Deck 8: Manufacture of Concrete Block Masonry

Full screen (f)
exit full mode
Question
A controlled amount of water and additives are then fed into the mixer and each batch is mixed for _____ .

A) 2 to 3 minutes
B) 5 to 7 minutes
C) 6 to 8 minutes
D) 10 to 12 minutes
Use Space or
up arrow
down arrow
to flip the card.
Question
Concrete block have become very popular with landscaping masonry contractors and home owners for many uses.
Question
On the special trucks used to deliver block to the job site, the boom of the forklift has a drop reach of about _____ and is able to swing in any direction.

A) 5 feet
B) 6 feet
C) 12 feet
D) 15 feet
Question
Most block today have three cells instead of the older design of three cells.
Question
Cubes of block are allowed to open-air cure for another _____ in the storage yard before being delivered to the customer or builder.

A) 10 days
B) 28 days
C) 1 week
D) 2 weeks
Question
The molding machine operates at _____ cycles per minute.

A) 8
B) 10
C) 12
D) 15
Question
Compressive strength and size variation tests are performed ______ .

A) on one batch of block per day
B) and recorded for 14-day tests
C) as soon as the block are removed from the kilns
D) only at the customer's or contractor's request
Question
The cubes are moved by forklift tractors from the cubing area to the storage yard.
Question
Raw materials may vary in geographical areas, but all have to be able to produce a concrete masonry Chapter that conforms to ASTM requirements.
Question
Lighter weight concrete masonry Chapters are not required to meet the same ASTM requirements as heavy-weight block.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 8: Manufacture of Concrete Block Masonry
1
A controlled amount of water and additives are then fed into the mixer and each batch is mixed for _____ .

A) 2 to 3 minutes
B) 5 to 7 minutes
C) 6 to 8 minutes
D) 10 to 12 minutes
C
2
Concrete block have become very popular with landscaping masonry contractors and home owners for many uses.
True
3
On the special trucks used to deliver block to the job site, the boom of the forklift has a drop reach of about _____ and is able to swing in any direction.

A) 5 feet
B) 6 feet
C) 12 feet
D) 15 feet
C
4
Most block today have three cells instead of the older design of three cells.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
5
Cubes of block are allowed to open-air cure for another _____ in the storage yard before being delivered to the customer or builder.

A) 10 days
B) 28 days
C) 1 week
D) 2 weeks
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
6
The molding machine operates at _____ cycles per minute.

A) 8
B) 10
C) 12
D) 15
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
7
Compressive strength and size variation tests are performed ______ .

A) on one batch of block per day
B) and recorded for 14-day tests
C) as soon as the block are removed from the kilns
D) only at the customer's or contractor's request
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
8
The cubes are moved by forklift tractors from the cubing area to the storage yard.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
9
Raw materials may vary in geographical areas, but all have to be able to produce a concrete masonry Chapter that conforms to ASTM requirements.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
10
Lighter weight concrete masonry Chapters are not required to meet the same ASTM requirements as heavy-weight block.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 10 flashcards in this deck.