Deck 1: Introduction to Project Management

Full screen (f)
exit full mode
Question
A project manager needs to be concerned with achieving desired scope and quality (often called performance),subject to constraints of time and cost.
Use Space or
up arrow
down arrow
to flip the card.
Question
Resource Management,one of the ten PMBOK Guide Knowledge Areas,is comprised of the processes to identify,acquire,and manage resources needed to successfully complete the project.
Question
Most companies with well-developed project management systems insist that a project must pass an approval of some kind to move from one life cycle stage to the next.
Question
Project customers can be either internal or external to the organization.
Question
Cost Management,one of the ten PMBOK Guide Knowledge Areas,includes the processes involved in planning,estimating,budgeting,financing,funding,managing and controlling costs so that the project can be completed within the approved budget.
Question
In reality,many projects are fully successful in some ways,but less successful in others.
Question
A project is a lasting endeavor undertaken to maintain a reliable product or service.
Question
Many different project life cycle models are used for different types of projects,such as information systems,improvement,research and development,and construction.
Question
Generally,the pace of work and amount of money spent remains consistent from one life cycle stage to another.
Question
Some projects are considered successful if they reap business benefits like increased profitability,even if completed late or over budget.
Question
The name and number of phases in a project life cycle are determined by the organization(s)involved in the project.
Question
Scope Management,one of the 10 PMBOK Guide Knowledge Areas, includes the processes to manage timely completion of the project.
Question
The only critical measures of project success are completing the project on schedule and on budget.
Question
Project plans and goals become more specific as early work is completed.
Question
Operations consist of the ongoing work needed to ensure that an organization continues to function effectively.
Question
Integration Management,one of the 10 PMBOK Guide Knowledge Areas,represents the processes and activities to identify,define,combine,unify,and coordinate the various processes and project management activities.
Question
A project is a time-bound effort constrained by performance specifications,resources,and budget to create a unique product or service.
Question
Communications Management,one of the ten PMBOK Guide Knowledge Areas,entails the processes to identify the people,groups,or organizations,that could impact or be impacted by the project,analyze their expectations and impact,and develop strategies for engaging them in project decisions and execution.
Question
Projects are subject to limitations of time and resources such as money and people.
Question
All projects go through a common project life cycle that includes four stages: concept,development,production and close-out.
Question
All of the following factors have influenced the increased reliance upon project management in recent years EXCEPT:​ 

A) rapid growth and changes in the information technology and telecommunications industries 
B) realization that methods for large projects can be modified and used for small projects 
C) increased competition in the global economy and its influence on market demand 
D) the steady demands of ongoing operational work
Question
In agile projects,the customer representative role is passive,and their involvement is typically limited to the early stages of the project.
Question
The Project Management Office (PMO)is comprised of the top leader in the organization (CEO or other officer)and his or her direct reports.
Question
Which of the ten knowledge areas defined in the Project Management Body of Knowledge includes the activities of purchasing or acquiring products,services or results from outside the project team?​ 

A) Scope management 
B) Quality management 
C) Communications management 
D) Procurement management
Question
Once projects are completed,they will typically yield all of the following results EXCEPT:​ 

A) a unique product or service  
B) make or buy decisions 
C) stakeholders whose interests are affected by the outcome 
D) a primary deliverable along with supporting deliverables
Question
Which of the following examples is NOT a typical or appropriate situation to employ project management?​ 

A) improving a soldering process in an assembly line 
B) processing deposits and withdrawals in a bank 
C) installing a new accounting application on a server 
D) developing a new medical device for use by clinics
Question
Which of the following statements correctly describes project management?​ 

A) Project management uses knowledge, skills, tools and techniques to meet stakeholder needs and expectations 
B) Project management should not involve tradeoffs between scope, schedule and cost. 
C) Project management only relies upon checklists to plan and execute the work. 
D) Project management's goal is to maintain efficiency of ongoing operations.
Question
Which of the ten knowledge areas defined in the Project Management Body of Knowledge includes the processes required to ensure that the project includes all the work required,and only the work required,to complete the project successfully? 

A) Scope management 
B) Quality management 
C) Communications management 
D) Stakeholder management
Question
When applied to project management,the resource management knowledge area typically involves which of the following processes?​ 

A) ensuring the project includes all the work required, and only the work required, to complete the project successfully 
B) planning, estimating, budgeting, financing,  funding, managing and controlling costs 
C) conducting risk management planning, identification, analysis, response planning & implementation, and monitoring 
D) identifying, acquiring, and managing resources needed to successfully complete the project
Question
Projects are considered successful for all of the reasons below EXCEPT:​ 

A) members of the team learn new skills and/or refine existing skills  
B) organizational learning takes place and is captured for future projects 
C) the team has used heroics to meet project objectives 
D) the performing organization reaps business-level benefits.
Question
Which of the following actions will likely cause a project to fail?​ 

A) dedicating valuable team member time to identify risk events 
B) spending project funds to procure needed tools and spare parts 
C) unclear or unrealistic stakeholder expectations 
D) conducting a project audit to evaluate performance
Question
In the PMBOK,the logical groupings of the five project management processes to achieve specific project objectives are called the: 

A) project management knowledge areas 
B) project management process groups 
C) life cycle stages 
D) phases and gates
Question
The project manager is the person assigned by the performing organization to lead the team that is responsible for achieving the project objectives.
Question
Projects often require tradeoffs among all of the following EXCEPT:​ 

A) scope 
B) cost 
C) schedule 
D) programs
Question
In an adaptive or change - driven project life cycle: 

A) the product is well understood. 
B) all planning precedes all executing. 
C) early results lead into planning later work. 
D) the waterfall approach is commonly used.
Question
A project manager in agile projects who serves and leads in a collaborative,facilitating manner is called a:​ 

A) program manager 
B) scrum master 
C) sponsor 
D) functional manager
Question
Project failure can result from all of the following causes EXCEPT:​ 

A) adequate support from executive management 
B) inadequate planning  
C) unrealistic time demands 
D) incomplete or unclear requirements
Question
Which of the following examples is NOT a typical or appropriate situation to employ project management?​ 

A) improving an existing work process 
B) installing a new computer system 
C) conducting a routine, standard customer service operation 
D) developing a new product
Question
Achieving project success is determined by all of the following EXCEPT:​ 

A) creating deliverables that include all required features 
B) involving only important key stakeholders 
C) completing the project on schedule and on budget 
D) providing outputs that please the project's customers
Question
Which of the following statements regarding project life cycles is most accurate?​ 

A) All research and development projects use the same four-stage project life cycle model. 
B) The project life cycle is the same for the diverse types of projects managed by an organization. 
C) Many different project life cycle models are used for different types of projects. 
D) Project life cycles are very similar regardless of the industry.
Question
Top management leadership is often cited as a factor that is critical to project success.Describe the key project-related activities of the steering or leadership team,the PMO,and the sponsor.
Question
Compare and contrast predictive,or plan-driven project life cycles with agile,or change-driven life cycles.When might each type of life cycle be appropriate?
Question
Contrast project management with operations management.How do these differences impact the approach required to manage a project successfully?
Question
Project managers frequently face competing constraints.Identify these common constraints and describe approaches that project managers can use to make the trade-offs required to succeed.
Question
The Project Management Body of Knowledge (PMBOK® Guide)published by the Project Management Institute identifies five process groups.Briefly identify and describe each of these five process groups.
Question
Typically,the senior customer representative is responsible for which of the following project roles?​ 

A) develops the project schedule and budget 
B) determines how the project work will be accomplished 
C) ensures requirements are clear and communications are maintained throughout the project 
D) helps the project manager with running meetings and providing status reports
Question
From an agile project management perspective,which of these constraints are considered to be fixed? 

A) Quality and value
B) Resources and schedule 
C) Scope and time
D) Customer satisfaction
Question
Which of the following roles is typically associated with the project manager?​ 

A) assigned by the performing organization to lead the team that is responsible for achieving the project objectives 
B) an ongoing manager of the organization with with responsibility for a department or division 
C) supports projects by mentoring, training and assisting teams and facilitating sharing of resources and methodologies 
D) a senior manager serving in a formal role, given authority and responsibility for successful completion of a project
Question
Typically,a steering team or leadership team is responsible for all of the following project related roles EXCEPT:​ 

A) selecting, prioritizing and resourcing projects 
B) standardizing project-related governance processes to facilitate sharing of methodologies, tools & techniques 
C) ensuring accurate progress is reported and adjustments made 
D) evaluating projects and portfolios midstream to ensure they produce expected results
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/49
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 1: Introduction to Project Management
1
A project manager needs to be concerned with achieving desired scope and quality (often called performance),subject to constraints of time and cost.
True
2
Resource Management,one of the ten PMBOK Guide Knowledge Areas,is comprised of the processes to identify,acquire,and manage resources needed to successfully complete the project.
True
3
Most companies with well-developed project management systems insist that a project must pass an approval of some kind to move from one life cycle stage to the next.
True
4
Project customers can be either internal or external to the organization.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
5
Cost Management,one of the ten PMBOK Guide Knowledge Areas,includes the processes involved in planning,estimating,budgeting,financing,funding,managing and controlling costs so that the project can be completed within the approved budget.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
6
In reality,many projects are fully successful in some ways,but less successful in others.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
7
A project is a lasting endeavor undertaken to maintain a reliable product or service.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
8
Many different project life cycle models are used for different types of projects,such as information systems,improvement,research and development,and construction.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
9
Generally,the pace of work and amount of money spent remains consistent from one life cycle stage to another.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
10
Some projects are considered successful if they reap business benefits like increased profitability,even if completed late or over budget.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
11
The name and number of phases in a project life cycle are determined by the organization(s)involved in the project.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
12
Scope Management,one of the 10 PMBOK Guide Knowledge Areas, includes the processes to manage timely completion of the project.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
13
The only critical measures of project success are completing the project on schedule and on budget.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
14
Project plans and goals become more specific as early work is completed.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
15
Operations consist of the ongoing work needed to ensure that an organization continues to function effectively.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
16
Integration Management,one of the 10 PMBOK Guide Knowledge Areas,represents the processes and activities to identify,define,combine,unify,and coordinate the various processes and project management activities.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
17
A project is a time-bound effort constrained by performance specifications,resources,and budget to create a unique product or service.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
18
Communications Management,one of the ten PMBOK Guide Knowledge Areas,entails the processes to identify the people,groups,or organizations,that could impact or be impacted by the project,analyze their expectations and impact,and develop strategies for engaging them in project decisions and execution.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
19
Projects are subject to limitations of time and resources such as money and people.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
20
All projects go through a common project life cycle that includes four stages: concept,development,production and close-out.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
21
All of the following factors have influenced the increased reliance upon project management in recent years EXCEPT:​ 

A) rapid growth and changes in the information technology and telecommunications industries 
B) realization that methods for large projects can be modified and used for small projects 
C) increased competition in the global economy and its influence on market demand 
D) the steady demands of ongoing operational work
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
22
In agile projects,the customer representative role is passive,and their involvement is typically limited to the early stages of the project.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
23
The Project Management Office (PMO)is comprised of the top leader in the organization (CEO or other officer)and his or her direct reports.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
24
Which of the ten knowledge areas defined in the Project Management Body of Knowledge includes the activities of purchasing or acquiring products,services or results from outside the project team?​ 

A) Scope management 
B) Quality management 
C) Communications management 
D) Procurement management
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
25
Once projects are completed,they will typically yield all of the following results EXCEPT:​ 

A) a unique product or service  
B) make or buy decisions 
C) stakeholders whose interests are affected by the outcome 
D) a primary deliverable along with supporting deliverables
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following examples is NOT a typical or appropriate situation to employ project management?​ 

A) improving a soldering process in an assembly line 
B) processing deposits and withdrawals in a bank 
C) installing a new accounting application on a server 
D) developing a new medical device for use by clinics
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
27
Which of the following statements correctly describes project management?​ 

A) Project management uses knowledge, skills, tools and techniques to meet stakeholder needs and expectations 
B) Project management should not involve tradeoffs between scope, schedule and cost. 
C) Project management only relies upon checklists to plan and execute the work. 
D) Project management's goal is to maintain efficiency of ongoing operations.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
28
Which of the ten knowledge areas defined in the Project Management Body of Knowledge includes the processes required to ensure that the project includes all the work required,and only the work required,to complete the project successfully? 

A) Scope management 
B) Quality management 
C) Communications management 
D) Stakeholder management
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
29
When applied to project management,the resource management knowledge area typically involves which of the following processes?​ 

A) ensuring the project includes all the work required, and only the work required, to complete the project successfully 
B) planning, estimating, budgeting, financing,  funding, managing and controlling costs 
C) conducting risk management planning, identification, analysis, response planning & implementation, and monitoring 
D) identifying, acquiring, and managing resources needed to successfully complete the project
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
30
Projects are considered successful for all of the reasons below EXCEPT:​ 

A) members of the team learn new skills and/or refine existing skills  
B) organizational learning takes place and is captured for future projects 
C) the team has used heroics to meet project objectives 
D) the performing organization reaps business-level benefits.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following actions will likely cause a project to fail?​ 

A) dedicating valuable team member time to identify risk events 
B) spending project funds to procure needed tools and spare parts 
C) unclear or unrealistic stakeholder expectations 
D) conducting a project audit to evaluate performance
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
32
In the PMBOK,the logical groupings of the five project management processes to achieve specific project objectives are called the: 

A) project management knowledge areas 
B) project management process groups 
C) life cycle stages 
D) phases and gates
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
33
The project manager is the person assigned by the performing organization to lead the team that is responsible for achieving the project objectives.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
34
Projects often require tradeoffs among all of the following EXCEPT:​ 

A) scope 
B) cost 
C) schedule 
D) programs
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
35
In an adaptive or change - driven project life cycle: 

A) the product is well understood. 
B) all planning precedes all executing. 
C) early results lead into planning later work. 
D) the waterfall approach is commonly used.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
36
A project manager in agile projects who serves and leads in a collaborative,facilitating manner is called a:​ 

A) program manager 
B) scrum master 
C) sponsor 
D) functional manager
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
37
Project failure can result from all of the following causes EXCEPT:​ 

A) adequate support from executive management 
B) inadequate planning  
C) unrealistic time demands 
D) incomplete or unclear requirements
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
38
Which of the following examples is NOT a typical or appropriate situation to employ project management?​ 

A) improving an existing work process 
B) installing a new computer system 
C) conducting a routine, standard customer service operation 
D) developing a new product
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
39
Achieving project success is determined by all of the following EXCEPT:​ 

A) creating deliverables that include all required features 
B) involving only important key stakeholders 
C) completing the project on schedule and on budget 
D) providing outputs that please the project's customers
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
40
Which of the following statements regarding project life cycles is most accurate?​ 

A) All research and development projects use the same four-stage project life cycle model. 
B) The project life cycle is the same for the diverse types of projects managed by an organization. 
C) Many different project life cycle models are used for different types of projects. 
D) Project life cycles are very similar regardless of the industry.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
41
Top management leadership is often cited as a factor that is critical to project success.Describe the key project-related activities of the steering or leadership team,the PMO,and the sponsor.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
42
Compare and contrast predictive,or plan-driven project life cycles with agile,or change-driven life cycles.When might each type of life cycle be appropriate?
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
43
Contrast project management with operations management.How do these differences impact the approach required to manage a project successfully?
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
44
Project managers frequently face competing constraints.Identify these common constraints and describe approaches that project managers can use to make the trade-offs required to succeed.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
45
The Project Management Body of Knowledge (PMBOK® Guide)published by the Project Management Institute identifies five process groups.Briefly identify and describe each of these five process groups.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
46
Typically,the senior customer representative is responsible for which of the following project roles?​ 

A) develops the project schedule and budget 
B) determines how the project work will be accomplished 
C) ensures requirements are clear and communications are maintained throughout the project 
D) helps the project manager with running meetings and providing status reports
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
47
From an agile project management perspective,which of these constraints are considered to be fixed? 

A) Quality and value
B) Resources and schedule 
C) Scope and time
D) Customer satisfaction
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
48
Which of the following roles is typically associated with the project manager?​ 

A) assigned by the performing organization to lead the team that is responsible for achieving the project objectives 
B) an ongoing manager of the organization with with responsibility for a department or division 
C) supports projects by mentoring, training and assisting teams and facilitating sharing of resources and methodologies 
D) a senior manager serving in a formal role, given authority and responsibility for successful completion of a project
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
49
Typically,a steering team or leadership team is responsible for all of the following project related roles EXCEPT:​ 

A) selecting, prioritizing and resourcing projects 
B) standardizing project-related governance processes to facilitate sharing of methodologies, tools & techniques 
C) ensuring accurate progress is reported and adjustments made 
D) evaluating projects and portfolios midstream to ensure they produce expected results
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 49 flashcards in this deck.