Deck 2: Project Methodologies and Processes

Full screen (f)
exit full mode
Question
Although projects follow a project life cycle, the development of new products, services, or information systems follow a product life cycle.
Use Space or
up arrow
down arrow
to flip the card.
Question
A project plan includes which of the following:

A) Project Objectives
B) Resources
C) Controls
D) All of these
E) None of these
Question
Under PRINCE2, the Project Board is accountable for the project's success or failure.
Question
A methodology provides a systematic way to plan, manage, and execute projects.
Question
The integration of project management and systems development activities is one important component that distinguishes IT projects form other types of projects
Question
Contract closure ensures that all of the deliverables and agreed upon terms of the project have been completed and delivered.
Question
PRINCE2 is similar to the PMBOK Guide in that it follows the project life cycle and provides stakeholders with a common language and approach to managing projects.
Question
Breaking a project down into phases increases the complexity and project risk.
Question
The Project Management Body of Knowledge

A) is a method of ensuring project success.
B) must be used on all projects.
C) is a generally accepted set of principles and practices for project management.
D) must be used in its entirety.
E) works the same on all projects.
Question
The PMBOK are called project cost management includes estimate costs, determine budget, and control costs.
Question
PRINCE2 was originally developed for government projects in the United States.
Question
A project's scope is primarily a list of resources available to the project team.
Question
The Project Management Body of Knowledge (PMBOK) and PRojects IN Controlled Environments (PRINCE2) are two popular and widely used project management methodologies.
Question
Under PRINCE2, any proposed changes to the project that the user wants should be approved and included.
Question
PMBOK views project integration management as one of the most important because it coordinates the other nine knowledge areas.
Question
The four phases of a learning cycle include: Understand and frame the problem, plan, act, reflect and learn.
Question
Fast tracking is defined as starting the next phase of a project before the current phase is complete.
Question
The following are PMBOK knowledge areas except:

A) Project Integration Management
B) Project Scope Management
C) Project Cost Management
D) Project Risk Management
E) Project Research Management
Question
Waterfall is an iterative development approach while Agile is a structured development approach.
Question
Project management processes include Scope, Schedule, Budget, and Quality.
Question
Project Scope Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) provides assurance that the project's work is defined accurately and completed as planned.
D) focuses on identifying and responding appropriately to risks that can impact the project.
E) is concerned with acquiring project resources that are outside the organization.
Question
Product-oriented processes will define all of the sub-phases and deliverables associated with the ______ project management life cycle phase.

A) conceptualize and initialize the project
B) develop the project charter and plan
C) execute and control
D) close project
E) evaluate project success
Question
Project Procurement Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) focuses on identifying and responding appropriately to risks that can impact the project.
E) is concerned with acquiring project resources that are outside the organization.
Question
Project Human Resource Management

A) focuses on creating and developing the project team.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) focuses on identifying and responding appropriately to risks that can impact the project.
E) is concerned with acquiring project resources that are outside the organization.
Question
Project Risk Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) focuses on identifying and responding appropriately to risks that can impact the project.
E) is concerned with acquiring project resources that are outside the organization.
Question
Project Communications Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) entails providing timely and accurate information about the project to stakeholders.
E) is concerned with acquiring project resources that are outside the organization.
Question
The phases of a learning cycle include all of the following except:

A) Act
B) Assess risk
C) Reflect and learn
D) Plan
E) Understand and frame problem
Question
Closing processes:

A) Signal the beginning of the project or phase.
B) formally accepts the project's product, service, or end result so the project or phase can be brought to an orderly close.
C) focus on integrating people and resources to carry out the planned activities.
D) supports planning of the entire project and each individual phase
E) allows for managing and measuring progress toward the project's MOV and scope, schedule, budget, and quality objectives.
Question
What are the advantages of having and following a project methodology?
Question
Project Time Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) focuses on identifying and responding appropriately to risks that can impact the project.
E) is concerned with acquiring project resources that are outside the organization.
Question
Project Integration Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) focuses on identifying and responding appropriately to risks that can impact the project.
E) is concerned with acquiring project resources that are outside the organization.
Question
Monitoring and controlling processes:

A) Signal the beginning of the project or phase.
B) Requires an organization to make a commitment of time and resources.
C) focus on integrating people and resources to carry out the planned activities.
D) supports planning of the entire project and each individual phase
E) allows for managing and measuring progress toward the project's MOV and scope, schedule, budget, and quality objectives.
Question
Project Quality Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) focuses on identifying and responding appropriately to risks that can impact the project.
E) is concerned with acquiring project resources that are outside the organization.
Question
Executing processes:

A) Signal the beginning of the project or phase.
B) Requires an organization to make a commitment of time and resources.
C) focus on integrating people and resources to carry out the planned activities.
D) supports planning of the entire project and each individual phase
E) none of these
Question
The PMBOK area called project time management includes all of the following except:

A) Define Activities
B) Assign Activities
C) Estimate Activity Durations
D) Develop Schedule
E) Control Schedule
Question
Initiating processes:

A) Signal the beginning of the project or phase.
B) Requires an organization to make a commitment of time and resources.
C) Are part of the project management processes and ITPM phases.
D) all of these
E) none of these
Question
The following are components of the Agile Manifesto except:

A) User Involvement over Cost of Project
B) Individuals and Interactions over Processes and Tools
C) Working Software over Comprehensive Documentation
D) Customer Collaboration over Contract Negotiation
E) Responding to Change over Following a Plan
Question
Project Cost Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) assures that the project budget is developed and completed as approved.
E) is concerned with acquiring project resources that are outside the organization.
Question
Planning processes:

A) Signal the beginning of the project or phase.
B) Requires an organization to make a commitment of time and resources.
C) Are part of the project management processes and ITPM phases.
D) supports planning of the entire project and each individual phase
E) none of these
Question
Planning, executing, and monitoring and controlling are examples of:

A) Project Management process groups.
B) Project Management tools.
C) PMBOK areas of knowledge
D) Project Management objectives
E) Project Management infrastructure.
Question
What is a project methodology?
Question
What is a stakeholder?
Question
John Redding suggests that a team learning cycle has four phases.What are they?
Question
Describe the seven processes of the PRINCE2 methodology.
Question
What is a project's scope?
Question
Describe the five basic phases in the systems development life cycle.
Question
What purpose does creating a lessons learned at the end of a learning cycle provide?
Question
List and describe the four themes (or categories) of the Agile principles.
Question
What are product-oriented processes? Give one example.
Question
What are project management processes? Give one example.
Question
List the five Project Management Process Groups and describe how they support the phases of the project life cycle.
Question
What are the three important roles included a Project Board under the PRINCE2 methodology.
Question
Describe the five project management process groups.
Question
List and describe the five common phases or stages shared by most projects?
Question
Describe the three important roles under Scrum, one of the Agile methods.
Question
Describe project integration management and its relationship to the other eight Project Management Body of Knowledge areas.
Question
Describe the PMBOK area of project time management.
Question
Describe the concept of a learning cycle.
Question
Describe the phases of the project life cycle.
Question
Describe the PMBOK area of project cost management.
Question
The Guide to Project Management Body of Knowledge defines ten knowledge areas for understanding project management. Name and briefly describe five of them.
Question
Describe the phases of a learning cycle and discuss the potential impact of its use on organizations.
Question
The Guide to Project Management Body of Knowledge defines a process as "a set of interrelated actions and activities performed to achieve a pre-specified product, result, or service".In your own words, state what this definition means and give an example.
Question
What are the seven principles that must be followed in order to be considered a PRINCE2 project?
Question
How should proposed changes in the project be handled and what are the relevant criteria for change decisions?
Question
How do the project life cycle (PLC) and the systems development life cycle (SDLC) differ?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/66
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 2: Project Methodologies and Processes
1
Although projects follow a project life cycle, the development of new products, services, or information systems follow a product life cycle.
True
2
A project plan includes which of the following:

A) Project Objectives
B) Resources
C) Controls
D) All of these
E) None of these
D
3
Under PRINCE2, the Project Board is accountable for the project's success or failure.
True
4
A methodology provides a systematic way to plan, manage, and execute projects.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
5
The integration of project management and systems development activities is one important component that distinguishes IT projects form other types of projects
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
6
Contract closure ensures that all of the deliverables and agreed upon terms of the project have been completed and delivered.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
7
PRINCE2 is similar to the PMBOK Guide in that it follows the project life cycle and provides stakeholders with a common language and approach to managing projects.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
8
Breaking a project down into phases increases the complexity and project risk.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
9
The Project Management Body of Knowledge

A) is a method of ensuring project success.
B) must be used on all projects.
C) is a generally accepted set of principles and practices for project management.
D) must be used in its entirety.
E) works the same on all projects.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
10
The PMBOK are called project cost management includes estimate costs, determine budget, and control costs.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
11
PRINCE2 was originally developed for government projects in the United States.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
12
A project's scope is primarily a list of resources available to the project team.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
13
The Project Management Body of Knowledge (PMBOK) and PRojects IN Controlled Environments (PRINCE2) are two popular and widely used project management methodologies.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
14
Under PRINCE2, any proposed changes to the project that the user wants should be approved and included.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
15
PMBOK views project integration management as one of the most important because it coordinates the other nine knowledge areas.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
16
The four phases of a learning cycle include: Understand and frame the problem, plan, act, reflect and learn.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
17
Fast tracking is defined as starting the next phase of a project before the current phase is complete.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
18
The following are PMBOK knowledge areas except:

A) Project Integration Management
B) Project Scope Management
C) Project Cost Management
D) Project Risk Management
E) Project Research Management
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
19
Waterfall is an iterative development approach while Agile is a structured development approach.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
20
Project management processes include Scope, Schedule, Budget, and Quality.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
21
Project Scope Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) provides assurance that the project's work is defined accurately and completed as planned.
D) focuses on identifying and responding appropriately to risks that can impact the project.
E) is concerned with acquiring project resources that are outside the organization.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
22
Product-oriented processes will define all of the sub-phases and deliverables associated with the ______ project management life cycle phase.

A) conceptualize and initialize the project
B) develop the project charter and plan
C) execute and control
D) close project
E) evaluate project success
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
23
Project Procurement Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) focuses on identifying and responding appropriately to risks that can impact the project.
E) is concerned with acquiring project resources that are outside the organization.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
24
Project Human Resource Management

A) focuses on creating and developing the project team.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) focuses on identifying and responding appropriately to risks that can impact the project.
E) is concerned with acquiring project resources that are outside the organization.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
25
Project Risk Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) focuses on identifying and responding appropriately to risks that can impact the project.
E) is concerned with acquiring project resources that are outside the organization.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
26
Project Communications Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) entails providing timely and accurate information about the project to stakeholders.
E) is concerned with acquiring project resources that are outside the organization.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
27
The phases of a learning cycle include all of the following except:

A) Act
B) Assess risk
C) Reflect and learn
D) Plan
E) Understand and frame problem
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
28
Closing processes:

A) Signal the beginning of the project or phase.
B) formally accepts the project's product, service, or end result so the project or phase can be brought to an orderly close.
C) focus on integrating people and resources to carry out the planned activities.
D) supports planning of the entire project and each individual phase
E) allows for managing and measuring progress toward the project's MOV and scope, schedule, budget, and quality objectives.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
29
What are the advantages of having and following a project methodology?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
30
Project Time Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) focuses on identifying and responding appropriately to risks that can impact the project.
E) is concerned with acquiring project resources that are outside the organization.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
31
Project Integration Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) focuses on identifying and responding appropriately to risks that can impact the project.
E) is concerned with acquiring project resources that are outside the organization.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
32
Monitoring and controlling processes:

A) Signal the beginning of the project or phase.
B) Requires an organization to make a commitment of time and resources.
C) focus on integrating people and resources to carry out the planned activities.
D) supports planning of the entire project and each individual phase
E) allows for managing and measuring progress toward the project's MOV and scope, schedule, budget, and quality objectives.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
33
Project Quality Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) focuses on identifying and responding appropriately to risks that can impact the project.
E) is concerned with acquiring project resources that are outside the organization.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
34
Executing processes:

A) Signal the beginning of the project or phase.
B) Requires an organization to make a commitment of time and resources.
C) focus on integrating people and resources to carry out the planned activities.
D) supports planning of the entire project and each individual phase
E) none of these
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
35
The PMBOK area called project time management includes all of the following except:

A) Define Activities
B) Assign Activities
C) Estimate Activity Durations
D) Develop Schedule
E) Control Schedule
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
36
Initiating processes:

A) Signal the beginning of the project or phase.
B) Requires an organization to make a commitment of time and resources.
C) Are part of the project management processes and ITPM phases.
D) all of these
E) none of these
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
37
The following are components of the Agile Manifesto except:

A) User Involvement over Cost of Project
B) Individuals and Interactions over Processes and Tools
C) Working Software over Comprehensive Documentation
D) Customer Collaboration over Contract Negotiation
E) Responding to Change over Following a Plan
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
38
Project Cost Management

A) focuses on coordinating the project plan's development, execution, and control of changes.
B) includes identifying the project phases and activities and estimating, sequencing, and assigning resources.
C) focuses on planning, developing, and managing the quality environment allowing the project to meet or exceed stakeholder expectations.
D) assures that the project budget is developed and completed as approved.
E) is concerned with acquiring project resources that are outside the organization.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
39
Planning processes:

A) Signal the beginning of the project or phase.
B) Requires an organization to make a commitment of time and resources.
C) Are part of the project management processes and ITPM phases.
D) supports planning of the entire project and each individual phase
E) none of these
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
40
Planning, executing, and monitoring and controlling are examples of:

A) Project Management process groups.
B) Project Management tools.
C) PMBOK areas of knowledge
D) Project Management objectives
E) Project Management infrastructure.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
41
What is a project methodology?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
42
What is a stakeholder?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
43
John Redding suggests that a team learning cycle has four phases.What are they?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
44
Describe the seven processes of the PRINCE2 methodology.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
45
What is a project's scope?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
46
Describe the five basic phases in the systems development life cycle.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
47
What purpose does creating a lessons learned at the end of a learning cycle provide?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
48
List and describe the four themes (or categories) of the Agile principles.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
49
What are product-oriented processes? Give one example.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
50
What are project management processes? Give one example.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
51
List the five Project Management Process Groups and describe how they support the phases of the project life cycle.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
52
What are the three important roles included a Project Board under the PRINCE2 methodology.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
53
Describe the five project management process groups.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
54
List and describe the five common phases or stages shared by most projects?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
55
Describe the three important roles under Scrum, one of the Agile methods.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
56
Describe project integration management and its relationship to the other eight Project Management Body of Knowledge areas.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
57
Describe the PMBOK area of project time management.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
58
Describe the concept of a learning cycle.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
59
Describe the phases of the project life cycle.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
60
Describe the PMBOK area of project cost management.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
61
The Guide to Project Management Body of Knowledge defines ten knowledge areas for understanding project management. Name and briefly describe five of them.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
62
Describe the phases of a learning cycle and discuss the potential impact of its use on organizations.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
63
The Guide to Project Management Body of Knowledge defines a process as "a set of interrelated actions and activities performed to achieve a pre-specified product, result, or service".In your own words, state what this definition means and give an example.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
64
What are the seven principles that must be followed in order to be considered a PRINCE2 project?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
65
How should proposed changes in the project be handled and what are the relevant criteria for change decisions?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
66
How do the project life cycle (PLC) and the systems development life cycle (SDLC) differ?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 66 flashcards in this deck.