The ability to plan projects effectively is an attribute of a project manager.
Use Space or
up arrow
down arrow
to flip the card.
Question
It is not necessary to identify the stakeholders before a project is planned.
Question
During the early stages of a project,tactics are more integral to success than strategy.
Question
The more the authority and the responsibility are shared between the functional and project managers,the better the chances of project success.
Question
NPV is the result of cash flow divided by the cost of the project.
Question
Posterior probability is the probability that an event will reflect established beliefs about the event before the arrival of new evidence or information.
Question
Technology employed in projects should not determine project team member selection.
Question
Scorecard analysis is used to select and prioritize projects based on quantitative criteria.
Question
Payback occurs when net costs equal net benefits accumulated over the project years.
Question
The higher the ROI,the better for the organization.
Question
In a decision tree,an alternative's expected value is calculated by multiplying each possible payoff of the alternative by its probability and summing the results.
Question
Project initiation consists of identifying and selecting projects and developing project charters for the selected projects.
Question
The ability to present outcomes effectively is a professional characteristic of a project manager.
Question
Having a high energy level is a personal characteristic of a project manager.
Question
The selection and prioritization process of organizational projects has to align with the goals and strategy of the organization.
Question
Generally speaking,the IRR should be lower than the hurdle rate.
Question
An organization should consider projects only if the NPV is negative.
Question
The construction of a new data center would be categorized as an emergency project.
Question
Organizations usually prepare feasibility studies as the first means of starting a project.
Question
The most important benefit of a project charter is that it authorizes a project and ensures that necessary resources and management commitments are provided to achieve success.
Question
Wheelwright and Clark's framework for classifying project types includes each of the following except

A)basic research projects.
B)alliances and partnership projects.
C)end-user projects.
D)platform projects.
Question
All stakeholders need to agree upon the requirements before the start of the project.
Question
A use case is a technique used in software projects to document the potential requirements of a new system or software.
Question
Requirements gathering documents should provide initial solutions to a problem.
Question
JAD is very effective for large complex projects.
Question
A big picture of the company consisting of a sentence or short paragraph that provides a broad,aspiring image of the future of the organization best defines

A)vision.
B)mission.
C)objective statement.
D)organizational scope.
Question
Saaty's multiple criteria decision-making technique that allows subjective as well as objective factors to be considered during the decision-making process is

A)NGT.
B)JRP.
C)AHP.
D)DML.
Question
Stakeholder analysis does not include the ability to help mitigate the project risks.
Question
Document analysis is the most common technique for gathering requirements.
Question
According to Wheelwright and Clark,which of the following project types involve significant changes to existing products,systems,services,and processes?

A)alliances and partnership projects
B)breakthrough projects
C)derivative projects
D)basic research projects
Question
A sentence or short paragraph written by an organization to reflect its core purpose,identity,and values best defines

A)organization scope.
B)mission statement.
C)project charter.
D)vision.
Question
Project proposals include each of the following except

A)an implementation plan.
B)a statement of work.
C)perceived benefits by year.
D)high-level schedule requests.
Question
Project requirements can be gathered through brainstorming,focus groups,and facilitated workshops.
Question
AHP is based on each of the following principles except

A)synthesis of priorities.
B)decomposition.
C)comparative judgement.
D)iteration.
Question
A plan,method,or action employed to achieve the goals and objectives,which in turn achieve the mission of an organization toward the realization of its vision best defines

A)organizational strategy.
B)organizational mission statement.
C)business statement.
D)project charter.
Question
Which of the following describes the work to be done in detail and will be used in the project charter in the future and in all project documents?

A)organization mission statement
B)statement of work
C)business case
D)project scope statement
Question
Observers have neither interest in nor influence on the project.
Question
According to Wheelwright and Clark,which of the following project types breeds future commercial products,new systems,and novel services?

A)alliances and partnership projects
B)breakthrough projects
C)derivative projects
D)basic research projects
Question
Shapers should be relied upon for help,guidance,and advice.
Question
Requirements gathering is perhaps the most complex and critical process of any project success.
Question
Which of the following is the return or discount rate that makes NPV = 0?

A)ROI
B)IRR
C)PMI
D)QFD
Question
Attributes of a project manager include

A)possessing good people skills.
B)knowing how to solve disputes.
C)having a great attitude and enthusiasm.
D)all of the above.
Question
Projects that are essential to support the long-range mission are categorized as

A)operational.
B)strategic.
C)mission critical.
D)emergency.
Question
Assuming a discount rate of 8 percent,what is the present value of $800,000 three years from now?

A)635,065.79
B)685,871.06
C)740,740.74
D)None of the above is correct.
Question
Projects can be categorized as any of the following except

A)resourceful.
B)compliance.
C)operational.
D)mission critical.
Question
A project charter should contain each of the following except project

A)test plan.
B)purpose or justification.
C)objectives.
D)description.
Question
Models for project selection and prioritization include

A)scorecard analysis.
B)decision tree analysis.
C)net present value.
D)all of the above.
Question
Professional characteristics of a project manager include

A)is honest and has integrity.
B)assertive and confident.
C)team player.
D)adaptable to situations.
Question
Personal characteristics of a project manager include

A)able to work under uncertainty.
B)good written and oral communication skills.
C)friendly and optimistic.
D)understands business issues.
Question
A methodology used in incorporating the requirements of those who have an interest in a project best defines

A)stakeholder analysis.
B)stakeholder synthesis.
C)requirements review.
D)logical review.
Question
Purposes for identifying stakeholders include each of the following except

A)knowing the individual to blame if the project fails.
B)improving working conditions.
C)streamlining business and project processes.
D)stabilizing the project when things go in the wrong direction.
Question
Categories of project manager characteristics include each of the following except

A)personal.
B)technical.
C)relational.
D)professional.
Question
Project selection criteria include

A)strategic goals of the organization.
B)market need.
C)technological advancement.
D)all of the above.
Question
Stakeholders include

A)customers and users.
B)project team.
C)upper management.
D)all of the above.
Question
Which stakeholder group provides financial resources for the project?

A)project sponsors and champions
B)customers and users
C)upper management
D)functional managers
Question
A document that formally recognizes a project and includes a problem statement,project objectives,benefits,process owners,and a project sponsor or a champion best defines

A)business case.
B)organizational mission statement.
C)project charter.
D)statement of work.
Question
The amount of time a project will take to recuperate its investments best defines

A)recuperation time frame.
B)net present value.
C)payback analysis.
D)internal rate of return.
Question
Individuals or organizations who are affected by a project best defines

A)end users.
B)project manager.
C)customers.
D)stakeholders.
Question
The purpose of the project charter is to

A)define the reasons for undertaking the project.
B)define objectives and constraints of the project.
C)define directions concerning the solution.
D)do all of the above.
Question
A project involving renovations due to a fire or other disaster would be classified as

A)compliance.
B)emergency.
C)mission critical.
D)strategic.
Question
Which stakeholders have high influence but have some or no interest in the project?

A)promoters
B)shapers
C)advocates
D)observers
Question
A table captured to map all the requirements of all stakeholders in order to track them until the project is complete best defines

A)mind map.
B)requirements traceability matrix.
C)decision tree.
D)project charter.
Question
A sample or a model built usually to test a concept,a process,a system,or a product best defines

A)use case.
B)test case.
C)mind map.
D)prototype.
Question
A technique used in software projects to document the potential requirements of a new system or software by conveying how the system should interact with the end user or another system to achieve a specific business goal graphically best defines

A)interface analysis.
B)use case analysis.
C)joint requirements planning.
D)nominal group technique.
Question
A capability of a system,product,or service to include the quantified and documented needs and expectations of the sponsor,customer,and other stakeholders best defines

A)task.
B)requirement.
C)process.
D)activity.
Question
Define project scope.What does the scope document contain?
Question
Identify five objectives that must be achieved for a project.
Question
A structured group meeting of stakeholders to gather requirements by actively involving the stakeholders to replace individual interviews best defines

A)QFD.
B)KMAP.
C)BPR.
D)JRP.
Question
Which of the following creates requirements from "as-is" process documents?

A)document analysis
B)nominal group technique
C)interface analysis
D)focus group
Question
Which of the following reviews various points where two or more systems interact with each other?

A)prototyping
B)mind maps
C)interface analysis
D)use case analysis
Question
A graphical method of taking mental notes or ideas in a structured fashion best defines

A)mind map.
B)prototype.
C)use case.
D)object diagram.
Question
Identify five ways that project requirements may be gathered.
Question
The addition of scope after it is defined in the scope document best defines

A)scope evolution.
B)scope iteration.
C)scope increment.
D)scope creep.
Question
Stakeholder analysis includes

A)stakeholder characteristics.
B)level of interest of the stakeholders in the specific project.
C)ability to affect the project policies through power and/or leadership.
D)all of the above.
Question
A process used in prototyping to collect requirements while developing new information systems for a company best defines

A)QFD.
B)KMAP.
C)JAD.
D)RAD.
Question
Identify three categories of project manager characteristics.For each category,provide two examples.
Question
Which stakeholders have high influence as well as high interest in the project?

A)promoters
B)shapers
C)advocates
D)observers
Question
Steps involved in generating a mind map include

A)continuing until no more risks can be identified.
B)begin by drawing a circle that represents a risk category.
C)for each major risk,identify smaller risks that are part of that risk.
D)all of the above.
Question
When recruiting effective project managers,what five challenges might an organization face?
Question
Which of the following defines a baseline for performance measurement?

A)object diagram
B)sequence diagram
C)project scope
D)use case diagram
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/80
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 4: Project Initiation
1
The ability to plan projects effectively is an attribute of a project manager.
True
2
It is not necessary to identify the stakeholders before a project is planned.
False
3
During the early stages of a project,tactics are more integral to success than strategy.
False
4
The more the authority and the responsibility are shared between the functional and project managers,the better the chances of project success.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
5
NPV is the result of cash flow divided by the cost of the project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
6
Posterior probability is the probability that an event will reflect established beliefs about the event before the arrival of new evidence or information.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
7
Technology employed in projects should not determine project team member selection.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
8
Scorecard analysis is used to select and prioritize projects based on quantitative criteria.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
9
Payback occurs when net costs equal net benefits accumulated over the project years.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
10
The higher the ROI,the better for the organization.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
11
In a decision tree,an alternative's expected value is calculated by multiplying each possible payoff of the alternative by its probability and summing the results.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
12
Project initiation consists of identifying and selecting projects and developing project charters for the selected projects.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
13
The ability to present outcomes effectively is a professional characteristic of a project manager.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
14
Having a high energy level is a personal characteristic of a project manager.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
15
The selection and prioritization process of organizational projects has to align with the goals and strategy of the organization.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
16
Generally speaking,the IRR should be lower than the hurdle rate.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
17
An organization should consider projects only if the NPV is negative.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
18
The construction of a new data center would be categorized as an emergency project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
19
Organizations usually prepare feasibility studies as the first means of starting a project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
20
The most important benefit of a project charter is that it authorizes a project and ensures that necessary resources and management commitments are provided to achieve success.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
21
Wheelwright and Clark's framework for classifying project types includes each of the following except

A)basic research projects.
B)alliances and partnership projects.
C)end-user projects.
D)platform projects.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
22
All stakeholders need to agree upon the requirements before the start of the project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
23
A use case is a technique used in software projects to document the potential requirements of a new system or software.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
24
Requirements gathering documents should provide initial solutions to a problem.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
25
JAD is very effective for large complex projects.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
26
A big picture of the company consisting of a sentence or short paragraph that provides a broad,aspiring image of the future of the organization best defines

A)vision.
B)mission.
C)objective statement.
D)organizational scope.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
27
Saaty's multiple criteria decision-making technique that allows subjective as well as objective factors to be considered during the decision-making process is

A)NGT.
B)JRP.
C)AHP.
D)DML.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
28
Stakeholder analysis does not include the ability to help mitigate the project risks.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
29
Document analysis is the most common technique for gathering requirements.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
30
According to Wheelwright and Clark,which of the following project types involve significant changes to existing products,systems,services,and processes?

A)alliances and partnership projects
B)breakthrough projects
C)derivative projects
D)basic research projects
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
31
A sentence or short paragraph written by an organization to reflect its core purpose,identity,and values best defines

A)organization scope.
B)mission statement.
C)project charter.
D)vision.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
32
Project proposals include each of the following except

A)an implementation plan.
B)a statement of work.
C)perceived benefits by year.
D)high-level schedule requests.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
33
Project requirements can be gathered through brainstorming,focus groups,and facilitated workshops.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
34
AHP is based on each of the following principles except

A)synthesis of priorities.
B)decomposition.
C)comparative judgement.
D)iteration.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
35
A plan,method,or action employed to achieve the goals and objectives,which in turn achieve the mission of an organization toward the realization of its vision best defines

A)organizational strategy.
B)organizational mission statement.
C)business statement.
D)project charter.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
36
Which of the following describes the work to be done in detail and will be used in the project charter in the future and in all project documents?

A)organization mission statement
B)statement of work
C)business case
D)project scope statement
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
37
Observers have neither interest in nor influence on the project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
38
According to Wheelwright and Clark,which of the following project types breeds future commercial products,new systems,and novel services?

A)alliances and partnership projects
B)breakthrough projects
C)derivative projects
D)basic research projects
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
39
Shapers should be relied upon for help,guidance,and advice.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
40
Requirements gathering is perhaps the most complex and critical process of any project success.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
41
Which of the following is the return or discount rate that makes NPV = 0?

A)ROI
B)IRR
C)PMI
D)QFD
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
42
Attributes of a project manager include

A)possessing good people skills.
B)knowing how to solve disputes.
C)having a great attitude and enthusiasm.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
43
Projects that are essential to support the long-range mission are categorized as

A)operational.
B)strategic.
C)mission critical.
D)emergency.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
44
Assuming a discount rate of 8 percent,what is the present value of $800,000 three years from now?

A)635,065.79
B)685,871.06
C)740,740.74
D)None of the above is correct.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
45
Projects can be categorized as any of the following except

A)resourceful.
B)compliance.
C)operational.
D)mission critical.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
46
A project charter should contain each of the following except project

A)test plan.
B)purpose or justification.
C)objectives.
D)description.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
47
Models for project selection and prioritization include

A)scorecard analysis.
B)decision tree analysis.
C)net present value.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
48
Professional characteristics of a project manager include

A)is honest and has integrity.
B)assertive and confident.
C)team player.
D)adaptable to situations.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
49
Personal characteristics of a project manager include

A)able to work under uncertainty.
B)good written and oral communication skills.
C)friendly and optimistic.
D)understands business issues.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
50
A methodology used in incorporating the requirements of those who have an interest in a project best defines

A)stakeholder analysis.
B)stakeholder synthesis.
C)requirements review.
D)logical review.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
51
Purposes for identifying stakeholders include each of the following except

A)knowing the individual to blame if the project fails.
B)improving working conditions.
C)streamlining business and project processes.
D)stabilizing the project when things go in the wrong direction.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
52
Categories of project manager characteristics include each of the following except

A)personal.
B)technical.
C)relational.
D)professional.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
53
Project selection criteria include

A)strategic goals of the organization.
B)market need.
C)technological advancement.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
54
Stakeholders include

A)customers and users.
B)project team.
C)upper management.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
55
Which stakeholder group provides financial resources for the project?

A)project sponsors and champions
B)customers and users
C)upper management
D)functional managers
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
56
A document that formally recognizes a project and includes a problem statement,project objectives,benefits,process owners,and a project sponsor or a champion best defines

A)business case.
B)organizational mission statement.
C)project charter.
D)statement of work.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
57
The amount of time a project will take to recuperate its investments best defines

A)recuperation time frame.
B)net present value.
C)payback analysis.
D)internal rate of return.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
58
Individuals or organizations who are affected by a project best defines

A)end users.
B)project manager.
C)customers.
D)stakeholders.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
59
The purpose of the project charter is to

A)define the reasons for undertaking the project.
B)define objectives and constraints of the project.
C)define directions concerning the solution.
D)do all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
60
A project involving renovations due to a fire or other disaster would be classified as

A)compliance.
B)emergency.
C)mission critical.
D)strategic.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
61
Which stakeholders have high influence but have some or no interest in the project?

A)promoters
B)shapers
C)advocates
D)observers
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
62
A table captured to map all the requirements of all stakeholders in order to track them until the project is complete best defines

A)mind map.
B)requirements traceability matrix.
C)decision tree.
D)project charter.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
63
A sample or a model built usually to test a concept,a process,a system,or a product best defines

A)use case.
B)test case.
C)mind map.
D)prototype.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
64
A technique used in software projects to document the potential requirements of a new system or software by conveying how the system should interact with the end user or another system to achieve a specific business goal graphically best defines

A)interface analysis.
B)use case analysis.
C)joint requirements planning.
D)nominal group technique.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
65
A capability of a system,product,or service to include the quantified and documented needs and expectations of the sponsor,customer,and other stakeholders best defines

A)task.
B)requirement.
C)process.
D)activity.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
66
Define project scope.What does the scope document contain?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
67
Identify five objectives that must be achieved for a project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
68
A structured group meeting of stakeholders to gather requirements by actively involving the stakeholders to replace individual interviews best defines

A)QFD.
B)KMAP.
C)BPR.
D)JRP.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
69
Which of the following creates requirements from "as-is" process documents?

A)document analysis
B)nominal group technique
C)interface analysis
D)focus group
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
70
Which of the following reviews various points where two or more systems interact with each other?

A)prototyping
B)mind maps
C)interface analysis
D)use case analysis
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
71
A graphical method of taking mental notes or ideas in a structured fashion best defines

A)mind map.
B)prototype.
C)use case.
D)object diagram.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
72
Identify five ways that project requirements may be gathered.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
73
The addition of scope after it is defined in the scope document best defines

A)scope evolution.
B)scope iteration.
C)scope increment.
D)scope creep.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
74
Stakeholder analysis includes

A)stakeholder characteristics.
B)level of interest of the stakeholders in the specific project.
C)ability to affect the project policies through power and/or leadership.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
75
A process used in prototyping to collect requirements while developing new information systems for a company best defines

A)QFD.
B)KMAP.
C)JAD.
D)RAD.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
76
Identify three categories of project manager characteristics.For each category,provide two examples.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
77
Which stakeholders have high influence as well as high interest in the project?

A)promoters
B)shapers
C)advocates
D)observers
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
78
Steps involved in generating a mind map include

A)continuing until no more risks can be identified.
B)begin by drawing a circle that represents a risk category.
C)for each major risk,identify smaller risks that are part of that risk.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
79
When recruiting effective project managers,what five challenges might an organization face?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
80
Which of the following defines a baseline for performance measurement?

A)object diagram
B)sequence diagram
C)project scope
D)use case diagram
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 80 flashcards in this deck.