Question
Price and cost do not always mean the same thing.
Use Space or
up arrow
down arrow
to flip the card.
Question
If a landscape project is really large, it will need more than drawings to explain the design and acceptable standards.
Question
Overhead costs are generated by the clients and passed along to the landscape company.
Question
There are many things that can wipe out the landscaper's expected profit including weather, labor problems, miscalculations, and poor materials.
Question
The general overhead costs are charged only to large projects and are included in their price.
Question
The price is binding on the landscape company only when the work starts.
Question
Price overruns result in disappointment of the client and a waste of time.
Question
Overhead costs are both general and project-specific.
Question
If unforeseen conditions delay the project or costs increase for other reasons, the bid price can be adjusted to protect the contractor's profit.
Question
Specifications should be exact and precise to prevent client disappointment.
Question
To which person(s) is the term price most appropriately applied?

A) the designer
B) the client
C) the contractor
D) the architect
Question
Determining the cost of a landscape project has what objective?

A) getting the job
B) establishing completion dates
C) financing the project
D) recovering expenses
Question
Price equals landscape design services plus what else?

A) landscape contracting services
B) labor and management costs
C) material and supply costs
D) equipment costs
Question
What describes an approximation of the price that a customer is charged for a project?

A) estimate
B) bid
C) offer
D) assessment
Question
Some states require what qualification of landscape architects that prevents others from charging for their design services?

A) bonding
B) incorporation
C) accreditation
D) insurance
Question
What two items are used by a landscape contractor to prepare a bid?

A) insurance forms and credit references
B) drawings and catalogues
C) drawings and specifications
D) bank records and client profiles
Question
What identifying notations must be included on a bid?

A) client's name and address
B) name of the estimator
C) date of preparation
D) All answers are correct
Question
Where in a bid are administrative salaries, advertising costs, rent, and office expenses included?

A) labor
B) contingency costs
C) overhead
D) materials
Question
What component of a bid provides for unpredictable things that can disrupt a construction schedule and increase costs?

A) overhead costs
B) specifications
C) liability insurance
D) contingency allowance
Question
A listing of the materials, quality standards, and time schedules required to build a particular project is called what?

A) specifications
B) building materials
C) work order
D) measurements
Question
A ____________________ is a definite commitment to provide services and materials specified in a contract for an agreed upon price.
Question
____________________ is what the client pays to have the landscape built.
Question
Expenses incurred by a landscaper who hires an outside firm to perform a portion of the work are ____________________ costs.
Question
Compared to a bid, the price figure given to a client in an estimate is ____________________.
Question
When bidding involves only one company, the discussions between the client and company are usually informal and ____________________.
Question
Precisely written ____________________ prevent client disappointment and discourage deceptive bidding.
Question
When factoring the cost of equipment into a bid, its time of ____________________ must be included.
Question
The form of measurement used to count and quantify materials is termed the ____________________ of measurement.
Question
The overhead and profit allowance for plant material is usually greater than that for hardscape materials because of the ____________________ of plants.
Question
When describing the plant materials to be used at the time of installation, each plant's size and ____________________ must be included in the description for complete clarity of what is expected.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/30
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 12: Pricing the Proposed Design
1
Price and cost do not always mean the same thing.
True
2
If a landscape project is really large, it will need more than drawings to explain the design and acceptable standards.
True
3
Overhead costs are generated by the clients and passed along to the landscape company.
False
4
There are many things that can wipe out the landscaper's expected profit including weather, labor problems, miscalculations, and poor materials.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
5
The general overhead costs are charged only to large projects and are included in their price.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
6
The price is binding on the landscape company only when the work starts.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
7
Price overruns result in disappointment of the client and a waste of time.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
8
Overhead costs are both general and project-specific.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
9
If unforeseen conditions delay the project or costs increase for other reasons, the bid price can be adjusted to protect the contractor's profit.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
10
Specifications should be exact and precise to prevent client disappointment.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
11
To which person(s) is the term price most appropriately applied?

A) the designer
B) the client
C) the contractor
D) the architect
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
12
Determining the cost of a landscape project has what objective?

A) getting the job
B) establishing completion dates
C) financing the project
D) recovering expenses
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
13
Price equals landscape design services plus what else?

A) landscape contracting services
B) labor and management costs
C) material and supply costs
D) equipment costs
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
14
What describes an approximation of the price that a customer is charged for a project?

A) estimate
B) bid
C) offer
D) assessment
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
15
Some states require what qualification of landscape architects that prevents others from charging for their design services?

A) bonding
B) incorporation
C) accreditation
D) insurance
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
16
What two items are used by a landscape contractor to prepare a bid?

A) insurance forms and credit references
B) drawings and catalogues
C) drawings and specifications
D) bank records and client profiles
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
17
What identifying notations must be included on a bid?

A) client's name and address
B) name of the estimator
C) date of preparation
D) All answers are correct
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
18
Where in a bid are administrative salaries, advertising costs, rent, and office expenses included?

A) labor
B) contingency costs
C) overhead
D) materials
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
19
What component of a bid provides for unpredictable things that can disrupt a construction schedule and increase costs?

A) overhead costs
B) specifications
C) liability insurance
D) contingency allowance
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
20
A listing of the materials, quality standards, and time schedules required to build a particular project is called what?

A) specifications
B) building materials
C) work order
D) measurements
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
21
A ____________________ is a definite commitment to provide services and materials specified in a contract for an agreed upon price.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
22
____________________ is what the client pays to have the landscape built.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
23
Expenses incurred by a landscaper who hires an outside firm to perform a portion of the work are ____________________ costs.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
24
Compared to a bid, the price figure given to a client in an estimate is ____________________.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
25
When bidding involves only one company, the discussions between the client and company are usually informal and ____________________.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
26
Precisely written ____________________ prevent client disappointment and discourage deceptive bidding.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
27
When factoring the cost of equipment into a bid, its time of ____________________ must be included.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
28
The form of measurement used to count and quantify materials is termed the ____________________ of measurement.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
29
The overhead and profit allowance for plant material is usually greater than that for hardscape materials because of the ____________________ of plants.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
30
When describing the plant materials to be used at the time of installation, each plant's size and ____________________ must be included in the description for complete clarity of what is expected.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 30 flashcards in this deck.