Deck 8: Project Scheduling
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/80
Play
Full screen (f)
Deck 8: Project Scheduling
1
Project time includes all the required processes to manage and complete the project in a timely fashion.
True
2
PDM uses time as a common factor to analyze other project success factors like scope,resources,cost,performance,and value.
True
3
One very important purpose of constructing and using PDM is to determine how much time is needed to complete a project.
True
4
An activity on the critical path has several days of free float.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
5
PERT is inexpensive to maintain and primarily used for small to medium sized projects.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
6
A significant disadvantage of PDM and PERT is that they should not be used in times of uncertainty.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
7
Capacity measures how early or late an activity can start or finish.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
8
In PDM,an activity can have successors with no predecessors.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
9
Before any successor activity can be initiated in PDM,all the activities that precede that activity have to be completed.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
10
In PDM,an activity can have predecessors with no successors.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
11
Project Evaluation and Review Technique is a project management tool used to schedule,organize,and coordinate tasks within a project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
12
In PDM,a project will have one start activity and at least two finish activities.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
13
A work breakdown flowchart is useful for all stakeholders to track the project from beginning to finish.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
14
Causing a delay to the whole project is called free float.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
15
The earliest finish time is the total of the earliest start time and the activity duration.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
16
Free float is an early warning and an indicator that corrective measures to scheduling have to be taken.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
17
Primary advantages of PERT are that it is flexible and easy to use.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
18
If the early start for an activity is 7 and the late start is 12,then the activity's slack is 84.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
19
SAP PS is a free,web-based project software package.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
20
When making a forward pass through a network,the earliest start time of a successor activity is the earliest finish date of a predecessor.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
21
In order to keep the whole project on schedule,the CCPM method requires project personnel to be strict with their start times.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following is the delivery of a project scope?
A)quality functional deployment
B)project schedule
C)burndown chart
D)thought process map
A)quality functional deployment
B)project schedule
C)burndown chart
D)thought process map
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
23
The total project duration is the sum of all critical tasks.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
24
Which of the following is integrated with the organization's finance and human resources databases?
A)Primavera
B)Zoho
C)SAP PS
D)Microsoft Project
A)Primavera
B)Zoho
C)SAP PS
D)Microsoft Project
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
25
Each activity can be crashed at least once.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
26
The CCPM method modifies the project schedule to account for limited resources.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
27
Optimistic time is the completion time having the highest probability.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
28
Which of the following was chosen by Coca-Cola Bottling Co.Consolidated to improve their project cost estimations and use their resources effectively?
A)Zoho
B)Primavera
C)Microsoft Office Enterprise Project Management Solution
D)SAP PS
A)Zoho
B)Primavera
C)Microsoft Office Enterprise Project Management Solution
D)SAP PS
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the following was developed by Du Pont de Nemours & Co.and Remington Rand Corporation?
A)PERT
B)CPM
C)TMAP
D)QFD
A)PERT
B)CPM
C)TMAP
D)QFD
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
30
A project management tool used to schedule,organize,and coordinate tasks within a project best defines
A)PERT.
B)TMAP.
C)SWOT.
D)Delphi.
A)PERT.
B)TMAP.
C)SWOT.
D)Delphi.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
31
Contraction rate is the duration at which the project can be compressed with available resources.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
32
The total path standard deviation can be calculated as the square root of the sum of variances of the critical path.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
33
Multitasking is when a resource is responsible for doing more than one activity at the same time.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
34
Benefits of networking project activities include
A)an estimate of time and cost at any point of a project.
B)the interdependence of the activities of a project.
C)a graphical representation of work to be performed.
D)all of the above.
A)an estimate of time and cost at any point of a project.
B)the interdependence of the activities of a project.
C)a graphical representation of work to be performed.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
35
Which of the following is a free,web-based project software package?
A)Microsoft Project
B)Zoho
C)Primavera
D)SAP PS
A)Microsoft Project
B)Zoho
C)Primavera
D)SAP PS
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
36
The standard deviation of the critical path is computed by summing the standard deviations of the activities.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
37
A plan to implement a project using an ordered sequence of activities with time allotted for each activity best defines
A)scheduling.
B)feasibility study.
C)thought process map.
D)quality functional deployment.
A)scheduling.
B)feasibility study.
C)thought process map.
D)quality functional deployment.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
38
Popular project management software packages include each of the following except
A)Primavera.
B)Zoho.
C)FastTrack.
D)Microsoft Access.
A)Primavera.
B)Zoho.
C)FastTrack.
D)Microsoft Access.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
39
Boeing used FastTrack for scheduling,tracking,and resource allocation throughout the Boeing 767 project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
40
Which of the following demands extensive hardware,is used by larger organizations,and may not be ideal for managers working with smaller projects?
A)Primavera
B)Zoho
C)FastTrack
D)SAP PS
A)Primavera
B)Zoho
C)FastTrack
D)SAP PS
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
41
Advantages of PERT include
A)inexpensive to maintain.
B)flexibility.
C)easy to use.
D)ability to identify interdependencies and problems between activities.
A)inexpensive to maintain.
B)flexibility.
C)easy to use.
D)ability to identify interdependencies and problems between activities.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
42
For an activity,assume the early start is 3 weeks,early finish is 6 weeks,late start is 4 weeks,and late finish is 7 weeks.What is the activity's slack?
A)3 weeks
B)4 weeks
C)1 week
D)2 weeks
A)3 weeks
B)4 weeks
C)1 week
D)2 weeks
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
43
PDM is useful because it provides
A)the start and end times of all activities.
B)expected project completion time.
C)the probability of completion at any given period during the project.
D)all of the above.
A)the start and end times of all activities.
B)expected project completion time.
C)the probability of completion at any given period during the project.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
44
Causing a delay to the whole project is called
A)acquired float.
B)total float.
C)accumulated float.
D)negative float.
A)acquired float.
B)total float.
C)accumulated float.
D)negative float.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
45
Which of the following is the longest path of the network,determines the total duration of the project,and is also the shortest amount of time necessary to accomplish the project?
A)burst path
B)critical path
C)project path
D)designated path
A)burst path
B)critical path
C)project path
D)designated path
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
46
Negative slack can occur due to
A)unavailability of resources.
B)resources were either incorrect or did not do their job right.
C)some activities slipped during project execution.
D)all of the above.
A)unavailability of resources.
B)resources were either incorrect or did not do their job right.
C)some activities slipped during project execution.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
47
For an activity,assume the early start is 12,early finish is 27,late start is 19,and late finish is 34.What is the activity's slack?
A)9
B)6
C)8
D)7
A)9
B)6
C)8
D)7
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
48
Causing a delay to a subsequent activity is called
A)free float.
B)designated slack.
C)reduced slack.
D)total float.
A)free float.
B)designated slack.
C)reduced slack.
D)total float.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
49
Which of the following is used in project planning because it helps a project manager to identify interdependencies and problems between various activities?
A)QFD
B)TMAP
C)PERT
D)SWOT
A)QFD
B)TMAP
C)PERT
D)SWOT
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
50
When constructing the PDM,an activity can have
A)predecessors with no successors.
B)successors with no predecessors.
C)both predecessors and successors.
D)all of the above.
A)predecessors with no successors.
B)successors with no predecessors.
C)both predecessors and successors.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
51
Which of the following usually occurs when the forward pass extends beyond the customer's requested end date?
A)negative slack
B)positive slack
C)proportional slack
D)designated slack
A)negative slack
B)positive slack
C)proportional slack
D)designated slack
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
52
A specific task,or set of tasks,that is part of the scope of a project,uses up some of the resources of a project,and requires some finite time to be completed best defines
A)activity.
B)deliverable.
C)SWOT summary.
D)product.
A)activity.
B)deliverable.
C)SWOT summary.
D)product.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
53
When working with project management software,factors that drive the calculation of time include each of the following except
A)resource assignments and types.
B)task dependencies.
C)task iterations.
D)project calendars.
A)resource assignments and types.
B)task dependencies.
C)task iterations.
D)project calendars.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
54
The shortest time in which an activity can be completed best defines
A)realistic time.
B)optimistic time.
C)pessimistic time.
D)designated time.
A)realistic time.
B)optimistic time.
C)pessimistic time.
D)designated time.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
55
Which of the following is used to help project managers plan,schedule,monitor,and control their projects?
A)PDM
B)SWOT
C)DFD
D)ERD
A)PDM
B)SWOT
C)DFD
D)ERD
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
56
Dependencies defined by the project team are
A)discretionary dependencies.
B)specific dependencies.
C)external dependencies.
D)mandatory dependencies.
A)discretionary dependencies.
B)specific dependencies.
C)external dependencies.
D)mandatory dependencies.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
57
The amount of time that an activity in a project network can be delayed without causing a delay to subsequent activities or project completion best defines
A)restricted flow.
B)task obstruction.
C)capacity.
D)slack.
A)restricted flow.
B)task obstruction.
C)capacity.
D)slack.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
58
Basic reasons for creating dependencies of project activities include each of the following except
A)external dependencies.
B)discretionary dependencies.
C)desirable dependencies.
D)mandatory dependencies.
A)external dependencies.
B)discretionary dependencies.
C)desirable dependencies.
D)mandatory dependencies.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
59
If prototype testing can be started only after the completion of the prototype,then this is an example of a(n)
A)external dependency.
B)discretionary dependency.
C)replicated dependency.
D)mandatory dependency.
A)external dependency.
B)discretionary dependency.
C)replicated dependency.
D)mandatory dependency.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
60
Dependencies involving relationships between the project and non-project activities best defines
A)mandatory dependencies.
B)external dependencies.
C)discretionary dependencies.
D)internal dependencies.
A)mandatory dependencies.
B)external dependencies.
C)discretionary dependencies.
D)internal dependencies.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
61
A method of planning and managing projects that are having difficulty due to lack of the resources required to execute project tasks best defines
A)quality functional deployment.
B)fishbone diagram.
C)critical chain project management.
D)thought process map.
A)quality functional deployment.
B)fishbone diagram.
C)critical chain project management.
D)thought process map.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
62
Which of the following includes activities performed more quickly than they normally would be performed?
A)relaxed program
B)floating program
C)reduced program
D)crashed program
A)relaxed program
B)floating program
C)reduced program
D)crashed program
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
63
Shortening an activity is called
A)float.
B)crash.
C)reduction.
D)smoothing.
A)float.
B)crash.
C)reduction.
D)smoothing.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
64
The ratio of rise and run of the project crash line describes
A)cost slope.
B)crash time.
C)crash buffer.
D)expected time.
A)cost slope.
B)crash time.
C)crash buffer.
D)expected time.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
65
If the optimistic time is 3,the most likely time is 5,and the pessimistic time is 7,then the expected time is
A)6)
B)5)
C)15.
D)4)
A)6)
B)5)
C)15.
D)4)
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
66
The completion time having the highest probability best defines
A)preferred time.
B)pessimistic time.
C)most likely time.
D)optimistic time.
A)preferred time.
B)pessimistic time.
C)most likely time.
D)optimistic time.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
67
In CCPM,a finite amount of time that can be added to a sequence of activities to non-critical tasks best describes
A)negative float.
B)safety float.
C)relaxed capacity.
D)feeding buffers.
A)negative float.
B)safety float.
C)relaxed capacity.
D)feeding buffers.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
68
An overall management philosophy introduced by Goldratt to help organizations continually achieve their goals best describes
A)six sigma.
B)theory of constraints.
C)scrum.
D)TMAP.
A)six sigma.
B)theory of constraints.
C)scrum.
D)TMAP.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
69
What is PDM? Why is it useful?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
70
The longest time that an activity might require best defines
A)expected time.
B)optimistic time.
C)most likely time.
D)pessimistic time.
A)expected time.
B)optimistic time.
C)most likely time.
D)pessimistic time.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
71
Identify and describe three dependencies of project activities.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
72
Identify five benefits of networking project activities.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
73
A scheduling approach driven by dates and deadlines best describes
A)quantitative scheduling.
B)effort-driven scheduling.
C)duration-based scheduling.
D)SWOT scheduling.
A)quantitative scheduling.
B)effort-driven scheduling.
C)duration-based scheduling.
D)SWOT scheduling.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
74
When using project management software,what are six factors that drive the calculation of time?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
75
A technique to shorten the duration of a project to meet the target dates best describes
A)project enhancement.
B)fast tracking.
C)thought process mapping.
D)quantitative project assessment.
A)project enhancement.
B)fast tracking.
C)thought process mapping.
D)quantitative project assessment.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
76
A scheduling approach driven by the quantity of assigned resources best describes
A)effort-driven scheduling.
B)duration-based scheduling.
C)event-based scheduling.
D)task-based scheduling.
A)effort-driven scheduling.
B)duration-based scheduling.
C)event-based scheduling.
D)task-based scheduling.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
77
The shortest time an activity can be completed assuming a reasonable level of resources best defines
A)activation.
B)response time.
C)crash time.
D)task reduction.
A)activation.
B)response time.
C)crash time.
D)task reduction.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
78
What is negative slack? Why does it occur?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
79
In CCPM,a definite amount of time that can be added at the end of the project is called
A)project buffer.
B)feeding buffer.
C)relaxed capacity.
D)safety buffer.
A)project buffer.
B)feeding buffer.
C)relaxed capacity.
D)safety buffer.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
80
Disadvantages of accelerating the duration of a project include
A)customer satisfaction may suffer.
B)sometimes adding manpower late to a software project makes it later.
C)scheduling overtime may cause problems with direct and intangible costs.
D)all of the above.
A)customer satisfaction may suffer.
B)sometimes adding manpower late to a software project makes it later.
C)scheduling overtime may cause problems with direct and intangible costs.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck