder includes is a factor of ????

A) Extent of perceived risk
B) Level of expected competition
C) Project duration
D) The particular client
E) All of the above
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
5
As an estimate progresses from conceptual to detailed, it takes longer to prepare and becomes less accurate.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
6
The value of the quality to the owner ????as the design quality of a project increases.

A) Increases at a decreasing rate
B) Increases at an increasing rate
C) Increases at a constant rate
D) Decreases
E) Does not change
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
7
An index measures change with respect to an established baseline.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
8
Overhead burden is greatest on which of the following cost categories?

A) In-house material
B) In-house labor
C) In-house equipment
D) Subcontractor
E) Overhead is applied equally to all cost categories
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
9
The Masterformat specification format, as compared to the Uniformat, better reflects the manner in which a project is built.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
10
The level of contingency applied to a project should ????as the project moves towards completion.

A) Increase
B) Decrease
C) Remain constant
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 10 flashcards in this deck.