Which of the following is a major difference between continuous processes and flow shops?

A)Inputs are fixed for continuous shops and the flow of work is continuous for flow shops
B)In flow shops,there is a discrete product or service instead of products not naturally divisible
C)Degree of automation is higher for flow shops
D)Continuous shops tend to be very small while flow shops tend to be very large
E)Both A and C
Use Space or
up arrow
down arrow
to flip the card.
Question
The product-process matrix developed by Hayes and Wheelwright (1979)explains how transformation systems vary from project-on the top left corner-to continuous processes-on the bottom right corner.Its vertical axis illustrates:

A)Output quantity
B)Variety of outputs
C)Quality
D)Breadth of outputs
E)None of the above
Question
Experienced staff needed to run job shops tends to increase its direct labor costs.
Question
Which form of transportation system utilizes group technology?

A)Flow shop
B)Job shop
C)Cellular production
D)Project operations
E)None of the above
Question
In the Service Matrix,to which quadrant does recreation belong?

A)Service shop
B)Professional service
C)Mass service
D)Service factory
E)Project shop
Question
Of the following,which form of transformation system has the lowest output variety but the highest batch size?

A)Job shop
B)Cellular
C)Project
D)Flow shop
Question
Which of the following is not a major element of a service guarantee?

A)Must be unconditional
B)Must be easy to communicate and for the customer to understand
C)Must include preventive measures for "fail safing"
D)Must be meaningful to the customer
E)All of the above are major elements
Question
A gap in the service process that is considered the misperception by the service provider of what the customer truly needs.

A)Gap 1
B)Gap 3
C)Gap 4
D)Gap 10
E)Gap 12
Question
Which of the following has the lowest fixed costs?

A)Job shop
B)Flow shop
C)Continuous transformation process
D)Cellular production
Question
The cost-volume-distance (CVD)model is suitable for layouts in which moving materials or people between departments is a major consideration.
Question
Why do continuous processes typically run 24 hours a day,seven days a week?

A)There is a need to spread their huge fixed cost over as large a volume as possible
B)Price is often the single most important factor in competing with their products
C)Facilities are a maze of pipes,conveyors,tanks,valves,vats,and bins
D)Both A and B
E)A and C but not B
Question
Layout analysis is usually performed for the following purpose(s):

A)Maximize operational efficiency
B)Reduce safety or health hazards
C)Minimize interference or noise between areas
D)All of the above
E)None of the above
Question
A general characteristic of a job shop is that it requires a small variety of inputs,and minimal variations in the time it takes for a complete "job".
Question
A __ is commonly used to produce highly standardized outputs in extremely large volume.

A)Job shop
B)Flow shop
C)Continuous transformation process
D)Cellular production
E)None of the above
Question
Which of the following is not a well-known problem in flow shops?

A)Boredom
B)Workers may be dehumanized by manufacturing lines
C)Absenteeism
D)All of the above are well-known problems in flow shops
E)None of the above
Question
Paced lines use some sort of conveyor to move output along the production line at a variable rate,so that operators do their work as they need.
Question
A/An ___ item is produced in batches of some size that is set by the customer,and then delivered upon its completion.

A)Make-to-order
B)Make-to-stock
C)Order-to-make
D)Stock-to-order
E)Finish-to-order
Question
Which of the following is false for job shops?

A)Unique jobs must be produced
B)Output batch size is moderately large,to make it cost effective
C)The flow of work through facilities tends to be intermittent
D)Groupings of staff and equipment are done according to function
E)None of the above
Question
Which of the following is not a basic form of transformation systems?

A)Job shop
B)Flow shop
C)Continuous transformation process
D)All of the above are basic forms of transformation systems
Question
Balancing a production line includes the following tasks,except:

A)Finding a cycle time in which each workstation can complete its tasks
B)Take into account precedence relationships among tasks
C)Identify the task with the longest operation time
D)Calculate the number of workstations that completes the job in the minimum amount of time
E)None of the above
Question
A logical,nominal,or virtual cell refers to a situation where the equipment is physically adjoining and reserved for production of only one part family.
Question
As the costs of fixed equipment investments rise with the volume produced,companies move from project to job,flow,and then cell transformation systems.
Question
Name some differences between flow shop and continuous process.
Question
Of large scale and finite duration,_____ _____ tend to be non-repetitive,with multiple and often simultaneous,highly interdependent tasks.
Question
Explain how the flow shop and the continuous process are similar.
Question
According to the service matrix developed by Schmenner,services with low contact intensity and customization attain profitability through high prices rather than high volumes.
Question
What are the three elements of servicescapes most emphasized by Bitner?
Question
What are some common disadvantages that result from both continuous process and flow shops?
Question
Give one example of where the continuous transformation process is used.Explain why.
Question
In the product-process matrix,when the size of a batch increases significantly,with a corresponding decrease in output variety,then the flow shop is appropriate.
Question
Continuous processes are characterized by low to moderate output variety and one to few in batch size.
Question
In cellular production the cellular form allows for a level of customization usually found in job shops.
Question
What is the difference in a make-to-stock item and a make-to-order item?
Question
What characteristics divide service systems,and what is the name of the four quadrants they are divided into?
Question
In cellular production,parts with similar processing requirements are called part families.What are some of the classifications for separating these parts?
Question
In process planning there are both short and long tasks involved in stations.Describe how both tasks differ when being assigned to different stations.
Question
What is the difference between "make-to-stock" and "make-to-order"?
Question
Explain how balancing a production line uses cycle time for success.
Question
The concept of _____ ______ (Chase and Stewart,1994)is used by organizations to help guarantee their service,by anticipating where a service failure might occur and installing preventive measures.
Question
What are the four major elements of a service guarantee?
Question
In what ways can a flow shop minimize costs (be specific)?
Question
What important advice did Chase and Tansik write about customer delivery systems,and why is it useful information?
Question
When would it be better for a firm to use flow shops rather than continuous process?
Question
Explain how it can be difficult to efficiently manage a job shop.
Question
What kinds of companies benefit from continuous process and explain why it is so valuable for their company.
Question
What two basis do shops use to formally plan their layouts to group the equipment and why?
Question
In the service industry why is it important to know exactly what characteristics of the service need to be emphasized? Give an example.
Question
Explain how pace can become an issue in a flow shop.
Question
What are some of the disadvantages of using a job shop? Explain.
Question
In designing a process system,what are three key things that may indicate that the project form is appropriate?
Question
What are some of the advantages of cellular production? Explain.
Question
Why is it difficult to layout the operations of a job shop? Explain.
Question
How does cellular form within production reduce machine setup times?
Question
What are some of the advantages of using a job shop? Explain.
Question
What are some of the disadvantages of cellular production? Explain.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/55
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 3: Process Planning
1
Which of the following is a major difference between continuous processes and flow shops?

A)Inputs are fixed for continuous shops and the flow of work is continuous for flow shops
B)In flow shops,there is a discrete product or service instead of products not naturally divisible
C)Degree of automation is higher for flow shops
D)Continuous shops tend to be very small while flow shops tend to be very large
E)Both A and C
In flow shops,there is a discrete product or service instead of products not naturally divisible
2
The product-process matrix developed by Hayes and Wheelwright (1979)explains how transformation systems vary from project-on the top left corner-to continuous processes-on the bottom right corner.Its vertical axis illustrates:

A)Output quantity
B)Variety of outputs
C)Quality
D)Breadth of outputs
E)None of the above
Variety of outputs
3
Experienced staff needed to run job shops tends to increase its direct labor costs.
True
4
Which form of transportation system utilizes group technology?

A)Flow shop
B)Job shop
C)Cellular production
D)Project operations
E)None of the above
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
5
In the Service Matrix,to which quadrant does recreation belong?

A)Service shop
B)Professional service
C)Mass service
D)Service factory
E)Project shop
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
6
Of the following,which form of transformation system has the lowest output variety but the highest batch size?

A)Job shop
B)Cellular
C)Project
D)Flow shop
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following is not a major element of a service guarantee?

A)Must be unconditional
B)Must be easy to communicate and for the customer to understand
C)Must include preventive measures for "fail safing"
D)Must be meaningful to the customer
E)All of the above are major elements
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
8
A gap in the service process that is considered the misperception by the service provider of what the customer truly needs.

A)Gap 1
B)Gap 3
C)Gap 4
D)Gap 10
E)Gap 12
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
9
Which of the following has the lowest fixed costs?

A)Job shop
B)Flow shop
C)Continuous transformation process
D)Cellular production
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
10
The cost-volume-distance (CVD)model is suitable for layouts in which moving materials or people between departments is a major consideration.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
11
Why do continuous processes typically run 24 hours a day,seven days a week?

A)There is a need to spread their huge fixed cost over as large a volume as possible
B)Price is often the single most important factor in competing with their products
C)Facilities are a maze of pipes,conveyors,tanks,valves,vats,and bins
D)Both A and B
E)A and C but not B
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
12
Layout analysis is usually performed for the following purpose(s):

A)Maximize operational efficiency
B)Reduce safety or health hazards
C)Minimize interference or noise between areas
D)All of the above
E)None of the above
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
13
A general characteristic of a job shop is that it requires a small variety of inputs,and minimal variations in the time it takes for a complete "job".
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
14
A __ is commonly used to produce highly standardized outputs in extremely large volume.

A)Job shop
B)Flow shop
C)Continuous transformation process
D)Cellular production
E)None of the above
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
15
Which of the following is not a well-known problem in flow shops?

A)Boredom
B)Workers may be dehumanized by manufacturing lines
C)Absenteeism
D)All of the above are well-known problems in flow shops
E)None of the above
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
16
Paced lines use some sort of conveyor to move output along the production line at a variable rate,so that operators do their work as they need.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
17
A/An ___ item is produced in batches of some size that is set by the customer,and then delivered upon its completion.

A)Make-to-order
B)Make-to-stock
C)Order-to-make
D)Stock-to-order
E)Finish-to-order
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
18
Which of the following is false for job shops?

A)Unique jobs must be produced
B)Output batch size is moderately large,to make it cost effective
C)The flow of work through facilities tends to be intermittent
D)Groupings of staff and equipment are done according to function
E)None of the above
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
19
Which of the following is not a basic form of transformation systems?

A)Job shop
B)Flow shop
C)Continuous transformation process
D)All of the above are basic forms of transformation systems
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
20
Balancing a production line includes the following tasks,except:

A)Finding a cycle time in which each workstation can complete its tasks
B)Take into account precedence relationships among tasks
C)Identify the task with the longest operation time
D)Calculate the number of workstations that completes the job in the minimum amount of time
E)None of the above
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
21
A logical,nominal,or virtual cell refers to a situation where the equipment is physically adjoining and reserved for production of only one part family.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
22
As the costs of fixed equipment investments rise with the volume produced,companies move from project to job,flow,and then cell transformation systems.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
23
Name some differences between flow shop and continuous process.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
24
Of large scale and finite duration,_____ _____ tend to be non-repetitive,with multiple and often simultaneous,highly interdependent tasks.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
25
Explain how the flow shop and the continuous process are similar.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
26
According to the service matrix developed by Schmenner,services with low contact intensity and customization attain profitability through high prices rather than high volumes.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
27
What are the three elements of servicescapes most emphasized by Bitner?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
28
What are some common disadvantages that result from both continuous process and flow shops?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
29
Give one example of where the continuous transformation process is used.Explain why.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
30
In the product-process matrix,when the size of a batch increases significantly,with a corresponding decrease in output variety,then the flow shop is appropriate.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
31
Continuous processes are characterized by low to moderate output variety and one to few in batch size.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
32
In cellular production the cellular form allows for a level of customization usually found in job shops.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
33
What is the difference in a make-to-stock item and a make-to-order item?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
34
What characteristics divide service systems,and what is the name of the four quadrants they are divided into?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
35
In cellular production,parts with similar processing requirements are called part families.What are some of the classifications for separating these parts?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
36
In process planning there are both short and long tasks involved in stations.Describe how both tasks differ when being assigned to different stations.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
37
What is the difference between "make-to-stock" and "make-to-order"?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
38
Explain how balancing a production line uses cycle time for success.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
39
The concept of _____ ______ (Chase and Stewart,1994)is used by organizations to help guarantee their service,by anticipating where a service failure might occur and installing preventive measures.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
40
What are the four major elements of a service guarantee?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
41
In what ways can a flow shop minimize costs (be specific)?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
42
What important advice did Chase and Tansik write about customer delivery systems,and why is it useful information?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
43
When would it be better for a firm to use flow shops rather than continuous process?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
44
Explain how it can be difficult to efficiently manage a job shop.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
45
What kinds of companies benefit from continuous process and explain why it is so valuable for their company.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
46
What two basis do shops use to formally plan their layouts to group the equipment and why?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
47
In the service industry why is it important to know exactly what characteristics of the service need to be emphasized? Give an example.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
48
Explain how pace can become an issue in a flow shop.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
49
What are some of the disadvantages of using a job shop? Explain.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
50
In designing a process system,what are three key things that may indicate that the project form is appropriate?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
51
What are some of the advantages of cellular production? Explain.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
52
Why is it difficult to layout the operations of a job shop? Explain.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
53
How does cellular form within production reduce machine setup times?
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
54
What are some of the advantages of using a job shop? Explain.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
55
What are some of the disadvantages of cellular production? Explain.
Unlock Deck
Unlock for access to all 55 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 55 flashcards in this deck.