Deck 3: Managing the Information Systems Project

Full screen (f)
exit full mode
Question
Gantt charts typically show how tasks must be ordered and when an activity should begin and end.
Use Space or
up arrow
down arrow
to flip the card.
Question
The focus of project management is to assure that systems development projects meet customer expectations and are delivered within budget and time constraints.
Question
When a project manager works closely with customers to assure project deliverables meet expectations,he/she is performing a customer relations activity.
Question
In order to determine the resources required for project completion,an organization should analyze the project's scope and determine the project's probability of successful completion.
Question
Task sequence depends on which tasks produce deliverables needed in other tasks,when critical resources are available,the constraints placed on the project by the client,and the process outlined in the SDLC.
Question
Project initiation is the second phase of the project management process,which focuses on defining clear,discrete activities and the work needed to complete each activity within a single project.
Question
Task identification structure refers to the process of dividing a project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks.
Question
Project planning is the first phase of the project management process in which activities are performed to assess the size,scope,and complexity of the project and to establish procedures to support later project activities.
Question
The project manager is responsible for initiating,planning,executing,and closing down the project.
Question
Establishing the project initiation plan involves organizing an initial core of project team members to assist in accomplishing the project initiation activities.
Question
Project planning involves defining clear,discrete activities and the work needed to complete each activity within a single project.
Question
A systems development project may be undertaken to take advantage of business opportunities or to solve business problems.
Question
A deliverable is an end product in a phase of the SDLC.
Question
The most instrumental person to the successful completion of a project is the database analyst.
Question
A logic model is a graphical representation of a project that shows each task as a horizontal bar whose length is proportional to its time for completion.
Question
The focus of developing a communications plan activity is to collect and organize the tools that will be used while managing the project.
Question
A resource analysis plan determines if the proposed information system makes sense for the organization from an economic and operational standpoint.
Question
The project workbook serves as a repository for all project correspondence,inputs,outputs,deliverables,procedures,and standards established by the project team.
Question
When a project manager is getting projects completed through the effective utilization of resources,he/she is performing a risk and change management activity.
Question
Establishing a relationship with the customer is a project initiation activity.
Question
A Project Scope Statement is developed during the project execution phase.
Question
A slipped completion date for an activity may initiate a change to the Baseline Project Plan.
Question
A network diagram depicts project tasks and their interrelationships.
Question
A project can terminate naturally or unnaturally.
Question
Within the context of the SDLC,project closedown occurs when the design phase is completed.
Question
Projects are deemed a success or failure at project closedown.
Question
Team members are assessed as part of the conducting postproject reviews activity.
Question
The Project Scope Statement provides a detailed estimate of the project's tasks and resource requirements.
Question
The meeting minutes project team communication method has a low formality rating.
Question
Gantt charts typically do not show how tasks must be ordered.
Question
The focus of closing the customer contract activity is to ensure that all contractual terms of the project have been met.
Question
Project time estimates for task completion and overall system quality are significantly influenced by the assignment of people to tasks.
Question
The hallway discussion project team communication method has a medium to high formality rating.
Question
When executing the Baseline Project Plan,the project manager will initiate the execution of project activities,acquire and assign resources,orient and train new team members,keep the project on schedule,and assure the quality of project deliverables.
Question
Creating a work breakdown structure requires that you decompose phases into activities and activities into specific tasks.
Question
The status report project team communication method is used to inform project team members.
Question
Having a known method or technique is characteristic of a task.
Question
During the development of a preliminary schedule activity,you specify how various deliverables are produced and tested by you and your project team.
Question
During project execution,plans created in prior phases are put into action.
Question
When compared to network diagrams,Gantt charts are more useful for depicting the activities associated with large projects.
Question
Microsoft Outlook is an example of project management software.
Question
Having more iterations with fewer components to be completed is better than having only a few iterations with many components needing to be completed.
Question
In OOASD,it is better to make highly detailed plans for each iteration.
Question
When using OOASD,iterations are generally meant to be a variable length of time.
Question
A major disadvantage of the network diagram is its inability to represent completion times and show interrelationships between activities.
Question
Each separate system component is referred to as a horizontal slice of the system.
Question
One characteristic of the OOAD approach is that it tackles hard problems first.
Question
A work method is any person,group of people,piece of equipment,or material used in accomplishing an activity.
Question
If an activity's optimistic time is 4 weeks,its realistic time is 6 weeks,and its pessimistic time is 8 weeks,then its estimated time would be 6 weeks.
Question
One outcome of defining the overall system as a collection of components is the likelihood that the components constructed earlier in the project will require greater rework than those developed later in the project.
Question
Gantt charts visually show the time overlap of tasks whereas a network diagram does not show time overlap but does show which tasks could be done in parallel.
Question
Critical path scheduling is a scheduling technique in which order and duration of a sequence of task activities directly affect the completion date of a project.
Question
In order to manage the project as a series of iterations,the project manager must subdivide the project into a set of components.
Question
An activity on the critical path will have a slack time of 1.
Question
Addressing hard problems first does not mitigate risk.
Question
If an activity's optimistic time is 4 days,its realistic time is 10 days,and its pessimistic time is 25 days,then its estimated time would be 11.5 days.
Question
The ability to easily make changes to a project is a very powerful feature of most project management environments.
Question
Rework is not normally part of an OOAD project and one should be overly concerned when this happens.
Question
With OOAD project management,during each iteration all systems development lifecycle activities are performed.
Question
If an activity's optimistic time is 3 months,its realistic time is 5 months,and its pessimistic time is 10 months,then its estimated time would be 5.5 months.
Question
The phase of the project management process in which activities are performed to assess the size,scope,and complexity of the project and to establish procedures to support later project activities best defines:

A)project initiation
B)scope development
C)project planning
D)project assessment
Question
Which of the following project management activities is associated with project initiation?

A)establishing a relationship with the customer
B)describing project scope,alternatives,and feasibility
C)estimating resources and creating a detailed resource plan
D)identifying and assessing risks
Question
Developing an understanding of the content and complexity of the project is the purpose of:

A)describing the project scope,alternatives,and feasibility
B)determining project standards and procedures
C)developing a Statement Of Work
D)setting a Baseline Project Plan
Question
Influencing the activities of others toward the attainment of a common goal through the use of intelligence,personality,and abilities refers to which of the following project manager activities?

A)conflict management
B)management
C)leadership
D)team management
Question
Experienced OOSAD project managers typically use from six to nine iterations when designing and constructing a system.
Question
An on-line or hard copy repository for all project correspondence,inputs,outputs,deliverables,procedures,and standards that is used for performing project audits,orientation of new team members,communication with management and customers,identifying future projects,and performing postproject reviews is called:

A)a project workbook
B)a schedule book
C)a project planner
D)project management software
Question
Defining the necessary activities required to organize the initiation team while they are working to define the scope of the project is the focus of which of the following activities?

A)establishing the project initiation team
B)establishing management procedures
C)establishing the project initiation plan
D)establishing the project management environment and project workbook
Question
Which of the following are project management phases?

A)closing down the project
B)planning the project
C)executing the project
D)all of the above
Question
In OOSAD,during inception the primary focus is analysis,during elaboration the primary focus is design,during construction the primary focus is making the system truly operational,and during transition the primary focus is on implementation.
Question
Which of the following is not a project planning activity?

A)setting a Baseline Project Plan
B)identifying and assessing risk
C)determining project standards and procedures
D)establishing management procedures
Question
An individual with a diverse set of skills - management,leadership,technical,conflict management,and customer relationship - who is responsible for initiating,planning,executing,and closing down a project best defines:

A)systems analyst
B)consultant
C)project scheduler
D)project manager
Question
Managing conflict within a project team to assure that conflict is not too high or too low best defines which of the following project manager activities:

A)conflict management
B)leadership
C)team management
D)problem solving
Question
Arguably,the most instrumental person to the successful completion of any project is the:

A)project manager
B)chief information officer
C)department manager
D)staff consultant
Question
Identifying,assessing,and managing the risks and day-to-day changes that occur during a project best defines which of the following project manager activities:

A)conflict management
B)risk and change management
C)team management
D)problem solving
Question
Which of the following are primary reasons for undertaking systems development projects?

A)to take advantage of business opportunities
B)to solve business problems
C)to use state-of-the-art technology
D)both A and B
Question
Skills that include interpreting system requests and specifications,site preparation and user training,and contact point for customers best represent:

A)customer relations
B)conflict management
C)leadership
D)team management
Question
A controlled process of initiating,planning,executing,and closing down a project best defines:

A)systems development
B)project management
C)project development
D)systems management
Question
A planned undertaking of related activities to reach an objective that has a beginning and an end best defines:

A)task development
B)activity plan
C)project
D)task schedule
Question
Skills that include defining and sequencing activities,communicating expectations,assigning resources to activities,and monitoring outcomes best represent:

A)technical problem solving
B)management
C)leadership
D)team management
Question
The process of dividing the project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks defines:

A)task division
B)work breakdown structure
C)work structuring
D)project division
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/159
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 3: Managing the Information Systems Project
1
Gantt charts typically show how tasks must be ordered and when an activity should begin and end.
False
2
The focus of project management is to assure that systems development projects meet customer expectations and are delivered within budget and time constraints.
True
3
When a project manager works closely with customers to assure project deliverables meet expectations,he/she is performing a customer relations activity.
True
4
In order to determine the resources required for project completion,an organization should analyze the project's scope and determine the project's probability of successful completion.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
5
Task sequence depends on which tasks produce deliverables needed in other tasks,when critical resources are available,the constraints placed on the project by the client,and the process outlined in the SDLC.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
6
Project initiation is the second phase of the project management process,which focuses on defining clear,discrete activities and the work needed to complete each activity within a single project.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
7
Task identification structure refers to the process of dividing a project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
8
Project planning is the first phase of the project management process in which activities are performed to assess the size,scope,and complexity of the project and to establish procedures to support later project activities.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
9
The project manager is responsible for initiating,planning,executing,and closing down the project.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
10
Establishing the project initiation plan involves organizing an initial core of project team members to assist in accomplishing the project initiation activities.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
11
Project planning involves defining clear,discrete activities and the work needed to complete each activity within a single project.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
12
A systems development project may be undertaken to take advantage of business opportunities or to solve business problems.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
13
A deliverable is an end product in a phase of the SDLC.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
14
The most instrumental person to the successful completion of a project is the database analyst.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
15
A logic model is a graphical representation of a project that shows each task as a horizontal bar whose length is proportional to its time for completion.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
16
The focus of developing a communications plan activity is to collect and organize the tools that will be used while managing the project.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
17
A resource analysis plan determines if the proposed information system makes sense for the organization from an economic and operational standpoint.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
18
The project workbook serves as a repository for all project correspondence,inputs,outputs,deliverables,procedures,and standards established by the project team.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
19
When a project manager is getting projects completed through the effective utilization of resources,he/she is performing a risk and change management activity.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
20
Establishing a relationship with the customer is a project initiation activity.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
21
A Project Scope Statement is developed during the project execution phase.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
22
A slipped completion date for an activity may initiate a change to the Baseline Project Plan.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
23
A network diagram depicts project tasks and their interrelationships.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
24
A project can terminate naturally or unnaturally.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
25
Within the context of the SDLC,project closedown occurs when the design phase is completed.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
26
Projects are deemed a success or failure at project closedown.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
27
Team members are assessed as part of the conducting postproject reviews activity.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
28
The Project Scope Statement provides a detailed estimate of the project's tasks and resource requirements.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
29
The meeting minutes project team communication method has a low formality rating.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
30
Gantt charts typically do not show how tasks must be ordered.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
31
The focus of closing the customer contract activity is to ensure that all contractual terms of the project have been met.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
32
Project time estimates for task completion and overall system quality are significantly influenced by the assignment of people to tasks.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
33
The hallway discussion project team communication method has a medium to high formality rating.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
34
When executing the Baseline Project Plan,the project manager will initiate the execution of project activities,acquire and assign resources,orient and train new team members,keep the project on schedule,and assure the quality of project deliverables.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
35
Creating a work breakdown structure requires that you decompose phases into activities and activities into specific tasks.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
36
The status report project team communication method is used to inform project team members.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
37
Having a known method or technique is characteristic of a task.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
38
During the development of a preliminary schedule activity,you specify how various deliverables are produced and tested by you and your project team.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
39
During project execution,plans created in prior phases are put into action.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
40
When compared to network diagrams,Gantt charts are more useful for depicting the activities associated with large projects.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
41
Microsoft Outlook is an example of project management software.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
42
Having more iterations with fewer components to be completed is better than having only a few iterations with many components needing to be completed.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
43
In OOASD,it is better to make highly detailed plans for each iteration.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
44
When using OOASD,iterations are generally meant to be a variable length of time.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
45
A major disadvantage of the network diagram is its inability to represent completion times and show interrelationships between activities.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
46
Each separate system component is referred to as a horizontal slice of the system.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
47
One characteristic of the OOAD approach is that it tackles hard problems first.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
48
A work method is any person,group of people,piece of equipment,or material used in accomplishing an activity.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
49
If an activity's optimistic time is 4 weeks,its realistic time is 6 weeks,and its pessimistic time is 8 weeks,then its estimated time would be 6 weeks.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
50
One outcome of defining the overall system as a collection of components is the likelihood that the components constructed earlier in the project will require greater rework than those developed later in the project.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
51
Gantt charts visually show the time overlap of tasks whereas a network diagram does not show time overlap but does show which tasks could be done in parallel.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
52
Critical path scheduling is a scheduling technique in which order and duration of a sequence of task activities directly affect the completion date of a project.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
53
In order to manage the project as a series of iterations,the project manager must subdivide the project into a set of components.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
54
An activity on the critical path will have a slack time of 1.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
55
Addressing hard problems first does not mitigate risk.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
56
If an activity's optimistic time is 4 days,its realistic time is 10 days,and its pessimistic time is 25 days,then its estimated time would be 11.5 days.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
57
The ability to easily make changes to a project is a very powerful feature of most project management environments.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
58
Rework is not normally part of an OOAD project and one should be overly concerned when this happens.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
59
With OOAD project management,during each iteration all systems development lifecycle activities are performed.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
60
If an activity's optimistic time is 3 months,its realistic time is 5 months,and its pessimistic time is 10 months,then its estimated time would be 5.5 months.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
61
The phase of the project management process in which activities are performed to assess the size,scope,and complexity of the project and to establish procedures to support later project activities best defines:

A)project initiation
B)scope development
C)project planning
D)project assessment
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
62
Which of the following project management activities is associated with project initiation?

A)establishing a relationship with the customer
B)describing project scope,alternatives,and feasibility
C)estimating resources and creating a detailed resource plan
D)identifying and assessing risks
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
63
Developing an understanding of the content and complexity of the project is the purpose of:

A)describing the project scope,alternatives,and feasibility
B)determining project standards and procedures
C)developing a Statement Of Work
D)setting a Baseline Project Plan
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
64
Influencing the activities of others toward the attainment of a common goal through the use of intelligence,personality,and abilities refers to which of the following project manager activities?

A)conflict management
B)management
C)leadership
D)team management
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
65
Experienced OOSAD project managers typically use from six to nine iterations when designing and constructing a system.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
66
An on-line or hard copy repository for all project correspondence,inputs,outputs,deliverables,procedures,and standards that is used for performing project audits,orientation of new team members,communication with management and customers,identifying future projects,and performing postproject reviews is called:

A)a project workbook
B)a schedule book
C)a project planner
D)project management software
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
67
Defining the necessary activities required to organize the initiation team while they are working to define the scope of the project is the focus of which of the following activities?

A)establishing the project initiation team
B)establishing management procedures
C)establishing the project initiation plan
D)establishing the project management environment and project workbook
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
68
Which of the following are project management phases?

A)closing down the project
B)planning the project
C)executing the project
D)all of the above
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
69
In OOSAD,during inception the primary focus is analysis,during elaboration the primary focus is design,during construction the primary focus is making the system truly operational,and during transition the primary focus is on implementation.
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
70
Which of the following is not a project planning activity?

A)setting a Baseline Project Plan
B)identifying and assessing risk
C)determining project standards and procedures
D)establishing management procedures
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
71
An individual with a diverse set of skills - management,leadership,technical,conflict management,and customer relationship - who is responsible for initiating,planning,executing,and closing down a project best defines:

A)systems analyst
B)consultant
C)project scheduler
D)project manager
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
72
Managing conflict within a project team to assure that conflict is not too high or too low best defines which of the following project manager activities:

A)conflict management
B)leadership
C)team management
D)problem solving
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
73
Arguably,the most instrumental person to the successful completion of any project is the:

A)project manager
B)chief information officer
C)department manager
D)staff consultant
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
74
Identifying,assessing,and managing the risks and day-to-day changes that occur during a project best defines which of the following project manager activities:

A)conflict management
B)risk and change management
C)team management
D)problem solving
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
75
Which of the following are primary reasons for undertaking systems development projects?

A)to take advantage of business opportunities
B)to solve business problems
C)to use state-of-the-art technology
D)both A and B
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
76
Skills that include interpreting system requests and specifications,site preparation and user training,and contact point for customers best represent:

A)customer relations
B)conflict management
C)leadership
D)team management
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
77
A controlled process of initiating,planning,executing,and closing down a project best defines:

A)systems development
B)project management
C)project development
D)systems management
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
78
A planned undertaking of related activities to reach an objective that has a beginning and an end best defines:

A)task development
B)activity plan
C)project
D)task schedule
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
79
Skills that include defining and sequencing activities,communicating expectations,assigning resources to activities,and monitoring outcomes best represent:

A)technical problem solving
B)management
C)leadership
D)team management
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
80
The process of dividing the project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks defines:

A)task division
B)work breakdown structure
C)work structuring
D)project division
Unlock Deck
Unlock for access to all 159 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 159 flashcards in this deck.