Deck 10: Manufacturing Processes

Full screen (f)
exit full mode
Question
Which of the following device is not used for measuring?

A) Forging
B) Steel rule
C) Digital caliper
D) Fixed gages
E) Micrometer
Use Space or
up arrow
down arrow
to flip the card.
Question
Which of the following is not a principal type of metal forming process?

A) Machining from standard stock
B) Welding
C) Sheet-metal bending
D) Forming from sheet stock
E) Casting
Question
A manufacturing system that integrates manufacturing cells into a large unit, considered to have the highest level of efficiency, sophistication, and productivity, is:

A) Computer-aided process planning
B) Expert systems
C) Just-in-time production
D) Flexible manufacturing system
E) Cellular manufacturing systems
Question
Mechanical properties include all of the following except:

A) Strength-to-weight ratio
B) Elasticity
C) Fatigue
D) Flammability
E) Creep
Question
Which of the following is not a type of rapid prototyping system?

A) SLA
B) DFM
C) FDM
D) LOM
E) TSF
Question
Which of the following items must be considered in the life cycle of a product?

A) Design
B) Distribution
C) Disposal
D) Recycling
E) All of the above
Question
With the development of 3-D CAD, the need for prototypes has been nearly eliminated.
Question
Nonferrous metals include such composites as carbon, alloy, and stainless.
Question
JIT is the process of warehousing parts so that they are available when required.
Question
Composite materials include a group of materials that are made up of reinforced plastic, metal-matrix, and ceramic-matrix materials.
Question
Methods used to process materials to the desired shapes can adversely affect the product's final properties, service life, and cost.
Question
In design, when casting a part, it is a good idea to not to enlarge a thin piece of material as it intersects a thick piece of material because of the additional cost of material required.
Question
When drilling into a slanted or curved surface, it is easier if the material is quenched.
Question
The designer must be aware of the cost of obtaining raw materials.
Question
To reduce cost of handling materials, designing components for automated and ____________ assembly is more desirable.
Question
The manufacturing process that produces individual parts is referred to as ___________________ product production.
Question
Often, with good planning, rapid prototyping can be accomplished using the _______________ design and reduce the time to create a prototype.
Question
Most rapid prototyping systems can create parts up to ____________ cubic inches.
Question
Individual parts or components of a product must be designed so that it meets design requirements and specifications and can be efficiently and _____________ manufactured.
Question
Those materials that fall into a category known as engineered materials are also called ____________________ materials.
Question
The designer must always be alert to the processes involved in manufacturing and ______________.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/21
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 10: Manufacturing Processes
1
Which of the following device is not used for measuring?

A) Forging
B) Steel rule
C) Digital caliper
D) Fixed gages
E) Micrometer
Forging
2
Which of the following is not a principal type of metal forming process?

A) Machining from standard stock
B) Welding
C) Sheet-metal bending
D) Forming from sheet stock
E) Casting
Sheet-metal bending
3
A manufacturing system that integrates manufacturing cells into a large unit, considered to have the highest level of efficiency, sophistication, and productivity, is:

A) Computer-aided process planning
B) Expert systems
C) Just-in-time production
D) Flexible manufacturing system
E) Cellular manufacturing systems
Flexible manufacturing system
4
Mechanical properties include all of the following except:

A) Strength-to-weight ratio
B) Elasticity
C) Fatigue
D) Flammability
E) Creep
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
5
Which of the following is not a type of rapid prototyping system?

A) SLA
B) DFM
C) FDM
D) LOM
E) TSF
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
6
Which of the following items must be considered in the life cycle of a product?

A) Design
B) Distribution
C) Disposal
D) Recycling
E) All of the above
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
7
With the development of 3-D CAD, the need for prototypes has been nearly eliminated.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
8
Nonferrous metals include such composites as carbon, alloy, and stainless.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
9
JIT is the process of warehousing parts so that they are available when required.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
10
Composite materials include a group of materials that are made up of reinforced plastic, metal-matrix, and ceramic-matrix materials.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
11
Methods used to process materials to the desired shapes can adversely affect the product's final properties, service life, and cost.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
12
In design, when casting a part, it is a good idea to not to enlarge a thin piece of material as it intersects a thick piece of material because of the additional cost of material required.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
13
When drilling into a slanted or curved surface, it is easier if the material is quenched.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
14
The designer must be aware of the cost of obtaining raw materials.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
15
To reduce cost of handling materials, designing components for automated and ____________ assembly is more desirable.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
16
The manufacturing process that produces individual parts is referred to as ___________________ product production.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
17
Often, with good planning, rapid prototyping can be accomplished using the _______________ design and reduce the time to create a prototype.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
18
Most rapid prototyping systems can create parts up to ____________ cubic inches.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
19
Individual parts or components of a product must be designed so that it meets design requirements and specifications and can be efficiently and _____________ manufactured.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
20
Those materials that fall into a category known as engineered materials are also called ____________________ materials.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
21
The designer must always be alert to the processes involved in manufacturing and ______________.
Unlock Deck
Unlock for access to all 21 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 21 flashcards in this deck.