Deck 22: Supplement: Capacity Requirements Planning, MRP II, ERP, and DRP

Full screen (f)
exit full mode
Question
9)Work-in-process inventory builds up at the work station when ______.

A)load to a work center exceeds its existing capacity
B)load to a work center is lesser than its existing capacity
C)load to a work center is equal to its existing capacity
D)load to a work center is zero
Use Space or
up arrow
down arrow
to flip the card.
Question
10)In the context of a CRP system,a ______ represents the setup time plus run time required from a specific work center.

A)load
B)flow time
C)capacity
D)work schedule
Question
19)The process of setting loading limits on the amount of load assigned to each work center per period is ______.

A)finite loading
B)infinite loading
C)capacity loading
D)work center loading
Question
6)______ is accomplished by finite scheduling through the use of techniques such as input-output control.

A)Capacity requirements
B)Capacity planning
C)Capacity assessment
D)Capacity control
Question
4)Capacity planning for the ______.time range is called capacity requirements planning (CRP).

A)short
B)long
C)medium
D)extended
Question
2)A process that enables a company to analyze the capabilities of its operation system to determine whether the company has enough capacity to meet a proposed production schedule for a specified time frame is ______.

A)material resource planning (MRP)
B)capacity requirements planning (CRP)
C)distribution requirements planning (DRP)
D)enterprise resource planning (ERP)
Question
3)______ refers to the production capability of a facility per unit of time.

A)Capacity
B)Inventory buffer
C)Demand
D)Production volume
Question
1)Companies use ______ systems to systematically plan and control their logistics and product distribution activities.

A)material resource planning (MRP)
B)capacity requirements planning (CRP)
C)distribution requirements planning (DRP)
D)enterprise resource planning (ERP)
Question
13)Which of the following is NOT a key input to a CRP system?

A)planned order releases from MRP system
B)load information from work center
C)job times
D)delivery schedule
Question
15)Two hundred fifty units of Component X are scheduled for production.Each unit of X requires labor standard time of 2 hours per unit and machine standard time of 1 hour per unit.The standard machine hours of load requirements are ______.

A)250
B)500
C)400
D)350
Question
8)The amount of planned work scheduled and actual work assigned to a production facility for a specified period of time is a ______.

A)load
B)production volume
C)capacity
D)work schedule
Question
12)Capacity requirements planning (CRP)is most conducive for ______ production processes.

A)job-shop
B)intermittent
C)outlier
D)flow-shop
Question
7)Capacity planning activities work in tandem with ______ and include resource planning,rough-cut capacity planning,and capacity requirements planning.

A)priority control activities
B)priority planning activities
C)capacity control activities
D)capacity assessment activities
Question
5)Capacity decisions in the short term are referred to as ______.

A)capacity requirements
B)capacity planning
C)capacity assessment
D)capacity control
Question
11)The goal of ______ is to regulate both the flow of work orders and work center capacities in order to achieve a steady flow of work with minimal load back-up.

A)material resource planning (MRP)
B)distribution requirements planning (DRP)
C)capacity requirements planning (CRP)
D)enterprise resource planning (ERP)
Question
14)Two hundred fifty units of Component X are scheduled for production.Each unit of X requires labor standard time of 2 hours per unit and machine standard time of 1 hour per unit.The standard labor hours of load requirements are ______.

A)250
B)500
C)400
D)350
Question
16)The process of loading all the work centers without regard to the actual capacity available in the work center is ______

A)finite loading
B)infinite loading
C)capacity loading
D)work center loading
Question
20)______ is the division of a single lot into two or more sublots and simultaneously processing each sublot on identical (or very similar)work centers as separate lots.

A)Lot processing
B)Lot splitting
C)Lot allocating
D)Lot wrapping
Question
17)The advantage of ______ is that it enables planners to see the impact the planned order releases will have on the capacity required at the work centers.

A)capacity loading
B)infinite loading
C)finite loading
D)work center loading
Question
18)Finite loading is best suited for ______ capacity control decisions.

A)short-range
B)medium-range
C)long-range
D)extended-range
Question
25)The ______ system has a provision for feedback that enables plans generated by the system to be checked and adjusted.

A)open loop MRP
B)semi-open loop MRP
C)closed loop MRP
D)open loop CRP
Question
33)The ______ systems used in health care serve a similar function to organizations employing EPR systems.

A)electronic medical records
B)emergency medical records
C)enterprise medical records
D)expert medical records
Question
36)In which module of the ERP system is most of the product differentiation,including industry specific functionality,incorporated?

A)manufacturing
B)human resources management (HRM)
C)supply chain management (SCM)
D)finance and accounting
Question
39)Which module of the ERP system includes applications that provide customers with sales quotes,schedule orders,print shipping labels,generate leads,and create sales literature?

A)finance and accounting
B)human resources management (HRM)
C)customer resources management (CRM)
D)supply chain management (SCM)
Question
21)Which of the following statements is FALSE about CRP?

A)It is primarily applicable to job-shop production.
B)It requires large amounts of data.
C)It does not show the effect of master schedule revisions on achieving load balances.
D)It is primarily applicable to flow-shop production.
Question
23)Which of the following statements is true about open loop MRP systems?

A)There are provisions for feedback.
B)Plans and schedules are developed assuming finite capacity.
C)Plans and schedules are developed assuming on-time,correct delivery of materials ordered by suppliers.
D)Schedules are maintained by adjusting production plans when changes in demand occurred.
Question
22)Which of the following statements is FALSE about lot splitting?

A)It compresses lead times.
B)It reduces overloads.
C)It splits single lot into multiple sublots.
D)It increases lead times.
Question
31)______ identifies the key resources such as labor,machines,tools,space,and materials needed to produce one unit of a product.

A)A bill of resources
B)A production order
C)A planned order
D)A transfer order
Question
40)Which module of the ERP system includes tools for financial management,such as creating and adhering to budgets,cash-flow management,expense management,risk management,and tax management?

A)finance and accounting
B)human resources management (HRM)
C)customer resources management (CRM)
D)supply chain management (SCM)
Question
35)The following is data that can be entered into the ______ system: customer order entry,ripples through the enterprise changing inventory,production schedules,accounts payable,balance sheet,materials reordering,and shipping schedules.

A)manufacturing resource planning (MRP)
B)manufacturing resource planning (MRP II)
C)enterprise resource planning (ERP)
D)distribution requirements planning (DRP)
Question
24)The use of open loop MRP system leads to ______.

A)shop floor disruptions
B)on-time deliveries to customers
C)limited replanning
D)reduced costs
Question
29)Which of the following is NOT a benefit of MRP II systems?

A)better inventory control
B)escalated costs
C)efficient scheduling
D)improved relationships with suppliers
Question
32)A system that provides a real-time integrated view of a company's core business processes through information sharing to tie together the critical components of an organization to achieve cross-functional collaboration is ______.

A)manufacturing resource planning (MRP)
B)manufacturing resource planning (MRP II)
C)enterprise resource planning (ERP)
D)distribution requirements planning (DRP)
Question
37)Which module of the ERP system includes applications for managing payrolls,time and labor tracking,compensation management,employee recruitment,and planning workforce needs?

A)manufacturing
B)human resources management (HRM)
C)supply chain management (SCM)
D)finance and accounting
Question
27)Which of the following statements is FALSE about MRP II systems?

A)They create a detailed production schedule to coordinate the arrival of components with resources such as labor and machine availability.
B)They are an extension of a closed loop MRP system.
C)They add value at every phase,beginning with the purchase of materials,through the manufacturing facility to the shipping dock,where the product is packaged and send to end customer.
D)They lack tools to track employee attendance,labor contribution,and productivity.
Question
34)Which of the following statements is FALSE about ERP systems?

A)They use a centralized database with a common computing platform.
B)They standardize business processes for coordination of all resources and activities.
C)They require data to be entered multiple times into the system.
D)They integrate and automate flow of information across all departments within a company.
Question
30)______ is the coordination of all activities related to production by providing consistent data to all participants involved in various stages of the production process.

A)Manufacturing resource planning (MRP)
B)Manufacturing resource planning (MRP II)
C)Enterprise resource planning (ERP)
D)Distribution requirements planning (DRP)
Question
38)Which module of the ERP system includes applications for demand management,inventory management,distribution management,procurement,sourcing,and order management?

A)manufacturing
B)human resources management (HRM)
C)supply chain management (SCM)
D)finance and accounting
Question
26)Manufacturing resource planning (MRP II)is an extension of the ______ system.

A)open loop MRP
B)semi-open loop MRP
C)closed loop MRP
D)open loop CRP
Question
28)______ allows for the coordination of raw materials purchasing,whereas ______ facilitates the development of a detailed production schedule that accounts for machine and labor capacity and for scheduling the production runs.

A)MRP,MRP II
B)MRP II,MRP
C)MRP,CRP
D)MRP,DRP
Question
52)______ is a system used by companies to systematically plan and control their logistics and product distribution activities through generating a time-phased,inventory-replenishment plan to manage and minimize inventories in the supply chain.

A)manufacturing resource planning (MRP)
B)manufacturing resource planning (MRP II)
C)enterprise resource planning (ERP)
D)distribution requirements planning (DRP)
Question
49)The DRP process typically begins at the ______ level.

A)retail
B)customer
C)supplier
D)demand
Question
55)DRP is similar to ______.

A)a process map
B)an assembly chart
C)MRP
D)Pareto analysis
Question
50)DRP is a ______ system because demand at the retail level pulls the inventory and shipments through the supply chain

A)pull
B)push
C)proactive
D)continuous
Question
43)______ systems typically include modules that provide back-office support,customer relationship management,time management,expense management,resource management,and project management.

A)Service ERP
B)MRP
C)MRP II
D)DRP
Question
59)To meet the end customer order due dates,it is the responsibility of the master scheduling and MRP system to ensure that ______.

A)purchase orders are issued with the right prices at which materials are to be purchased
B)production and purchase orders are issued with valid due dates
C)the right quantities of materials are specified
D)the right personnel are hired for the company
Question
42)Business in the ______ sector have to first assess their operations' needs before selecting a specific ERP package.

A)manufacturing
B)service
C)mining
D)hospitality
Question
57)Which of the following statements is true with regard to a capacity requirements planning system and the MRP system?

A)A capacity requirements planning system operates in tandem with the MRP system.
B)A capacity requirements planning system operates in isolation from the MRP system.
C)Having both a capacity requirements planning system and an MRP system is redundant.
D)A capacity requirement planning system operates in parallel with the MRP system.
Question
54)DRP is used by companies to ______.

A)systematically plan and control their logistics and product distribution activities
B)manage inventory levels of finished products at distribution centers
C)ensure continuous improvement of the production process
D)integrate data across all functional areas
Question
47)Which of the following is NOT a benefit of the DRP system?

A)efficient inventory management
B)cost-efficient production process
C)unavailability of stock
D)meeting promised due dates
Question
48)By generating accurate forecasts of demand,time-phased delivery schedules can be developed.This is the underlying idea behind the ______ system.

A)manufacturing resource planning (MRP)
B)manufacturing resource planning (MRP II)
C)enterprise resource planning (ERP)
D)distribution requirements planning (DRP)
Question
56)ERP systems provide ______.

A)a real-time integrated view of a company's core business processes
B)a monthly report on the company's core business processes
C)a quarterly report on the company's core business processes
D)a daily report on the company's core business processes
Question
45)Improved availability of sufficient supplier capacity,improved accuracy of capacity plans,and paperwork reduction are benefits of ______ on supply chain performance.

A)service ERP systems
B)MRP systems
C)MRP II systems
D)DRP systems
Question
53)Companies make capacity planning decisions for the medium-term through ______.

A)capacity requirements planning (CRP)
B)capacity Pareto planning (CPP)
C)production requirements planning (PRP)
D)distribution requirements planning (DRP)
Question
41)Which of the following is a limitation of the ERP systems?

A)reduction in operating and administrative costs
B)creation of functional boundaries causing problems of accountability and confusion about the lines of responsibility
C)reduction in production and delivery lead times
D)provision of a real-time,enterprise-wide view of the business for faster and more effective decision-making
Question
44)Improved on-time delivery,improved quality performance,and improved supplier relations are benefits of ______ on supply chain performance.

A)service ERP systems
B)MRP systems
C)MRP II systems
D)DRP systems
Question
58)Which of the following statements is true with regard to capacity planning over different time horizons?

A)Capacity planning for the long term is called capacity requirements planning.
B)Capacity decisions in the long term are referred to as capacity control.
C)Capacity planning for the medium-time range is called capacity requirements planning.
D)Capacity planning for the short term is called capacity requirements planning.
Question
60)Which of the following is NOT one of the activities included under capacity planning?

A)resource planning
B)rough-cut capacity planning
C)finished products inventory planning
D)capacity requirements planning (CRP)
Question
46)Distribution requirements planning (DRP)is also referred to as ______.

A)distribution resource planning
B)distribution replenishment planning
C)distribution replacement planning
D)distribution retail planning
Question
51)Which of the following statements is FALSE about using ERP systems to promote greater sustainability?

A)The integration of all facets of an enterprise can contribute to manufacturer's sustainability efforts.
B)Standard ERP business modules can be integrated to support data from the many environmental sources that are affected by manufacturing activity.
C)Factoring in additional costs related to sustainable operations is always straightforward.
D)Vendors and users of ERP systems will need to consider how to rework their calculations for fixed assets,job costing,and many more applications in order to pursue sustainability.
Question
80)The amount of planned work scheduled and actual work assigned to a production facility for a specific period of time is called a ______.

A)sublot
B)load
C)batch
D)lot
Question
68)When CRP loads all the work centers without regard to the actual capacity available in the work center,this type of loading is called ______.

A)inconsiderate loading
B)infinite loading
C)overloading
D)finite loading
Question
76)Which of the following is NOT one of the limitations of CRP systems?

A)CRP is primarily applicable to job-shop production.
B)It requires large amounts of input data.
C)It is useful only for products involving continuous processing such as in oil refineries.
D)It does not show the effect of master schedule revisions on achieving load balances.
Question
78)Which of the following statements about MRP II is true?

A)When it was introduced,MRP II did not have any provision for feedback.
B)It was introduced in the 1990s.
C)It was introduced to replace CRP.
D)It is replaced by DRP.
Question
70)When loading limits are set on the amount of load assigned to each work center per period,this is referred to as ______.

A)finite loading
B)limited loading
C)controlled loading
D)managed loading
Question
61)Which of the following is the primary concern of capacity control?

A)making sufficient capacity available to execute jobs identified by detailed scheduling
B)making sure there is sufficient inventory of raw materials available to execute jobs
C)making sure the right production sequence is identified
D)making sure the right production sequence is followed
Question
71)When we use lot splitting,we ______.

A)divide a single lot into two or more sublots and process each sublot on similar work centers
B)divide a single lot into two or more sublots and manufacture each batch or sub lot in sequence
C)divide a single lot into two or more sublots and outsource the manufacture of one or more sublots
D)divide a single lot into multiple sublots and process each sublot on different work centers
Question
63)In the context of a CRP system,a load represents ______.

A)the setup time plus run time required from a specific work center
B)the product of the setup time and the run time required from a specific work center
C)the ratio of the setup time to the run time required from a specific work center
D)the difference between the setup time and the run time required from a specific work center
Question
69)An advantage of infinite loading is that it enables planners to ______.

A)see the impact that planned order releases will have on capacity required at work centers
B)adjust marketing efforts to match with available capacity
C)revise resource procurement to match with available capacity
D)relax any capacity constraints from production planning
Question
77)Which of the following is FALSE about MRP II?

A)It is an extension of MRP.
B)It was first introduced in the late 1960s.
C)It was introduced as an open loop MRP system.
D)It quickly replaced CRP.
Question
67)The CRP system converts tentative planned shop orders into standard hours of load by ______.

A)assessing the levels of inventory of finished product,given the availability of raw materials
B)multiplying each period's production quantity requirements by standard labor or equipment requirements per unit,or both
C)averaging the availability of resources per production hour
D)basing the calculations on the production volume from the preceding production period
Question
65)CRP systems,like MRP systems,are most useful for ______.

A)job-shop or batch production processes
B)continuous production processes
C)production of a single product
D)service operations
Question
74)If it is not possible to increase capacity,then ______.

A)the master schedule needs to be revised
B)marketing efforts need to be reduced
C)prices have to be increased (so less product will be demanded)
D)a new facility will have to be built to meet the demand
Question
64)The goal of CRP is to regulate both the flow of work orders and work center capacities in order to ______.

A)minimize production costs
B)maximize production volumes
C)minimize inventory of finished products
D)minimize load back-up with steady workflow
Question
75)If a master schedule has to be revised,then the manager may have to ______.

A)reassign priorities on some customer orders
B)cut corners on quality
C)reduce the quantity to be marketed
D)raise the pay for hourly workers
Question
62)In capacity requirements planning,we project or estimate ______.

A)the level of demand for each product that we are planning to produce
B)resource requirements for labor,equipment,and other production needs
C)the quantity of finished product to be stored in different distribution centers
D)the activities at each workstation to balance workload
Question
66)Which of the following is NOT a key input to a CRP system?

A)planned order releases from the MRP system
B)job times
C)inventory levels
D)routing information
Question
79)The process that enables a company to analyze the capabilities of its operations system to determine whether the company has enough capacity to meet a proposed production schedule for a specified time frame is called ______.

A)capacity requirements planning (CRP)
B)manufacturing resource planning (MRP II)
C)enterprise resource planning (ERP)
D)distribution requirements planning (DRP)
Question
73)Which of the following is NOT an acceptable way to increase capacity?

A)using overtime
B)transferring employees from idle work centers
C)subcontracting some of the work
D)reducing quality requirements
Question
72)Which of the following is NOT a consequence of lot splitting?

A)compresses lead time
B)reduces overloads
C)minimizes inventory
D)reduces the unit cost of production
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/100
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 22: Supplement: Capacity Requirements Planning, MRP II, ERP, and DRP
1
9)Work-in-process inventory builds up at the work station when ______.

A)load to a work center exceeds its existing capacity
B)load to a work center is lesser than its existing capacity
C)load to a work center is equal to its existing capacity
D)load to a work center is zero
A
2
10)In the context of a CRP system,a ______ represents the setup time plus run time required from a specific work center.

A)load
B)flow time
C)capacity
D)work schedule
A
3
19)The process of setting loading limits on the amount of load assigned to each work center per period is ______.

A)finite loading
B)infinite loading
C)capacity loading
D)work center loading
A
4
6)______ is accomplished by finite scheduling through the use of techniques such as input-output control.

A)Capacity requirements
B)Capacity planning
C)Capacity assessment
D)Capacity control
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
5
4)Capacity planning for the ______.time range is called capacity requirements planning (CRP).

A)short
B)long
C)medium
D)extended
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
6
2)A process that enables a company to analyze the capabilities of its operation system to determine whether the company has enough capacity to meet a proposed production schedule for a specified time frame is ______.

A)material resource planning (MRP)
B)capacity requirements planning (CRP)
C)distribution requirements planning (DRP)
D)enterprise resource planning (ERP)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
7
3)______ refers to the production capability of a facility per unit of time.

A)Capacity
B)Inventory buffer
C)Demand
D)Production volume
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
8
1)Companies use ______ systems to systematically plan and control their logistics and product distribution activities.

A)material resource planning (MRP)
B)capacity requirements planning (CRP)
C)distribution requirements planning (DRP)
D)enterprise resource planning (ERP)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
9
13)Which of the following is NOT a key input to a CRP system?

A)planned order releases from MRP system
B)load information from work center
C)job times
D)delivery schedule
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
10
15)Two hundred fifty units of Component X are scheduled for production.Each unit of X requires labor standard time of 2 hours per unit and machine standard time of 1 hour per unit.The standard machine hours of load requirements are ______.

A)250
B)500
C)400
D)350
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
11
8)The amount of planned work scheduled and actual work assigned to a production facility for a specified period of time is a ______.

A)load
B)production volume
C)capacity
D)work schedule
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
12
12)Capacity requirements planning (CRP)is most conducive for ______ production processes.

A)job-shop
B)intermittent
C)outlier
D)flow-shop
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
13
7)Capacity planning activities work in tandem with ______ and include resource planning,rough-cut capacity planning,and capacity requirements planning.

A)priority control activities
B)priority planning activities
C)capacity control activities
D)capacity assessment activities
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
14
5)Capacity decisions in the short term are referred to as ______.

A)capacity requirements
B)capacity planning
C)capacity assessment
D)capacity control
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
15
11)The goal of ______ is to regulate both the flow of work orders and work center capacities in order to achieve a steady flow of work with minimal load back-up.

A)material resource planning (MRP)
B)distribution requirements planning (DRP)
C)capacity requirements planning (CRP)
D)enterprise resource planning (ERP)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
16
14)Two hundred fifty units of Component X are scheduled for production.Each unit of X requires labor standard time of 2 hours per unit and machine standard time of 1 hour per unit.The standard labor hours of load requirements are ______.

A)250
B)500
C)400
D)350
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
17
16)The process of loading all the work centers without regard to the actual capacity available in the work center is ______

A)finite loading
B)infinite loading
C)capacity loading
D)work center loading
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
18
20)______ is the division of a single lot into two or more sublots and simultaneously processing each sublot on identical (or very similar)work centers as separate lots.

A)Lot processing
B)Lot splitting
C)Lot allocating
D)Lot wrapping
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
19
17)The advantage of ______ is that it enables planners to see the impact the planned order releases will have on the capacity required at the work centers.

A)capacity loading
B)infinite loading
C)finite loading
D)work center loading
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
20
18)Finite loading is best suited for ______ capacity control decisions.

A)short-range
B)medium-range
C)long-range
D)extended-range
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
21
25)The ______ system has a provision for feedback that enables plans generated by the system to be checked and adjusted.

A)open loop MRP
B)semi-open loop MRP
C)closed loop MRP
D)open loop CRP
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
22
33)The ______ systems used in health care serve a similar function to organizations employing EPR systems.

A)electronic medical records
B)emergency medical records
C)enterprise medical records
D)expert medical records
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
23
36)In which module of the ERP system is most of the product differentiation,including industry specific functionality,incorporated?

A)manufacturing
B)human resources management (HRM)
C)supply chain management (SCM)
D)finance and accounting
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
24
39)Which module of the ERP system includes applications that provide customers with sales quotes,schedule orders,print shipping labels,generate leads,and create sales literature?

A)finance and accounting
B)human resources management (HRM)
C)customer resources management (CRM)
D)supply chain management (SCM)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
25
21)Which of the following statements is FALSE about CRP?

A)It is primarily applicable to job-shop production.
B)It requires large amounts of data.
C)It does not show the effect of master schedule revisions on achieving load balances.
D)It is primarily applicable to flow-shop production.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
26
23)Which of the following statements is true about open loop MRP systems?

A)There are provisions for feedback.
B)Plans and schedules are developed assuming finite capacity.
C)Plans and schedules are developed assuming on-time,correct delivery of materials ordered by suppliers.
D)Schedules are maintained by adjusting production plans when changes in demand occurred.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
27
22)Which of the following statements is FALSE about lot splitting?

A)It compresses lead times.
B)It reduces overloads.
C)It splits single lot into multiple sublots.
D)It increases lead times.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
28
31)______ identifies the key resources such as labor,machines,tools,space,and materials needed to produce one unit of a product.

A)A bill of resources
B)A production order
C)A planned order
D)A transfer order
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
29
40)Which module of the ERP system includes tools for financial management,such as creating and adhering to budgets,cash-flow management,expense management,risk management,and tax management?

A)finance and accounting
B)human resources management (HRM)
C)customer resources management (CRM)
D)supply chain management (SCM)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
30
35)The following is data that can be entered into the ______ system: customer order entry,ripples through the enterprise changing inventory,production schedules,accounts payable,balance sheet,materials reordering,and shipping schedules.

A)manufacturing resource planning (MRP)
B)manufacturing resource planning (MRP II)
C)enterprise resource planning (ERP)
D)distribution requirements planning (DRP)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
31
24)The use of open loop MRP system leads to ______.

A)shop floor disruptions
B)on-time deliveries to customers
C)limited replanning
D)reduced costs
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
32
29)Which of the following is NOT a benefit of MRP II systems?

A)better inventory control
B)escalated costs
C)efficient scheduling
D)improved relationships with suppliers
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
33
32)A system that provides a real-time integrated view of a company's core business processes through information sharing to tie together the critical components of an organization to achieve cross-functional collaboration is ______.

A)manufacturing resource planning (MRP)
B)manufacturing resource planning (MRP II)
C)enterprise resource planning (ERP)
D)distribution requirements planning (DRP)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
34
37)Which module of the ERP system includes applications for managing payrolls,time and labor tracking,compensation management,employee recruitment,and planning workforce needs?

A)manufacturing
B)human resources management (HRM)
C)supply chain management (SCM)
D)finance and accounting
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
35
27)Which of the following statements is FALSE about MRP II systems?

A)They create a detailed production schedule to coordinate the arrival of components with resources such as labor and machine availability.
B)They are an extension of a closed loop MRP system.
C)They add value at every phase,beginning with the purchase of materials,through the manufacturing facility to the shipping dock,where the product is packaged and send to end customer.
D)They lack tools to track employee attendance,labor contribution,and productivity.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
36
34)Which of the following statements is FALSE about ERP systems?

A)They use a centralized database with a common computing platform.
B)They standardize business processes for coordination of all resources and activities.
C)They require data to be entered multiple times into the system.
D)They integrate and automate flow of information across all departments within a company.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
37
30)______ is the coordination of all activities related to production by providing consistent data to all participants involved in various stages of the production process.

A)Manufacturing resource planning (MRP)
B)Manufacturing resource planning (MRP II)
C)Enterprise resource planning (ERP)
D)Distribution requirements planning (DRP)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
38
38)Which module of the ERP system includes applications for demand management,inventory management,distribution management,procurement,sourcing,and order management?

A)manufacturing
B)human resources management (HRM)
C)supply chain management (SCM)
D)finance and accounting
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
39
26)Manufacturing resource planning (MRP II)is an extension of the ______ system.

A)open loop MRP
B)semi-open loop MRP
C)closed loop MRP
D)open loop CRP
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
40
28)______ allows for the coordination of raw materials purchasing,whereas ______ facilitates the development of a detailed production schedule that accounts for machine and labor capacity and for scheduling the production runs.

A)MRP,MRP II
B)MRP II,MRP
C)MRP,CRP
D)MRP,DRP
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
41
52)______ is a system used by companies to systematically plan and control their logistics and product distribution activities through generating a time-phased,inventory-replenishment plan to manage and minimize inventories in the supply chain.

A)manufacturing resource planning (MRP)
B)manufacturing resource planning (MRP II)
C)enterprise resource planning (ERP)
D)distribution requirements planning (DRP)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
42
49)The DRP process typically begins at the ______ level.

A)retail
B)customer
C)supplier
D)demand
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
43
55)DRP is similar to ______.

A)a process map
B)an assembly chart
C)MRP
D)Pareto analysis
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
44
50)DRP is a ______ system because demand at the retail level pulls the inventory and shipments through the supply chain

A)pull
B)push
C)proactive
D)continuous
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
45
43)______ systems typically include modules that provide back-office support,customer relationship management,time management,expense management,resource management,and project management.

A)Service ERP
B)MRP
C)MRP II
D)DRP
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
46
59)To meet the end customer order due dates,it is the responsibility of the master scheduling and MRP system to ensure that ______.

A)purchase orders are issued with the right prices at which materials are to be purchased
B)production and purchase orders are issued with valid due dates
C)the right quantities of materials are specified
D)the right personnel are hired for the company
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
47
42)Business in the ______ sector have to first assess their operations' needs before selecting a specific ERP package.

A)manufacturing
B)service
C)mining
D)hospitality
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
48
57)Which of the following statements is true with regard to a capacity requirements planning system and the MRP system?

A)A capacity requirements planning system operates in tandem with the MRP system.
B)A capacity requirements planning system operates in isolation from the MRP system.
C)Having both a capacity requirements planning system and an MRP system is redundant.
D)A capacity requirement planning system operates in parallel with the MRP system.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
49
54)DRP is used by companies to ______.

A)systematically plan and control their logistics and product distribution activities
B)manage inventory levels of finished products at distribution centers
C)ensure continuous improvement of the production process
D)integrate data across all functional areas
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
50
47)Which of the following is NOT a benefit of the DRP system?

A)efficient inventory management
B)cost-efficient production process
C)unavailability of stock
D)meeting promised due dates
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
51
48)By generating accurate forecasts of demand,time-phased delivery schedules can be developed.This is the underlying idea behind the ______ system.

A)manufacturing resource planning (MRP)
B)manufacturing resource planning (MRP II)
C)enterprise resource planning (ERP)
D)distribution requirements planning (DRP)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
52
56)ERP systems provide ______.

A)a real-time integrated view of a company's core business processes
B)a monthly report on the company's core business processes
C)a quarterly report on the company's core business processes
D)a daily report on the company's core business processes
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
53
45)Improved availability of sufficient supplier capacity,improved accuracy of capacity plans,and paperwork reduction are benefits of ______ on supply chain performance.

A)service ERP systems
B)MRP systems
C)MRP II systems
D)DRP systems
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
54
53)Companies make capacity planning decisions for the medium-term through ______.

A)capacity requirements planning (CRP)
B)capacity Pareto planning (CPP)
C)production requirements planning (PRP)
D)distribution requirements planning (DRP)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
55
41)Which of the following is a limitation of the ERP systems?

A)reduction in operating and administrative costs
B)creation of functional boundaries causing problems of accountability and confusion about the lines of responsibility
C)reduction in production and delivery lead times
D)provision of a real-time,enterprise-wide view of the business for faster and more effective decision-making
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
56
44)Improved on-time delivery,improved quality performance,and improved supplier relations are benefits of ______ on supply chain performance.

A)service ERP systems
B)MRP systems
C)MRP II systems
D)DRP systems
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
57
58)Which of the following statements is true with regard to capacity planning over different time horizons?

A)Capacity planning for the long term is called capacity requirements planning.
B)Capacity decisions in the long term are referred to as capacity control.
C)Capacity planning for the medium-time range is called capacity requirements planning.
D)Capacity planning for the short term is called capacity requirements planning.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
58
60)Which of the following is NOT one of the activities included under capacity planning?

A)resource planning
B)rough-cut capacity planning
C)finished products inventory planning
D)capacity requirements planning (CRP)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
59
46)Distribution requirements planning (DRP)is also referred to as ______.

A)distribution resource planning
B)distribution replenishment planning
C)distribution replacement planning
D)distribution retail planning
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
60
51)Which of the following statements is FALSE about using ERP systems to promote greater sustainability?

A)The integration of all facets of an enterprise can contribute to manufacturer's sustainability efforts.
B)Standard ERP business modules can be integrated to support data from the many environmental sources that are affected by manufacturing activity.
C)Factoring in additional costs related to sustainable operations is always straightforward.
D)Vendors and users of ERP systems will need to consider how to rework their calculations for fixed assets,job costing,and many more applications in order to pursue sustainability.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
61
80)The amount of planned work scheduled and actual work assigned to a production facility for a specific period of time is called a ______.

A)sublot
B)load
C)batch
D)lot
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
62
68)When CRP loads all the work centers without regard to the actual capacity available in the work center,this type of loading is called ______.

A)inconsiderate loading
B)infinite loading
C)overloading
D)finite loading
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
63
76)Which of the following is NOT one of the limitations of CRP systems?

A)CRP is primarily applicable to job-shop production.
B)It requires large amounts of input data.
C)It is useful only for products involving continuous processing such as in oil refineries.
D)It does not show the effect of master schedule revisions on achieving load balances.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
64
78)Which of the following statements about MRP II is true?

A)When it was introduced,MRP II did not have any provision for feedback.
B)It was introduced in the 1990s.
C)It was introduced to replace CRP.
D)It is replaced by DRP.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
65
70)When loading limits are set on the amount of load assigned to each work center per period,this is referred to as ______.

A)finite loading
B)limited loading
C)controlled loading
D)managed loading
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
66
61)Which of the following is the primary concern of capacity control?

A)making sufficient capacity available to execute jobs identified by detailed scheduling
B)making sure there is sufficient inventory of raw materials available to execute jobs
C)making sure the right production sequence is identified
D)making sure the right production sequence is followed
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
67
71)When we use lot splitting,we ______.

A)divide a single lot into two or more sublots and process each sublot on similar work centers
B)divide a single lot into two or more sublots and manufacture each batch or sub lot in sequence
C)divide a single lot into two or more sublots and outsource the manufacture of one or more sublots
D)divide a single lot into multiple sublots and process each sublot on different work centers
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
68
63)In the context of a CRP system,a load represents ______.

A)the setup time plus run time required from a specific work center
B)the product of the setup time and the run time required from a specific work center
C)the ratio of the setup time to the run time required from a specific work center
D)the difference between the setup time and the run time required from a specific work center
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
69
69)An advantage of infinite loading is that it enables planners to ______.

A)see the impact that planned order releases will have on capacity required at work centers
B)adjust marketing efforts to match with available capacity
C)revise resource procurement to match with available capacity
D)relax any capacity constraints from production planning
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
70
77)Which of the following is FALSE about MRP II?

A)It is an extension of MRP.
B)It was first introduced in the late 1960s.
C)It was introduced as an open loop MRP system.
D)It quickly replaced CRP.
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
71
67)The CRP system converts tentative planned shop orders into standard hours of load by ______.

A)assessing the levels of inventory of finished product,given the availability of raw materials
B)multiplying each period's production quantity requirements by standard labor or equipment requirements per unit,or both
C)averaging the availability of resources per production hour
D)basing the calculations on the production volume from the preceding production period
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
72
65)CRP systems,like MRP systems,are most useful for ______.

A)job-shop or batch production processes
B)continuous production processes
C)production of a single product
D)service operations
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
73
74)If it is not possible to increase capacity,then ______.

A)the master schedule needs to be revised
B)marketing efforts need to be reduced
C)prices have to be increased (so less product will be demanded)
D)a new facility will have to be built to meet the demand
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
74
64)The goal of CRP is to regulate both the flow of work orders and work center capacities in order to ______.

A)minimize production costs
B)maximize production volumes
C)minimize inventory of finished products
D)minimize load back-up with steady workflow
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
75
75)If a master schedule has to be revised,then the manager may have to ______.

A)reassign priorities on some customer orders
B)cut corners on quality
C)reduce the quantity to be marketed
D)raise the pay for hourly workers
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
76
62)In capacity requirements planning,we project or estimate ______.

A)the level of demand for each product that we are planning to produce
B)resource requirements for labor,equipment,and other production needs
C)the quantity of finished product to be stored in different distribution centers
D)the activities at each workstation to balance workload
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
77
66)Which of the following is NOT a key input to a CRP system?

A)planned order releases from the MRP system
B)job times
C)inventory levels
D)routing information
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
78
79)The process that enables a company to analyze the capabilities of its operations system to determine whether the company has enough capacity to meet a proposed production schedule for a specified time frame is called ______.

A)capacity requirements planning (CRP)
B)manufacturing resource planning (MRP II)
C)enterprise resource planning (ERP)
D)distribution requirements planning (DRP)
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
79
73)Which of the following is NOT an acceptable way to increase capacity?

A)using overtime
B)transferring employees from idle work centers
C)subcontracting some of the work
D)reducing quality requirements
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
80
72)Which of the following is NOT a consequence of lot splitting?

A)compresses lead time
B)reduces overloads
C)minimizes inventory
D)reduces the unit cost of production
Unlock Deck
Unlock for access to all 100 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 100 flashcards in this deck.