Deck 1: An Overview of the Building Delivery Process How Buildings Come Into Being
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/80
Play
Full screen (f)
Deck 1: An Overview of the Building Delivery Process How Buildings Come Into Being
1
The specifications of a typical building project are prepared by the
A)architect in collaboration with the GC and the architect's consultants.
B)architect.
C)architect and the architect's consultants.
D)architect in collaboration with the GC.
E)none of the above.
A)architect in collaboration with the GC and the architect's consultants.
B)architect.
C)architect and the architect's consultants.
D)architect in collaboration with the GC.
E)none of the above.
C
2
In MasterFormat, roofing is part of
A)Division 10.
B)Division 07.
C)Division 08.
D)Division 11.
E)Division 09.
A)Division 10.
B)Division 07.
C)Division 08.
D)Division 11.
E)Division 09.
B
3
The program for a building project is prepared by the
A)architect.
B)building official of the city.
C)general contractor.
D)owner.
E)all of the above collectively.
A)architect.
B)building official of the city.
C)general contractor.
D)owner.
E)all of the above collectively.
D
4
The construction document set consists of
A)construction drawings, construction schedule, and owner- contractor agreement.
B)construction drawings.
C)construction drawings and construction schedule.
D)construction drawings and specifications.
E)construction drawings, construction schedule, and specifications.
A)construction drawings, construction schedule, and owner- contractor agreement.
B)construction drawings.
C)construction drawings and construction schedule.
D)construction drawings and specifications.
E)construction drawings, construction schedule, and specifications.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
5
In MasterFormat, Division 02 refers to
A)Procurement and Contracting Requirements.
B)Masonry.
C)Metals.
D)General Requirements.
E)none of the above.
A)Procurement and Contracting Requirements.
B)Masonry.
C)Metals.
D)General Requirements.
E)none of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
6
The construction drawings of a building project are prepared during the
A)DD stage of the project.
B)CD stage of the project.
C)preconstruction phase of the project.
D)SD stage of the project.
E)construction phase of the project.
A)DD stage of the project.
B)CD stage of the project.
C)preconstruction phase of the project.
D)SD stage of the project.
E)construction phase of the project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
7
The term MEP is an acronym for
A)mechanical, electrical, and plumbing.
B)mechanical and electrical plans.
C)municipal emergency plan.
D)mechanical, electrical, and piping.
E)mechanical and electrical plant.
A)mechanical, electrical, and plumbing.
B)mechanical and electrical plans.
C)municipal emergency plan.
D)mechanical, electrical, and piping.
E)mechanical and electrical plant.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
8
In a typical building project, the coordination of the building's design is done by the
A)general contractor.
B)owner.
C)architect.
D)building official of the city.
E)any one of the above, depending on the type of building.
A)general contractor.
B)owner.
C)architect.
D)building official of the city.
E)any one of the above, depending on the type of building.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
9
In MasterFormat, Division 04 refers to
A)General Requirements.
B)Metals.
C)Existing Conditions.
D)Masonry.
E)none of the above.
A)General Requirements.
B)Metals.
C)Existing Conditions.
D)Masonry.
E)none of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
10
The bidding documents include
A)construction drawings, specifications, addenda, and contract modifications.
B)construction drawings, specifications, and addenda.
C)construction drawings and specifications.
D)construction drawings.
E)none of the above.
A)construction drawings, specifications, addenda, and contract modifications.
B)construction drawings, specifications, and addenda.
C)construction drawings and specifications.
D)construction drawings.
E)none of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
11
Who is responsible for ensuring the safety of workers on the construction site of a typical building project?
A)The general contractor
B)The structural engineer
C)Occupation Safety and Health Administration of the U.S. Government
D)The architect
E)All of the above collectively
A)The general contractor
B)The structural engineer
C)Occupation Safety and Health Administration of the U.S. Government
D)The architect
E)All of the above collectively
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
12
The delivery of a typical building project, as described in this text, may be divided into
A)two phases.
B)three phases.
C)four phases.
D)five phases.
E)six phases.
A)two phases.
B)three phases.
C)four phases.
D)five phases.
E)six phases.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
13
MasterFormat consists of
A)20 divisions.
B)30 divisions.
C)40 divisions.
D)50 divisions.
E)none of the above.
A)20 divisions.
B)30 divisions.
C)40 divisions.
D)50 divisions.
E)none of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
14
In MasterFormat, flooring is part of
A)Division 07.
B)Division 08.
C)Division 09.
D)Division 05.
E)Division 06.
A)Division 07.
B)Division 08.
C)Division 09.
D)Division 05.
E)Division 06.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
15
Establishing the project's economic feasibility and its overall budget is part of the design phase of the project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
16
The construction drawings of a building project are generally in the form of
A)freehand sketches.
B)three- dimensional drawings.
C)photographs of three- dimensional scale model(s).
D)two- dimensional plans, elevations, sections, and details.
E)all of the above.
A)freehand sketches.
B)three- dimensional drawings.
C)photographs of three- dimensional scale model(s).
D)two- dimensional plans, elevations, sections, and details.
E)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
17
The construction drawings of a building project are drawings that the architect uses to explain the design to the owner.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
18
The construction drawings for a building project generally consist of
A)architectural drawings, structural drawings, and MEP drawings.
B)architectural drawings and structural drawings.
C)architectural drawings, structural drawings, MEP, and QSA drawings.
D)architectural drawings, structural drawings, and QSA drawings.
E)none of the above.
A)architectural drawings, structural drawings, and MEP drawings.
B)architectural drawings and structural drawings.
C)architectural drawings, structural drawings, MEP, and QSA drawings.
D)architectural drawings, structural drawings, and QSA drawings.
E)none of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
19
MasterFormat has been developed by the
A)Associated General Contractors of America.
B)American National Standards Institute.
C)American Institute of Architects.
D)Construction Specifications Institute.
E)American Society for Testing and Materials.
A)Associated General Contractors of America.
B)American National Standards Institute.
C)American Institute of Architects.
D)Construction Specifications Institute.
E)American Society for Testing and Materials.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
20
In MasterFormat, windows are part of
A)Division 06.
B)Division 05.
C)Division 07.
D)Division 04.
E)none of the above.
A)Division 06.
B)Division 05.
C)Division 07.
D)Division 04.
E)none of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
21
The shop drawings are prepared by the
A)structural engineer.
B)architect.
C)MEP engineer.
D)all of the above.
E)none of the above.
A)structural engineer.
B)architect.
C)MEP engineer.
D)all of the above.
E)none of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
22
When does the owner receive manufacturers' warranties from the GC?
A)At final completion inspection
B)Within one week of the GC receiving warranties from the respective manufacturer or subcontractor
C)At substantial completion inspection
D)None of the above
A)At final completion inspection
B)Within one week of the GC receiving warranties from the respective manufacturer or subcontractor
C)At substantial completion inspection
D)None of the above
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
23
A record document set includes
A)as- built construction drawings.
B)a record of all communications among the owner, architect, and the GC.
C)a record of all communications between the owner and the GC.
D)as- built construction drawings, as- built specifications, as- built shop drawings, etc.
E)none of the above.
A)as- built construction drawings.
B)a record of all communications among the owner, architect, and the GC.
C)a record of all communications between the owner and the GC.
D)as- built construction drawings, as- built specifications, as- built shop drawings, etc.
E)none of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
24
The certificate of substantial completion is issued by the local jurisdiction.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
25
In which of the following project delivery methods does the GC provide preconstruction services?
A)DBB Method: Competitive Sealed Proposal
B)DBB Method: Invitational Bidding
C)DBB Method: Competitive Sealed Bidding
D)All of the above
E)None of the above
A)DBB Method: Competitive Sealed Proposal
B)DBB Method: Invitational Bidding
C)DBB Method: Competitive Sealed Bidding
D)All of the above
E)None of the above
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
26
The final completion inspection of the project is conducted by the
A)building official of the city.
B)owner with the help of the architect.
C)architect.
D)architect and the building official of the city.
E)architect with the help of consultants.
A)building official of the city.
B)owner with the help of the architect.
C)architect.
D)architect and the building official of the city.
E)architect with the help of consultants.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
27
The project manual includes the project's construction drawings.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
28
The owner is required to provide payment bond to the GC whose bid has been accepted
A)when the owner gives the notice to GC to proceed with the work.
B)within one week of the GC commencing construction.
C)when the GC provides performance bond to the owner.
D)at the time of executing the owner- GC agreement.
E)none of the above.
A)when the owner gives the notice to GC to proceed with the work.
B)within one week of the GC commencing construction.
C)when the GC provides performance bond to the owner.
D)at the time of executing the owner- GC agreement.
E)none of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
29
A contract document set consists of
A)construction drawings, specifications, and addenda.
B)construction drawings.
C)construction drawings and specifications.
D)construction drawings, specifications, addenda, and contract modifications.
E)none of the above.
A)construction drawings, specifications, and addenda.
B)construction drawings.
C)construction drawings and specifications.
D)construction drawings, specifications, addenda, and contract modifications.
E)none of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
30
The primary purpose of the contract modification procedure in the agreement between the owner and the GC is to allow change orders.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
31
Of the various project delivery methods described in the text, the oldest method is
A)design- bid- build (DBB)method.
B)integrated project delivery (IPD)method.
C)design- build method (DB)method.
D)design- negotiate- build (DNB)method.
E)construction manager at risk (CMAR)method.
A)design- bid- build (DBB)method.
B)integrated project delivery (IPD)method.
C)design- build method (DB)method.
D)design- negotiate- build (DNB)method.
E)construction manager at risk (CMAR)method.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
32
Who is typically responsible for obtaining the certificate of occupancy from the local jurisdiction?
A)Owner
B)GC
C)Architect
A)Owner
B)GC
C)Architect
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
33
A GC would usually require performance bond from
A)the architect.
B)each major subcontractor.
C)the owner and the architect.
D)the owner, architect, and the consultants.
E)the owner.
A)the architect.
B)each major subcontractor.
C)the owner and the architect.
D)the owner, architect, and the consultants.
E)the owner.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
34
Where the owner is sufficiently familiar and confident of the financial and contractual capabilities of the GCs bidding for the project, the owner may not require the bid bond. This reduces the total cost of construction.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
35
The day- to- day supervision of construction is the responsibility of the
A)architect's consultants.
B)architect.
C)GC.
D)collectively of all the above.
A)architect's consultants.
B)architect.
C)GC.
D)collectively of all the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
36
Shop drawings are prepared during the design phase of the project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
37
All required surety bonds must be provided by the GCs who are bidding for the project, along with their bids, that is, at the time of bidding.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
38
The primary purpose of a mockup is to establish the quality of materials and workmanship involved in constructing important components of the building by which the completed components will be judged.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
39
The certificate of occupancy predates substantial completion inspection of the project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
40
The surety bonds used in a typical construction contract are
A)bid bond, performance bond, and payment bond.
B)bid bond, contract award bond, and completion bond.
C)bid bond, performance bond, and completion bond.
D)prescreening bond, award bond, and completion bond.
E)none of the above.
A)bid bond, performance bond, and payment bond.
B)bid bond, contract award bond, and completion bond.
C)bid bond, performance bond, and completion bond.
D)prescreening bond, award bond, and completion bond.
E)none of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
41
The project delivery method in which only one firm is contracted for both design and construction of the building is called the
A)CMAR method.
B)CMAA method.
C)IPD method.
D)design- bid- build method.
E)design- build method.
A)CMAR method.
B)CMAA method.
C)IPD method.
D)design- bid- build method.
E)design- build method.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
42
In the CMAR method of project delivery, the CM
A)advises the owner in the selection of the architect and the design team members.
B)advises the design team with respect to the constructability of design decisions and their cost implications.
C)works as the general contractor for the project.
D)only A and B
E)only B and C
A)advises the owner in the selection of the architect and the design team members.
B)advises the design team with respect to the constructability of design decisions and their cost implications.
C)works as the general contractor for the project.
D)only A and B
E)only B and C
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
43
In which of the three documents (construction documents, bidding documents, and contract documents)are contract modifications included?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
44
In most building projects, the consultants are hired by the architect to ensure complete coordination among the tasks of the architect and the consultants. However, in some projects, one or more consultants may be hired directly by the owner (sometimes before the selection of the architect). In such cases, the architect may still be held accountable for any error committed by the owner- appointed consultant(s). Explain why that is so.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
45
What is contained in the program of a building project?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
46
The MasterFormat has two separate divisions called "Specialties" and "Special Construction." What is the difference between them?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
47
Building design is generally a teamwork comprising several design professionals. Who is the prime design professional in most building projects?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
48
The project delivery method that should ensure the least amount of litigation among parties contributing to the project is the
A)IPD method.
B)design- build method.
C)CMAA method.
D)design- bid- build method.
E)CMAR method.
A)IPD method.
B)design- build method.
C)CMAA method.
D)design- bid- build method.
E)CMAR method.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
49
Is the preparation of the program for the project generally included as part of the architect's "basic" services, or is the architect compensated additionally if asked to assist in the preparation of the program?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
50
BIM is the most recently developed project delivery method.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
51
In reality, who bears the cost of surety bonds that the GC has to provide to the owner and why?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
52
In which project delivery phase is the decision generally made whether the project is to be designed to earn a certain level of sustainability rating?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
53
Which project delivery phase comes after the design phase?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
54
The design phase of a project is generally divided into three stages that are sequential. List these stages in sequential order in spelt- out format along with their acronyms.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
55
In a typical building project, the GC must provide (and pay for)all three surety bonds-bid bond, performance bond, and payment bond-to the owner. In certain situations, the owner may waive bid bond requirement. Mention one such situation.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
56
Which division of the MasterFormat contains information that the owner, the design team and the contracting team would not need after the construction contract has been awarded?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
57
The textbook shows the sketch of a one- room, hypothetical building that can be used to recollect the sequence of the first few divisions of the MasterFormat. Describe what this building consists of in terms of its structure and the materials used so that someone can sketch it from the description.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
58
Section 1.6 of the text states that building design and construction contracts in all project delivery methods are two- party contracts with the exception of one project delivery method. Which one is that?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
59
The predesign phase of the project comprises a number of tasks. Which one of these is of the utmost importance to the design phase?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
60
During a routine visit to the construction site, the project architect observes that the exterior wall cladding of the building is being installed before installing the windows (that are available on the site). The project architect's experience is that this sequence of construction will compromise the aesthetics and workmanship of the wall and discusses the issue with the general contractor (GC), who disagrees. What should be the project architect's follow- up step?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
61
How do GCs generally obtain information on upcoming construction projects that they could bid for?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
62
Of the four project delivery methods, which delivery method is most popular at the present time, as described in the text?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
63
What is the essential difference between a change order and a modification of contract? Explain.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
64
Explain the benefits of the GC's preconstruction services. In which project delivery methods are GC's preconstruction services available?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
65
Sketch in three dimensions the hypothetical building given in the text, which may be used to recollect the first 10 divisions of the MasterFormat. Then, list these 10 divisions.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
66
Provide the spelled- out versions of the acronyms "CMAA" and "CMAR." Then, explain the differences between the two project delivery methods. Use sketches to illustrate the contractual relationships between various parties involved in both methods.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
67
List the important items contained in a project manual. At what stage are addenda and contract modifications added to the document that will finally become the project manual?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
68
Explain what integrated project delivery is and how it differs from the other methods of project delivery.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
69
Using a sketch, explain the difference among construction documents, bidding documents, and contract documents.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
70
Of the four project delivery methods, which delivery method is least popular at the present time, as described in the text?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
71
Using a diagram, show the contractual relationships among the owner, architect, consultants, GC, and the subcontractors in a conventional (design- bid- build)building project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
72
Using a sketch, explain what fast- track scheduling is, and then, list its advantages and disadvantages.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
73
Name an additional benefit of the tower- mounted web- based camera(s)on a construction site, other than providing 24×7 imagery of the construction progress.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
74
Explain the purposes of the three surety bonds used in a typical building project, and the stages at which they are provided.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
75
Which design documentation technology allows the detection of clashes between building components during the design stage? Does this technology reduce the amount of time spent on sketch design (SD)and design development (DD)stages of the project?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
76
Explain the difference between change orders and contract modifications.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
77
What are shop drawings, why are they required, and for which items? Who prepares them, and do they require any approval? If so, by whom? Explain.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
78
Name at least three items of construction for which shop drawings are generally required.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
79
List the phases into which the work on a building project is divided, including the three subdivisions (stages)of the design phase. Then, briefly explain what is accomplished in each stage.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
80
Explain what is included in record documents and why they are required.