Question
The percentage of the order that the supplier provided in the first shipment is known as the initial order lead time.
Use Space or
up arrow
down arrow
to flip the card.
Question
Production planners aggregate products into product groups to make forecasts and plans more accurate.
Question
Demand Management is the process where sales forecasts are adjusted to incorporate the impact of marketing initiatives.
Question
An ERP system is a good tool for developing and executing production plans because it integrates the functions of production planning,purchasing,materials management/warehousing,quality management,sales,and accounting.
Question
Another term for the list of ingredients required to make a product is the bill of materials.
Question
The initial fill rate measures the time needed for the supplier to fill the order.
Question
Make to order items are produced to fill customer's requests.
Question
A make-to-stock production system is where:

A)items are made for inventory in anticipation of sales orders.
B)items are produced to fill specific customer orders.
C)items are assembled for a specific customer order from an inventory of components
D)both a and c
Question
After material requirements are entered into the system,the program automatically turns the planned orders into purchase orders without further input from planners.
Question
The production plan for all finished goods is known as the MPS,or the master production schedule.
Question
In a traditional supply chain,demand information is transmitted rapidly to all members of the supply chain.
Question
Because Fitter Snacker uses large quantities of oats,the most cost-effective way to purchase oats is to buy a farm and grown them.
Question
Rough-cut planning is a common term in manufacturing for aggregate planning.
Question
The cost it normally takes to manufacture a product,which is usually derived from historical data and any changes that have occurred since then,is known as a structured cost.
Question
ERP systems are necessary to implement good supply chain management.
Question
The Sales and Operations Planning process is used to combine the sales forecast with capacity information to determine a production plan for finished goods.
Question
Lead times and lot sizing help a company determine the transfer of goods to the customer.
Question
The MRP process determines the schedule of finished goods production.
Question
The term supply chain describes all the activities required to move raw material from inventory to manufacturing for the purpose of producing a product.
Question
The percentage of the order that the supplier provides in the first shipment is known as the first-rate.
Question
What is the maximum number of cases that Fitter Snacker can produce in the month if they schedule workers for overtime on weekdays only?

A)7,666
B)9,199
C)9,582
D)10,249
Question
What is the maximum number of cases they can product in the month if they schedule workers for overtime on weekdays and Saturdays?

A)7,666
B)9,199
C)9,582
D)10,249
Question
What is the production plan for all finished goods?

A)MPS - master production schedule
B)QQR - quality query run
C)PPR - production planning run
D)RUN - run
Question
The production plan at Fitter Snacker calls for 4,134 cases of snack bars in January.If there are 22 days in the month,how many cases of snack bars should be produced in a 4-day week?

A)188
B)752
C)940
D)1034
Question
<strong>  Figure 4-2 The SAP ERP production planning process In the accompanying figure,which shows the SAP ERP production planning process,what is A?</strong> A)MRP B)Sales Forecasting C)Starting Inventory D)Detailed Scheduling <div style=padding-top: 35px>
Figure 4-2 The SAP ERP production planning process
In the accompanying figure,which shows the SAP ERP production planning process,what is A?

A)MRP
B)Sales Forecasting
C)Starting Inventory
D)Detailed Scheduling
Question
<strong>  Figure 4-2 The SAP ERP production planning process In the accompanying figure,which shows the SAP ERP production planning process,what is C?</strong> A)Starting Inventory B)Sales Forecasting C)MRP D)Detailed Scheduling <div style=padding-top: 35px>
Figure 4-2 The SAP ERP production planning process
In the accompanying figure,which shows the SAP ERP production planning process,what is C?

A)Starting Inventory
B)Sales Forecasting
C)MRP
D)Detailed Scheduling
Question
An unexpected increase in product demand can lead to:

A)a depletion of finished goods inventories
B)a depletion of raw materials inventories
C)increased overtime and transportation expenses
D)all of the above
E)both a and b
Question
What is the sales forecast for June of this year that Fitter Snacker should use?

A)6,628
B)7,128
C)6,935
D)7,143
Question
The costs normally required to manufacture a product,which are calculated from historical costs and any changes from that,are known as ____.

A)standard costs
B)abbreviated costs
C)known costs
D)estimated costs
Question
<strong>   -Immediately after MRP is run in SAP ERP:</strong> A)the stock/requirements list and MRP list are both updated and show the same information. B)the MRP list is updated but the stock/requirements list is unaffected. C)the stock/requirements list is updated but the MRP list is unaffected. D)none of the above. <div style=padding-top: 35px>

-Immediately after MRP is run in SAP ERP:

A)the stock/requirements list and MRP list are both updated and show the same information.
B)the MRP list is updated but the stock/requirements list is unaffected.
C)the stock/requirements list is updated but the MRP list is unaffected.
D)none of the above.
Question
In detailed scheduling,longer production runs of a particular product:

A)increases the available capacity by reducing the frequency of setups.
B)increases finished goods inventory levels.
C)reduces finished goods inventory levels.
D)both a and b
E)both a and c
Question
What metric tracks the number of times a supplier meets the agreed upon delivery date?

A)initial fill rate
B)initial order lead time
C)on-time performance
D)cash-to-cash cycle time
Question
____ are disaggregated to generate detailed production schedules.

A)Bills of materials
B)Production runs
C)Internet sales orders
D)Rough-cut plans
Question
The production plan for Fitter Snacker calls for 7000 cases of the snack bar product group in June.If the snack bar product group consists of NRG-A and NRG-B bars with the proportion 70% NRG-A bars and 30% NRG-B bars,how many NRG-A bars should be produced in June?

A)500
B)2100
C)4900
D)7000
Question
What process answers the question "What do we need to order to produce the product,and when do we need to order these raw materials?"

A)SF - sales forecasting
B)SOP - sales and operations planning
C)MRP - materials requirements planning
D)DS - detailed scheduling
Question
<strong>  Figure 4-2 The SAP ERP production planning process In the accompanying figure,which shows the SAP ERP production planning process,what is D?</strong> A)Starting Inventory B)Detailed Scheduling C)Sales Forecasting D)MRP <div style=padding-top: 35px>
Figure 4-2 The SAP ERP production planning process
In the accompanying figure,which shows the SAP ERP production planning process,what is D?

A)Starting Inventory
B)Detailed Scheduling
C)Sales Forecasting
D)MRP
Question
The order of the steps in the SAP R/3 production planning process are:

A)Sales Forecasting,Demand Management,Purchasing,Sales and Operations Planning,MRP,Detailed scheduling,Production
B)Sales Forecasting,Demand Planning,Detailed scheduling,Purchasing,Demand Management,MRP,Production
C)Sales and Operations Planning,Sales Forecasting,MRP,Purchasing,Demand Management,Detailed scheduling,Production
D)Sales Forecasting,Sales and Operations Planning,Demand Management,MRP,Purchasing,Detailed scheduling,Production
Question
<strong>   -What Planned Orders will the MRP logic create?</strong> A)An order for 44,000 units in week 2 B)An order for 44,000 units in week 3 C)An order for 44,000 units for weeks 2 and 3 D)An order for 88,000 units for week 3 <div style=padding-top: 35px>

-What Planned Orders will the MRP logic create?

A)An order for 44,000 units in week 2
B)An order for 44,000 units in week 3
C)An order for 44,000 units for weeks 2 and 3
D)An order for 88,000 units for week 3
Question
<strong>  Figure 4-2 The SAP ERP production planning process In the accompanying figure,which shows the SAP ERP production planning process,what is B?</strong> A)Starting Inventory B)Detailed Scheduling C)Sales Forecasting D)MRP <div style=padding-top: 35px>
Figure 4-2 The SAP ERP production planning process
In the accompanying figure,which shows the SAP ERP production planning process,what is B?

A)Starting Inventory
B)Detailed Scheduling
C)Sales Forecasting
D)MRP
Question
<strong>   -What will the On Hand inventory be in week 5 after the system calculated planned orders?</strong> A)0 B)440 C)8,038 D)14,038 <div style=padding-top: 35px>

-What will the On Hand inventory be in week 5 after the system calculated planned orders?

A)0
B)440
C)8,038
D)14,038
Question
____________________ refers to the process of determining production quantities (for raw materials produced in-house)and order quantities (for purchased items).
Question
Figure 4-1 Fitter Snacker's manufacturing process
Figure 4-1 Fitter Snacker's manufacturing process   Describe Fitter Snacker's communication problems with regard to the production process.<div style=padding-top: 35px>
Describe Fitter Snacker's communication problems with regard to the production process.
Question
Figure 4-1 Fitter Snacker's manufacturing process
Figure 4-1 Fitter Snacker's manufacturing process   Describe Fitter Snacker's inventory problems with regard to their production process.<div style=padding-top: 35px>
Describe Fitter Snacker's inventory problems with regard to their production process.
Question
COMPLETION
COMPLETION   The ____________________,shown in the accompanying figure for Fitter Snacker,is a list of the materials needed to make NRG-A and NRG-B bars.<div style=padding-top: 35px>
The ____________________,shown in the accompanying figure for Fitter Snacker,is a list of the materials needed to make NRG-A and NRG-B bars.
Question
Match between columns
What is G?
Sales Forecasting
What is G?
Starting Inventory
What is G?
Sales and Operations Planning
What is G?
Demand Management
What is G?
MRP
What is G?
Detailed Scheduling
What is G?
Purchasing
What is G?
Production
What is E?
Sales Forecasting
What is E?
Starting Inventory
What is E?
Sales and Operations Planning
What is E?
Demand Management
What is E?
MRP
What is E?
Detailed Scheduling
What is E?
Purchasing
What is E?
Production
What is A?
Sales Forecasting
What is A?
Starting Inventory
What is A?
Sales and Operations Planning
What is A?
Demand Management
What is A?
MRP
What is A?
Detailed Scheduling
What is A?
Purchasing
What is A?
Production
What is B?
Sales Forecasting
What is B?
Starting Inventory
What is B?
Sales and Operations Planning
What is B?
Demand Management
What is B?
MRP
What is B?
Detailed Scheduling
What is B?
Purchasing
What is B?
Production
What is C?
Sales Forecasting
What is C?
Starting Inventory
What is C?
Sales and Operations Planning
What is C?
Demand Management
What is C?
MRP
What is C?
Detailed Scheduling
What is C?
Purchasing
What is C?
Production
What is D?
Sales Forecasting
What is D?
Starting Inventory
What is D?
Sales and Operations Planning
What is D?
Demand Management
What is D?
MRP
What is D?
Detailed Scheduling
What is D?
Purchasing
What is D?
Production
What is F?
Sales Forecasting
What is F?
Starting Inventory
What is F?
Sales and Operations Planning
What is F?
Demand Management
What is F?
MRP
What is F?
Detailed Scheduling
What is F?
Purchasing
What is F?
Production
What is H?
Sales Forecasting
What is H?
Starting Inventory
What is H?
Sales and Operations Planning
What is H?
Demand Management
What is H?
MRP
What is H?
Detailed Scheduling
What is H?
Purchasing
What is H?
Production
Question
List and explain each step of the production planning process.
Question
How can data be entered into the SAP ERP system on the shop floor?
Question
What stage of the production planning process splits Fitter Snacker's monthly production planning values into finer time periods?

A)Sales Forecasting
B)BOM
C)MRP
D)Demand Management
Question
What is repetitive manufacturing?
Question
Figure 4-1 Fitter Snacker's manufacturing process
Figure 4-1 Fitter Snacker's manufacturing process   Describe Fitter Snacker's accounting and purchasing problems with regard to its production process.<div style=padding-top: 35px>
Describe Fitter Snacker's accounting and purchasing problems with regard to its production process.
Question
When might the SAP ERP system block the entry of the receipt of goods in the receiving department?
Question
What are the three principles that production planners follow?
Question
What are the three general approaches to production?
Question
Explain Fitter Snacker's manufacturing process as shown in the accompanying figure:
Figure 4-1 Fitter Snacker's manufacturing process
Explain Fitter Snacker's manufacturing process as shown in the accompanying figure: Figure 4-1 Fitter Snacker's manufacturing process  <div style=padding-top: 35px>
Question
SAP can provide sophisticated tools to support sales and operations planning.Is that all that is necessary for a company to be successful? Support your answer by discussing the departments of marketing and manufacturing.
Question
Describe the measurements of success with Supply Chain Management.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/56
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 4: Production and Supply Chain Management Information Systems
1
The percentage of the order that the supplier provided in the first shipment is known as the initial order lead time.
False
2
Production planners aggregate products into product groups to make forecasts and plans more accurate.
False
3
Demand Management is the process where sales forecasts are adjusted to incorporate the impact of marketing initiatives.
False
4
An ERP system is a good tool for developing and executing production plans because it integrates the functions of production planning,purchasing,materials management/warehousing,quality management,sales,and accounting.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
5
Another term for the list of ingredients required to make a product is the bill of materials.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
6
The initial fill rate measures the time needed for the supplier to fill the order.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
7
Make to order items are produced to fill customer's requests.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
8
A make-to-stock production system is where:

A)items are made for inventory in anticipation of sales orders.
B)items are produced to fill specific customer orders.
C)items are assembled for a specific customer order from an inventory of components
D)both a and c
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
9
After material requirements are entered into the system,the program automatically turns the planned orders into purchase orders without further input from planners.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
10
The production plan for all finished goods is known as the MPS,or the master production schedule.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
11
In a traditional supply chain,demand information is transmitted rapidly to all members of the supply chain.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
12
Because Fitter Snacker uses large quantities of oats,the most cost-effective way to purchase oats is to buy a farm and grown them.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
13
Rough-cut planning is a common term in manufacturing for aggregate planning.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
14
The cost it normally takes to manufacture a product,which is usually derived from historical data and any changes that have occurred since then,is known as a structured cost.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
15
ERP systems are necessary to implement good supply chain management.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
16
The Sales and Operations Planning process is used to combine the sales forecast with capacity information to determine a production plan for finished goods.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
17
Lead times and lot sizing help a company determine the transfer of goods to the customer.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
18
The MRP process determines the schedule of finished goods production.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
19
The term supply chain describes all the activities required to move raw material from inventory to manufacturing for the purpose of producing a product.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
20
The percentage of the order that the supplier provides in the first shipment is known as the first-rate.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
21
What is the maximum number of cases that Fitter Snacker can produce in the month if they schedule workers for overtime on weekdays only?

A)7,666
B)9,199
C)9,582
D)10,249
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
22
What is the maximum number of cases they can product in the month if they schedule workers for overtime on weekdays and Saturdays?

A)7,666
B)9,199
C)9,582
D)10,249
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
23
What is the production plan for all finished goods?

A)MPS - master production schedule
B)QQR - quality query run
C)PPR - production planning run
D)RUN - run
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
24
The production plan at Fitter Snacker calls for 4,134 cases of snack bars in January.If there are 22 days in the month,how many cases of snack bars should be produced in a 4-day week?

A)188
B)752
C)940
D)1034
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
25
<strong>  Figure 4-2 The SAP ERP production planning process In the accompanying figure,which shows the SAP ERP production planning process,what is A?</strong> A)MRP B)Sales Forecasting C)Starting Inventory D)Detailed Scheduling
Figure 4-2 The SAP ERP production planning process
In the accompanying figure,which shows the SAP ERP production planning process,what is A?

A)MRP
B)Sales Forecasting
C)Starting Inventory
D)Detailed Scheduling
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
26
<strong>  Figure 4-2 The SAP ERP production planning process In the accompanying figure,which shows the SAP ERP production planning process,what is C?</strong> A)Starting Inventory B)Sales Forecasting C)MRP D)Detailed Scheduling
Figure 4-2 The SAP ERP production planning process
In the accompanying figure,which shows the SAP ERP production planning process,what is C?

A)Starting Inventory
B)Sales Forecasting
C)MRP
D)Detailed Scheduling
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
27
An unexpected increase in product demand can lead to:

A)a depletion of finished goods inventories
B)a depletion of raw materials inventories
C)increased overtime and transportation expenses
D)all of the above
E)both a and b
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
28
What is the sales forecast for June of this year that Fitter Snacker should use?

A)6,628
B)7,128
C)6,935
D)7,143
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
29
The costs normally required to manufacture a product,which are calculated from historical costs and any changes from that,are known as ____.

A)standard costs
B)abbreviated costs
C)known costs
D)estimated costs
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
30
<strong>   -Immediately after MRP is run in SAP ERP:</strong> A)the stock/requirements list and MRP list are both updated and show the same information. B)the MRP list is updated but the stock/requirements list is unaffected. C)the stock/requirements list is updated but the MRP list is unaffected. D)none of the above.

-Immediately after MRP is run in SAP ERP:

A)the stock/requirements list and MRP list are both updated and show the same information.
B)the MRP list is updated but the stock/requirements list is unaffected.
C)the stock/requirements list is updated but the MRP list is unaffected.
D)none of the above.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
31
In detailed scheduling,longer production runs of a particular product:

A)increases the available capacity by reducing the frequency of setups.
B)increases finished goods inventory levels.
C)reduces finished goods inventory levels.
D)both a and b
E)both a and c
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
32
What metric tracks the number of times a supplier meets the agreed upon delivery date?

A)initial fill rate
B)initial order lead time
C)on-time performance
D)cash-to-cash cycle time
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
33
____ are disaggregated to generate detailed production schedules.

A)Bills of materials
B)Production runs
C)Internet sales orders
D)Rough-cut plans
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
34
The production plan for Fitter Snacker calls for 7000 cases of the snack bar product group in June.If the snack bar product group consists of NRG-A and NRG-B bars with the proportion 70% NRG-A bars and 30% NRG-B bars,how many NRG-A bars should be produced in June?

A)500
B)2100
C)4900
D)7000
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
35
What process answers the question "What do we need to order to produce the product,and when do we need to order these raw materials?"

A)SF - sales forecasting
B)SOP - sales and operations planning
C)MRP - materials requirements planning
D)DS - detailed scheduling
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
36
<strong>  Figure 4-2 The SAP ERP production planning process In the accompanying figure,which shows the SAP ERP production planning process,what is D?</strong> A)Starting Inventory B)Detailed Scheduling C)Sales Forecasting D)MRP
Figure 4-2 The SAP ERP production planning process
In the accompanying figure,which shows the SAP ERP production planning process,what is D?

A)Starting Inventory
B)Detailed Scheduling
C)Sales Forecasting
D)MRP
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
37
The order of the steps in the SAP R/3 production planning process are:

A)Sales Forecasting,Demand Management,Purchasing,Sales and Operations Planning,MRP,Detailed scheduling,Production
B)Sales Forecasting,Demand Planning,Detailed scheduling,Purchasing,Demand Management,MRP,Production
C)Sales and Operations Planning,Sales Forecasting,MRP,Purchasing,Demand Management,Detailed scheduling,Production
D)Sales Forecasting,Sales and Operations Planning,Demand Management,MRP,Purchasing,Detailed scheduling,Production
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
38
<strong>   -What Planned Orders will the MRP logic create?</strong> A)An order for 44,000 units in week 2 B)An order for 44,000 units in week 3 C)An order for 44,000 units for weeks 2 and 3 D)An order for 88,000 units for week 3

-What Planned Orders will the MRP logic create?

A)An order for 44,000 units in week 2
B)An order for 44,000 units in week 3
C)An order for 44,000 units for weeks 2 and 3
D)An order for 88,000 units for week 3
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
39
<strong>  Figure 4-2 The SAP ERP production planning process In the accompanying figure,which shows the SAP ERP production planning process,what is B?</strong> A)Starting Inventory B)Detailed Scheduling C)Sales Forecasting D)MRP
Figure 4-2 The SAP ERP production planning process
In the accompanying figure,which shows the SAP ERP production planning process,what is B?

A)Starting Inventory
B)Detailed Scheduling
C)Sales Forecasting
D)MRP
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
40
<strong>   -What will the On Hand inventory be in week 5 after the system calculated planned orders?</strong> A)0 B)440 C)8,038 D)14,038

-What will the On Hand inventory be in week 5 after the system calculated planned orders?

A)0
B)440
C)8,038
D)14,038
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
41
____________________ refers to the process of determining production quantities (for raw materials produced in-house)and order quantities (for purchased items).
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
42
Figure 4-1 Fitter Snacker's manufacturing process
Figure 4-1 Fitter Snacker's manufacturing process   Describe Fitter Snacker's communication problems with regard to the production process.
Describe Fitter Snacker's communication problems with regard to the production process.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
43
Figure 4-1 Fitter Snacker's manufacturing process
Figure 4-1 Fitter Snacker's manufacturing process   Describe Fitter Snacker's inventory problems with regard to their production process.
Describe Fitter Snacker's inventory problems with regard to their production process.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
44
COMPLETION
COMPLETION   The ____________________,shown in the accompanying figure for Fitter Snacker,is a list of the materials needed to make NRG-A and NRG-B bars.
The ____________________,shown in the accompanying figure for Fitter Snacker,is a list of the materials needed to make NRG-A and NRG-B bars.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
45
Match between columns
What is G?
Sales Forecasting
What is G?
Starting Inventory
What is G?
Sales and Operations Planning
What is G?
Demand Management
What is G?
MRP
What is G?
Detailed Scheduling
What is G?
Purchasing
What is G?
Production
What is E?
Sales Forecasting
What is E?
Starting Inventory
What is E?
Sales and Operations Planning
What is E?
Demand Management
What is E?
MRP
What is E?
Detailed Scheduling
What is E?
Purchasing
What is E?
Production
What is A?
Sales Forecasting
What is A?
Starting Inventory
What is A?
Sales and Operations Planning
What is A?
Demand Management
What is A?
MRP
What is A?
Detailed Scheduling
What is A?
Purchasing
What is A?
Production
What is B?
Sales Forecasting
What is B?
Starting Inventory
What is B?
Sales and Operations Planning
What is B?
Demand Management
What is B?
MRP
What is B?
Detailed Scheduling
What is B?
Purchasing
What is B?
Production
What is C?
Sales Forecasting
What is C?
Starting Inventory
What is C?
Sales and Operations Planning
What is C?
Demand Management
What is C?
MRP
What is C?
Detailed Scheduling
What is C?
Purchasing
What is C?
Production
What is D?
Sales Forecasting
What is D?
Starting Inventory
What is D?
Sales and Operations Planning
What is D?
Demand Management
What is D?
MRP
What is D?
Detailed Scheduling
What is D?
Purchasing
What is D?
Production
What is F?
Sales Forecasting
What is F?
Starting Inventory
What is F?
Sales and Operations Planning
What is F?
Demand Management
What is F?
MRP
What is F?
Detailed Scheduling
What is F?
Purchasing
What is F?
Production
What is H?
Sales Forecasting
What is H?
Starting Inventory
What is H?
Sales and Operations Planning
What is H?
Demand Management
What is H?
MRP
What is H?
Detailed Scheduling
What is H?
Purchasing
What is H?
Production
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
46
List and explain each step of the production planning process.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
47
How can data be entered into the SAP ERP system on the shop floor?
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
48
What stage of the production planning process splits Fitter Snacker's monthly production planning values into finer time periods?

A)Sales Forecasting
B)BOM
C)MRP
D)Demand Management
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
49
What is repetitive manufacturing?
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
50
Figure 4-1 Fitter Snacker's manufacturing process
Figure 4-1 Fitter Snacker's manufacturing process   Describe Fitter Snacker's accounting and purchasing problems with regard to its production process.
Describe Fitter Snacker's accounting and purchasing problems with regard to its production process.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
51
When might the SAP ERP system block the entry of the receipt of goods in the receiving department?
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
52
What are the three principles that production planners follow?
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
53
What are the three general approaches to production?
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
54
Explain Fitter Snacker's manufacturing process as shown in the accompanying figure:
Figure 4-1 Fitter Snacker's manufacturing process
Explain Fitter Snacker's manufacturing process as shown in the accompanying figure: Figure 4-1 Fitter Snacker's manufacturing process
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
55
SAP can provide sophisticated tools to support sales and operations planning.Is that all that is necessary for a company to be successful? Support your answer by discussing the departments of marketing and manufacturing.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
56
Describe the measurements of success with Supply Chain Management.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 56 flashcards in this deck.