Deck 4: Production and Supply Chain Management Information Systems

Full screen (f)
exit full mode
Question
Lead times and lot sizing help a company determine the transfer of goods to the customer.
Use Space or
up arrow
down arrow
to flip the card.
Question
ERP systems are necessary to implement good supply chain management.
Question
The percentage of the order that the supplier provides in the first shipment is known as the first-rate.
Question
Make to order items are produced to fill customer's requests.
Question
Demand Management in the SAP R/3 system is the process where sales forecasts are adjusted to incorporate the impact of marketing initiatives.
Question
In a traditional supply chain,demand information is transmitted rapidly to all members of the supply chain.
Question
The MRP process determines the schedule of finished goods production.
Question
Good production decisions can be made knowing only the current level of finished goods inventory.
Question
Supply Chain Management is as much an approach to doing business with suppliers as it is a technology.
Question
The cost it normally takes to manufacture a product,which is usually derived from historical data and any changes that have occurred since then,is known as a structured cost.
Question
The percentage of the order that the supplier provided in the first shipment is known as the initial order lead time.
Question
The production plan for all finished goods is known as the MPS,or the master production schedule.
Question
Production planners aggregate products into product groups to make forecasts and plans more accurate.
Question
Because Fitter Snacker uses large quantities of oats,the most cost-effective way to purchase oats is to buy a farm and grown them.
Question
A make-to-stock production system is one where:

A) Items are made for inventory in anticipation of sales orders
B) Items are produced to fill specific customer orders
C) Items are assembled for a specific customer order from an inventory of components
D) Both a and c
Question
Another term for the recipe of a product is the bill of materials.
Question
Because Fitter Snacker uses large quantities of oats,the most cost-effective way to puchase oats is in bulk hopper-truck quantities,which means that the material must be ordered in 44,000 pound quantities.
Question
Rough-cut planning is a common term in manufacturing for aggregate planning.
Question
The initial fill rate measures the time needed for the supplier to fill the order.
Question
The Sales and Operations Planning process is used to combine the sales forecast with capacity information to determine a production plan for finished goods.
Question
After MRP is run in the SAP R/3 system:

A) The stock/requirements list and MRP list are both updated and show the same information.
B) The MRP list is updated but the stock/requirements list is unaffected.
C) The stock/requirements list is updated but the MRP list is unaffected
D) None of the above.
Question
In the following figure,what is B? <strong>In the following figure,what is B?  </strong> A) Starting Inventory B) Detailed Scheduling C) Sales Forecasting D) MRP <div style=padding-top: 35px>

A) Starting Inventory
B) Detailed Scheduling
C) Sales Forecasting
D) MRP
Question
An unexpected increase in product demand can lead to:

A) A depletion of finished goods inventories
B) A depletion of raw materials inventories
C) Increased overtime and transportation expenses
D) Both a and b
E) All of the above
Question
The production plan for Fitter Snacker calls for 7000 cases for the snack bar product group in June.If the snack bar product group consists of NRG-A and NRG-B bars with the proportion 70% NRG-A bars and 30% NRG-B bars,how many NRG-A bars should be produced in June?

A) 500
B) 2010
C) 4690
D) 7000
Question
In detailed production scheduling,longer production runs of a particular product:

A) Increase the available capacity by reducing the frequency of setups.
B) Increases finished goods inventory levels.
C) Reduces finished goods inventory levels.
D) Both a and b.
E) Both a and c.
Question
In the following diagram,what is A? <strong>In the following diagram,what is A?  </strong> A) MRP B) Sales Forecasting C) Starting Inventory D) Detailed Scheduling <div style=padding-top: 35px>

A) MRP
B) Sales Forecasting
C) Starting Inventory
D) Detailed Scheduling
Question
What process answers the question "What do we need to order to produce the product,and when do we need to order these raw materials?"

A) SF - sales forecasting
B) SOP - sales and operations planning
C) MRP - materials requirements planning
D) DS - detailed scheduling
Question
What is the maximum number of cases they can produce in the month if they schedule workers for overtime on weekdays and Saturdays?

A) 7,666
B) 9,199
C) 9,582
D) 10,249
Question
What is the production plan for all finished goods?

A) MPS - master production schedule
B) QQR - quality query run
C) PPR - production planning run
D) RUN - run
Question
What is the sales forecast for June of this year that Fitter Snacker should use?

A) 6,628
B) 7,128
C) 6,935
D) 7,143
Question
What is the maximum number of cases they can produce in the month if they schedule workers for overtime on the weekdays only?

A) 7,666
B) 9,199
C) 9,582
D) 10,249
Question
____ are disaggregated to generate detailed production schedules.

A) Bills of materials
B) Production runs
C) Internet sales orders
D) Rough-cut plans
Question
<strong>  What Planned Orders will the MRP logic create:</strong> A) An order for 44,000 units in Period 2 B) An order for 44,000 units in Period 3 C) An order for 44,000 units for periods 2 and 3 D) An order for 88,000 units for period 3 <div style=padding-top: 35px>
What Planned Orders will the MRP logic create:

A) An order for 44,000 units in Period 2
B) An order for 44,000 units in Period 3
C) An order for 44,000 units for periods 2 and 3
D) An order for 88,000 units for period 3
Question
<strong>  What will the On Hand inventory be in Period 5 after the system calculated planned orders?</strong> A) 0 B) 440 C) 8,038 D) 14,038 <div style=padding-top: 35px>
What will the On Hand inventory be in Period 5 after the system calculated planned orders?

A) 0
B) 440
C) 8,038
D) 14,038
Question
In the following figure,what is C? <strong>In the following figure,what is C?  </strong> A) Starting Inventory B) Sales Forecasting C) MRP D) Detailed Scheduling <div style=padding-top: 35px>

A) Starting Inventory
B) Sales Forecasting
C) MRP
D) Detailed Scheduling
Question
The order of the steps in the SAP R/3 production planning process are:

A) Sales Forecasting, Demand Management, Sales and Operations Planning, MRP
B) Sales Forecasting, Demand Planning, Demand Management, MRP
C) Sales and Operations Planning, Sales Forecasting, MRP, Demand Management
D) Sales Forecasting, Sales and Operations Planning, Demand Management, MRP
Question
What metric tracks the number of times a supplier meets the agreed upon delivery date?

A) Initial fill rate
B) Initial order lead time
C) On-time performance
D) cash-to-cash cycle time
Question
The costs it normally takes to manufacture a product,which is calculated from historical costs and any changes from that,are known as:

A) Standard costs
B) Abbreviated costs
C) Known costs
D) Estimated costs
Question
In the following figure,what is D? <strong>In the following figure,what is D?  </strong> A) Starting Inventory B) Detailed Scheduling C) Sales Forecasting D) MRP <div style=padding-top: 35px>

A) Starting Inventory
B) Detailed Scheduling
C) Sales Forecasting
D) MRP
Question
The production plan at Fitter Snacker calls for 4,134 cases of snack bars in January.If there are 22 days in the month,how many cases of snack bars should be produced in a 4-day week?

A) 188
B) 752
C) 940
D) 1034
Question
What is repetitive manufacturing?
Question
What are the three principles that production planners follow?
Question
SAP can provide sophisticated tools to support sales and operations planning.Is that all that is necessary for a company to be successful? Support your answer by discussing the departments of marketing and manufacturing.
Question
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is G?<div style=padding-top: 35px>
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is G?
Question
List and explain each step of the production planning process.
Question
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is A?<div style=padding-top: 35px>
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is A?
Question
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is H?<div style=padding-top: 35px>
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is H?
Question
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is B?<div style=padding-top: 35px>
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is B?
Question
The ____________________,shown below for Fitter Snacker,is a list of the materials needed to make NRG-A and NRG-B bars.
The ____________________,shown below for Fitter Snacker,is a list of the materials needed to make NRG-A and NRG-B bars.  <div style=padding-top: 35px>
Question
Describe the measurements of success with Supply Chain Management.
Question
When might the SAP ERP system block the entry of the receipt of goods in the receiving department?
Question
What are the three general approaches to production?
Question
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is F?<div style=padding-top: 35px>
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is F?
Question
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is C?<div style=padding-top: 35px>
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is C?
Question
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is E?<div style=padding-top: 35px>
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is E?
Question
____________________ refers to the process of determining production quantities (for raw materials produced in-house)and order quantities (for purchased items).
Question
Explain Fitter Snacker's manufacturing process as shown below:
Explain Fitter Snacker's manufacturing process as shown below:  <div style=padding-top: 35px>
Question
How can data be entered into the R/3 system on the shop floor?
Question
What stage of the production planning process splits Fitter Snacker's monthly production planning values into finer time periods?

A) Sales Forecasting
B) BOM
C) MRP
D) Demand Management
Question
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is D?<div style=padding-top: 35px>
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is D?
Question
Describe Fitter Snacker's inventory problems with regard to their production process.
Question
Describe Fitter Snacker's communication problems with regard to the production process.
Question
Describe Fitter Snacker's accounting and purchasing problems with regard to its production process.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/63
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 4: Production and Supply Chain Management Information Systems
1
Lead times and lot sizing help a company determine the transfer of goods to the customer.
False
Correct ans would be timing and quantities of purchase orders.
2
ERP systems are necessary to implement good supply chain management.
False
ERP systems can help,but other technologies like EDI can be used to manage supply chains.
3
The percentage of the order that the supplier provides in the first shipment is known as the first-rate.
False
4
Make to order items are produced to fill customer's requests.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
5
Demand Management in the SAP R/3 system is the process where sales forecasts are adjusted to incorporate the impact of marketing initiatives.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
6
In a traditional supply chain,demand information is transmitted rapidly to all members of the supply chain.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
7
The MRP process determines the schedule of finished goods production.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
8
Good production decisions can be made knowing only the current level of finished goods inventory.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
9
Supply Chain Management is as much an approach to doing business with suppliers as it is a technology.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
10
The cost it normally takes to manufacture a product,which is usually derived from historical data and any changes that have occurred since then,is known as a structured cost.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
11
The percentage of the order that the supplier provided in the first shipment is known as the initial order lead time.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
12
The production plan for all finished goods is known as the MPS,or the master production schedule.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
13
Production planners aggregate products into product groups to make forecasts and plans more accurate.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
14
Because Fitter Snacker uses large quantities of oats,the most cost-effective way to purchase oats is to buy a farm and grown them.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
15
A make-to-stock production system is one where:

A) Items are made for inventory in anticipation of sales orders
B) Items are produced to fill specific customer orders
C) Items are assembled for a specific customer order from an inventory of components
D) Both a and c
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
16
Another term for the recipe of a product is the bill of materials.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
17
Because Fitter Snacker uses large quantities of oats,the most cost-effective way to puchase oats is in bulk hopper-truck quantities,which means that the material must be ordered in 44,000 pound quantities.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
18
Rough-cut planning is a common term in manufacturing for aggregate planning.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
19
The initial fill rate measures the time needed for the supplier to fill the order.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
20
The Sales and Operations Planning process is used to combine the sales forecast with capacity information to determine a production plan for finished goods.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
21
After MRP is run in the SAP R/3 system:

A) The stock/requirements list and MRP list are both updated and show the same information.
B) The MRP list is updated but the stock/requirements list is unaffected.
C) The stock/requirements list is updated but the MRP list is unaffected
D) None of the above.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
22
In the following figure,what is B? <strong>In the following figure,what is B?  </strong> A) Starting Inventory B) Detailed Scheduling C) Sales Forecasting D) MRP

A) Starting Inventory
B) Detailed Scheduling
C) Sales Forecasting
D) MRP
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
23
An unexpected increase in product demand can lead to:

A) A depletion of finished goods inventories
B) A depletion of raw materials inventories
C) Increased overtime and transportation expenses
D) Both a and b
E) All of the above
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
24
The production plan for Fitter Snacker calls for 7000 cases for the snack bar product group in June.If the snack bar product group consists of NRG-A and NRG-B bars with the proportion 70% NRG-A bars and 30% NRG-B bars,how many NRG-A bars should be produced in June?

A) 500
B) 2010
C) 4690
D) 7000
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
25
In detailed production scheduling,longer production runs of a particular product:

A) Increase the available capacity by reducing the frequency of setups.
B) Increases finished goods inventory levels.
C) Reduces finished goods inventory levels.
D) Both a and b.
E) Both a and c.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
26
In the following diagram,what is A? <strong>In the following diagram,what is A?  </strong> A) MRP B) Sales Forecasting C) Starting Inventory D) Detailed Scheduling

A) MRP
B) Sales Forecasting
C) Starting Inventory
D) Detailed Scheduling
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
27
What process answers the question "What do we need to order to produce the product,and when do we need to order these raw materials?"

A) SF - sales forecasting
B) SOP - sales and operations planning
C) MRP - materials requirements planning
D) DS - detailed scheduling
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
28
What is the maximum number of cases they can produce in the month if they schedule workers for overtime on weekdays and Saturdays?

A) 7,666
B) 9,199
C) 9,582
D) 10,249
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
29
What is the production plan for all finished goods?

A) MPS - master production schedule
B) QQR - quality query run
C) PPR - production planning run
D) RUN - run
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
30
What is the sales forecast for June of this year that Fitter Snacker should use?

A) 6,628
B) 7,128
C) 6,935
D) 7,143
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
31
What is the maximum number of cases they can produce in the month if they schedule workers for overtime on the weekdays only?

A) 7,666
B) 9,199
C) 9,582
D) 10,249
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
32
____ are disaggregated to generate detailed production schedules.

A) Bills of materials
B) Production runs
C) Internet sales orders
D) Rough-cut plans
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
33
<strong>  What Planned Orders will the MRP logic create:</strong> A) An order for 44,000 units in Period 2 B) An order for 44,000 units in Period 3 C) An order for 44,000 units for periods 2 and 3 D) An order for 88,000 units for period 3
What Planned Orders will the MRP logic create:

A) An order for 44,000 units in Period 2
B) An order for 44,000 units in Period 3
C) An order for 44,000 units for periods 2 and 3
D) An order for 88,000 units for period 3
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
34
<strong>  What will the On Hand inventory be in Period 5 after the system calculated planned orders?</strong> A) 0 B) 440 C) 8,038 D) 14,038
What will the On Hand inventory be in Period 5 after the system calculated planned orders?

A) 0
B) 440
C) 8,038
D) 14,038
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
35
In the following figure,what is C? <strong>In the following figure,what is C?  </strong> A) Starting Inventory B) Sales Forecasting C) MRP D) Detailed Scheduling

A) Starting Inventory
B) Sales Forecasting
C) MRP
D) Detailed Scheduling
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
36
The order of the steps in the SAP R/3 production planning process are:

A) Sales Forecasting, Demand Management, Sales and Operations Planning, MRP
B) Sales Forecasting, Demand Planning, Demand Management, MRP
C) Sales and Operations Planning, Sales Forecasting, MRP, Demand Management
D) Sales Forecasting, Sales and Operations Planning, Demand Management, MRP
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
37
What metric tracks the number of times a supplier meets the agreed upon delivery date?

A) Initial fill rate
B) Initial order lead time
C) On-time performance
D) cash-to-cash cycle time
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
38
The costs it normally takes to manufacture a product,which is calculated from historical costs and any changes from that,are known as:

A) Standard costs
B) Abbreviated costs
C) Known costs
D) Estimated costs
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
39
In the following figure,what is D? <strong>In the following figure,what is D?  </strong> A) Starting Inventory B) Detailed Scheduling C) Sales Forecasting D) MRP

A) Starting Inventory
B) Detailed Scheduling
C) Sales Forecasting
D) MRP
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
40
The production plan at Fitter Snacker calls for 4,134 cases of snack bars in January.If there are 22 days in the month,how many cases of snack bars should be produced in a 4-day week?

A) 188
B) 752
C) 940
D) 1034
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
41
What is repetitive manufacturing?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
42
What are the three principles that production planners follow?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
43
SAP can provide sophisticated tools to support sales and operations planning.Is that all that is necessary for a company to be successful? Support your answer by discussing the departments of marketing and manufacturing.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
44
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is G?
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is G?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
45
List and explain each step of the production planning process.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
46
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is A?
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is A?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
47
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is H?
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is H?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
48
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is B?
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is B?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
49
The ____________________,shown below for Fitter Snacker,is a list of the materials needed to make NRG-A and NRG-B bars.
The ____________________,shown below for Fitter Snacker,is a list of the materials needed to make NRG-A and NRG-B bars.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
50
Describe the measurements of success with Supply Chain Management.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
51
When might the SAP ERP system block the entry of the receipt of goods in the receiving department?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
52
What are the three general approaches to production?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
53
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is F?
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is F?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
54
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is C?
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is C?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
55
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is E?
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is E?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
56
____________________ refers to the process of determining production quantities (for raw materials produced in-house)and order quantities (for purchased items).
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
57
Explain Fitter Snacker's manufacturing process as shown below:
Explain Fitter Snacker's manufacturing process as shown below:
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
58
How can data be entered into the R/3 system on the shop floor?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
59
What stage of the production planning process splits Fitter Snacker's monthly production planning values into finer time periods?

A) Sales Forecasting
B) BOM
C) MRP
D) Demand Management
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
60
MATCHING
Refer to the following figure:
MATCHING Refer to the following figure:   a.MRP b.Demand Management c.Purchasing d.Sales Forecasting e.Detailed Scheduling f.Starting Inventory g.Production h.Sales and Operations Planning What is D?
a.MRP
b.Demand Management
c.Purchasing
d.Sales Forecasting
e.Detailed Scheduling
f.Starting Inventory
g.Production
h.Sales and Operations Planning
What is D?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
61
Describe Fitter Snacker's inventory problems with regard to their production process.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
62
Describe Fitter Snacker's communication problems with regard to the production process.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
63
Describe Fitter Snacker's accounting and purchasing problems with regard to its production process.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 63 flashcards in this deck.