Deck 10: Leadership: Being an Effective Project Manager

Full screen (f)
exit full mode
Question
Stakeholders such as human resources,information systems,purchasing agents,and maintenance are typically classified as

A) Project managers.
B) Administrative support.
C) Functional managers.
D) Project sponsors.
E) Customers.
Use Space or
up arrow
down arrow
to flip the card.
Question
A well-defined project that encounters no significant surprises would require little

A) Management.
B) Leadership.
C) Monitoring.
D) Corrective action.
E) Controlling.
Question
In terms of commonly traded organizational currencies,sharing tasks that increase someone's skills and abilities and letting others have ownership and influence are examples of _______-related currencies.

A) Task
B) Position
C) Inspiration
D) Relationship
E) Personal
Question
Project success or failure often is reliant upon the contributions of all of the following groups of stakeholders EXCEPT

A) Customers.
B) Suppliers.
C) Contractors.
D) Competitors.
E) Top management.
Question
One difference between project management and project leadership is that project management includes

A) Recognizing the need to alter direction.
B) Aligning people to meet new directions.
C) Monitoring results against plans.
D) Motivating people to meet new objectives.
E) Deviating from the plan.
Question
When managing stakeholders,a project manager should

A) Develop a hands-on approach.
B) Focus on the project team and their needs.
C) Understand how different stakeholders can affect the project and manage that dependency.
D) Manage and limit time negotiating with stakeholders outside of the organization.
E) Refuse to be pulled by the demands of people who are not directly involved in the project.
Question
The second ring in the network of relationships for project managers includes all of the following EXCEPT

A) Other project managers.
B) Customers.
C) Functional managers.
D) Top management.
E) Project sponsors.
Question
Which of the following groups of stakeholders place constraints on project work such as requiring permits to be secured,that work is built to code,or that safety standards are met?

A) Project sponsors
B) Government agencies
C) Project managers
D) Customers
E) Top management
Question
The outer ring in the network of relationships for project managers includes all of the following EXCEPT

A) Other organizations.
B) Customers.
C) Contractors.
D) Government agencies.
E) Administrative support.
Question
A high-ranking manager who advocates the project and uses her or his influence to gain approval of the project is a project

A) Promoter.
B) Champion.
C) Godfather.
D) Sponsor.
E) Advocate.
Question
The following are necessary when mapping dependencies or building a social network EXCEPT

A) Identify those on whom the project depends for success.
B) Identify whose opposition would keep you from accomplishing the project.
C) Examine what sources of influence you have relative to those on whom you depend.
D) Focus on the relationships with project team members since they are doing the project work and you have most influence over them.
E) Diagnose another's point of view as well as the basis for their positions.
Question
Networks are mutually beneficial alliances that are generally governed by the law of

A) Supply-demand.
B) Brooks' law.
C) Reciprocity.
D) A squeaky wheel.
E) Risk-reward.
Question
The closest relationships in a project network of relationships are between the project manager and

A) Other project managers.
B) Project sponsors.
C) Top management.
D) Customers.
E) Project team members.
Question
In terms of commonly traded organizational currencies,being involved in a task that has a large significance and having a chance to do something important and do it well are examples of ______-related currencies.

A) Task
B) Position
C) Inspiration
D) Relationship
E) Personal
Question
In terms of commonly traded organizational currencies,providing friendship,giving emotional backing,and listening to others' concerns and issues are examples of _______-related currencies.

A) Task
B) Position
C) Inspiration
D) Relationship
E) Personal
Question
In terms of commonly traded organizational currencies,sharing personnel,undertaking unwanted tasks,and providing technical knowledge are examples of ______-related currencies.

A) Task
B) Position
C) Inspiration
D) Relationship
E) Personal
Question
In terms of commonly traded organizational currencies,giving a task that could result in a promotion,acknowledging someone's effort and accomplishments,and providing opportunities for linking with others are examples of ______-related currencies.

A) Task
B) Position
C) Inspiration
D) Relationship
E) Personal
Question
Managing a project and leading a project are two different things.Project leadership is about coping with

A) Formulating plans and objectives.
B) Monitoring results against plans.
C) Change.
D) Taking corrective action when necessary.
E) Designing structures and procedures.
Question
Which group of stakeholders defines the scope of the project and ultimately determines whether or not the project is successful?

A) Customers
B) Top management
C) Project sponsors
D) Project managers
E) Project team
Question
Which metaphor best captures the role of a project manager?

A) The conductor of an orchestra
B) The point guard on a basketball team
C) A programmer on a software development team
D) A scout on an exploration
E) A mathematics instructor
Question
_________-related currencies stem from the project manager's ability to enhance others' positions within the organization.
Question
__________-related currencies come directly from the project manager's ability to contribute to others' accomplishing their work.
Question
________ naturally compete with each other for resources and support from top management.
Question
Once you have established who the key players are that will determine success,then you initiate contact and begin to build a relationship with those players.Less effective managers

A) Spend the majority of their time outside their office.
B) Are able to stay in touch with what is really going on through face-to-face interactions.
C) Announce an open door policy and encourage others to see them when a problem or issue comes up.
D) Initiate contact to provide encouragement and to reinforce the objectives and vision of the project.
E) Talk with key stakeholders in attempt to keep abreast of developments and anticipate potential problems.
Question
Which of the following would be defined as the ability or skill to perceive,assess and manage the emotions of one's self and others?

A) Emotional stability
B) Coolness under pressure
C) Emotional intelligence
D) Empathy
E) Management sensitivity
Question
Which of the following would be defined as the ability to lead and manage yourself by establishing a sense for who you are,what you stand for and how you should behave?

A) Proactive
B) Emotional intelligence
C) Empathetic
D) Sense of purpose
E) Personal integrity
Question
To provide greater clarity to business ethics,many companies and professional groups

A) Encourage managers to rely on their own personal sense of right and wrong.
B) Post consequences to unethical behavior.
C) Publish a code of conduct.
D) Conduct annual training seminars on business ethics.
E) Establish a reward system for those who display ethical behavior.
Question
Management is about coping with complexity;________ is about coping with change.
Question
Which of the following is NOT one of the aspects of leading by example?

A) Priorities
B) Ethics
C) Urgency
D) Cooperation
E) Power
Question
The traits of successful project managers include all of the following EXCEPT

A) Pessimist.
B) Proactive.
C) Skillful politician.
D) Effective time management.
E) Personal integrity.
Question
Research consistently points out that project success is strongly affected by the degree to which a project has the support of top management.The following are ways a project manager can manage upward relationships EXCEPT

A) Never ignore the chains of command.
B) Prove loyalty.
C) Pick the optimum time to appeal to top management.
D) Consistently follow through on requests.
E) Accept profound differences in perspective and become skilled at the art of persuading superiors.
Question
Which of the following is used at Hewlett-Packard for building relationships with key players that will determine a project's success?

A) MBO
B) MBA
C) GIGO
D) MBWA
E) PMI
Question
The key to exercising influence is

A) To make few mistakes.
B) To build trust.
C) To build a network of top-level people.
D) To understand the political connections within the organization.
E) To make friends with everyone.
Question
________ define the scope of the project,and ultimate project success rests in their satisfaction.
Question
A popular metaphor for the role of a project manager is that of ________.
Question
When project managers recognize that if they want participants to exceed project expectations then they have to exceed others' expectations of a good project manager,they are leading by example through which of the following aspects?

A) Urgency
B) Problem solving
C) Priorities
D) Standards of performance
E) Ethics
Question
Networks among stakeholders are mutually beneficial alliances that are generally governed by the law of ________.
Question
_________-related currencies have more to do with strengthening the relationship with someone than directly accomplishing the project tasks.
Question
_________-related currencies derive from people's burning desire to make a difference and add meaning to their lives.
Question
________ champion the project and use their influence to gain approval of the project.
Question
One advantage of creating a dedicated project team is that it reduces dependencies,especially within the organization.
Question
Strong leadership,while usually desirable,is not always necessary to successfully complete a project.
Question
Once project managers have proven their _________ to upper management,senior management is much more receptive to their challenges and requests.
Question
When project managers take action before it is needed to prevent small concerns from escalating into major problems they are being _______.
Question
The ability or skill to perceive,assess and manage the emotions of one's self and others is called _________ intelligence.
Question
When project managers have a can-do attitude and when they are able to maintain a positive attitude during a dismal day and keep others' attention positive as well,they are demonstrating ___________.
Question
Successful project managers tend to adopt a hands-on approach to managing projects.
Question
Managers spend the majority of their time outside their offices in the ________ style of management.
Question
Mapping ____________ helps identify those on whom the project depends for success.
Question
Experienced project managers recognize the need to build __________ before they need them.
Question
One of the things that distinguish project management from regular management is the sheer breadth and complexity of the relationships that need to be managed.
Question
To provide greater clarity to business _________,many companies and professional groups publish a code of conduct.
Question
Customers define the scope of the project,and ultimately,project success rests in their satisfaction.
Question
The key to exercising influence is to build _______.
Question
In most cases,if someone can manage a project well,then they are also a great leader.
Question
________-related currencies enhance a colleague's sense of worth by sharing tasks that increase skills and abilities,delegating authority over work so that others experience ownership,and allowing individuals to feel comfortable stretching their abilities.
Question
A highly visible,interactive management style is when the project manager's behavior symbolizes how other people should work on the project.This is called __________ by example.
Question
Research consistently points out that project success is strongly affected by the degree to which a project has the support of ______.
Question
People and organizations that are actively involved in the project,or whose interests may be positively or negatively affected by the project,are known as __________.
Question
The level of leadership required to successfully complete a project may depend on the level of uncertainty involved.
Question
Identify and briefly describe the five commonly traded organizational currencies.
Question
Relationship-related currencies deal with the extent to which we can help others feel a sense of importance and personal worth by sharing tasks that increase their skills and abilities.
Question
Relationship-related currencies have more to do with strengthening the relationship with someone than directly accomplishing the project tasks.
Question
In regard to a network of stakeholders there are three "rings" or "tiers." Describe each ring and give an example of a group of stakeholders found in each.
Question
Effective time management for project managers includes initiating contact with key stakeholders only when there is a valid issue to deal with.
Question
The old-fashioned view of managing projects emphasized directing and controlling subordinates;the new perspective emphasizes managing project stakeholders and anticipating change as the most important jobs.
Question
"Managing a project and leading a project are essentially the same thing." Agree or disagree,and support your conclusion.
Question
The first step to building a social network is identifying those on whom the project depends for success.
Question
Through a project manager's behavior,he or she can influence how others act and respond to a variety of issues related to the project.
Question
Position-related currencies come directly from the project manager's ability to contribute to others' accomplishing their work.
Question
Many poor-performing project managers are guilty of management by wandering around.
Question
Inspiration-related currencies derive from people's burning desire to make a difference and add meaning to their lives.
Question
A successful project manager must build a cooperative,mutually beneficial network generally governed by the law of reciprocity.
Question
One important function of mapping dependencies and building a social network is to prevent project managers from being derailed because they were blindsided by someone whose position or power they had not anticipated.
Question
Optimism,integrity,and even being proactive are not developed easily if there is not already a predisposition to display them.
Question
"Strong leadership is not always necessary to successfully complete a project." Agree or disagree,and support your conclusion.
Question
As long as the culture of an organization acknowledges and condemns unethical behavior,ethical dilemmas are rare or trivial at the most.
Question
Managing upward relationships involves project managers become skilled at the art of persuading superiors.
Question
An individual's character alone is adequate to generate trust.
Question
It is impractical for a subordinate to "manage" a superior.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/88
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 10: Leadership: Being an Effective Project Manager
1
Stakeholders such as human resources,information systems,purchasing agents,and maintenance are typically classified as

A) Project managers.
B) Administrative support.
C) Functional managers.
D) Project sponsors.
E) Customers.
B
Explanation: Administration support,such as human resources and information systems,provide valuable support services.At the same time they impose constraints and requirements on the project such as the documentation of expenditures and the timely and accurate delivery of information.
2
A well-defined project that encounters no significant surprises would require little

A) Management.
B) Leadership.
C) Monitoring.
D) Corrective action.
E) Controlling.
B
Explanation: Well-defined projects that encounter no significant surprises require little leadership.
3
In terms of commonly traded organizational currencies,sharing tasks that increase someone's skills and abilities and letting others have ownership and influence are examples of _______-related currencies.

A) Task
B) Position
C) Inspiration
D) Relationship
E) Personal
E
Explanation: Personal-related currencies deal with individual needs and an overriding sense of self-esteem.
4
Project success or failure often is reliant upon the contributions of all of the following groups of stakeholders EXCEPT

A) Customers.
B) Suppliers.
C) Contractors.
D) Competitors.
E) Top management.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
5
One difference between project management and project leadership is that project management includes

A) Recognizing the need to alter direction.
B) Aligning people to meet new directions.
C) Monitoring results against plans.
D) Motivating people to meet new objectives.
E) Deviating from the plan.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
6
When managing stakeholders,a project manager should

A) Develop a hands-on approach.
B) Focus on the project team and their needs.
C) Understand how different stakeholders can affect the project and manage that dependency.
D) Manage and limit time negotiating with stakeholders outside of the organization.
E) Refuse to be pulled by the demands of people who are not directly involved in the project.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
7
The second ring in the network of relationships for project managers includes all of the following EXCEPT

A) Other project managers.
B) Customers.
C) Functional managers.
D) Top management.
E) Project sponsors.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
8
Which of the following groups of stakeholders place constraints on project work such as requiring permits to be secured,that work is built to code,or that safety standards are met?

A) Project sponsors
B) Government agencies
C) Project managers
D) Customers
E) Top management
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
9
The outer ring in the network of relationships for project managers includes all of the following EXCEPT

A) Other organizations.
B) Customers.
C) Contractors.
D) Government agencies.
E) Administrative support.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
10
A high-ranking manager who advocates the project and uses her or his influence to gain approval of the project is a project

A) Promoter.
B) Champion.
C) Godfather.
D) Sponsor.
E) Advocate.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
11
The following are necessary when mapping dependencies or building a social network EXCEPT

A) Identify those on whom the project depends for success.
B) Identify whose opposition would keep you from accomplishing the project.
C) Examine what sources of influence you have relative to those on whom you depend.
D) Focus on the relationships with project team members since they are doing the project work and you have most influence over them.
E) Diagnose another's point of view as well as the basis for their positions.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
12
Networks are mutually beneficial alliances that are generally governed by the law of

A) Supply-demand.
B) Brooks' law.
C) Reciprocity.
D) A squeaky wheel.
E) Risk-reward.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
13
The closest relationships in a project network of relationships are between the project manager and

A) Other project managers.
B) Project sponsors.
C) Top management.
D) Customers.
E) Project team members.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
14
In terms of commonly traded organizational currencies,being involved in a task that has a large significance and having a chance to do something important and do it well are examples of ______-related currencies.

A) Task
B) Position
C) Inspiration
D) Relationship
E) Personal
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
15
In terms of commonly traded organizational currencies,providing friendship,giving emotional backing,and listening to others' concerns and issues are examples of _______-related currencies.

A) Task
B) Position
C) Inspiration
D) Relationship
E) Personal
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
16
In terms of commonly traded organizational currencies,sharing personnel,undertaking unwanted tasks,and providing technical knowledge are examples of ______-related currencies.

A) Task
B) Position
C) Inspiration
D) Relationship
E) Personal
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
17
In terms of commonly traded organizational currencies,giving a task that could result in a promotion,acknowledging someone's effort and accomplishments,and providing opportunities for linking with others are examples of ______-related currencies.

A) Task
B) Position
C) Inspiration
D) Relationship
E) Personal
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
18
Managing a project and leading a project are two different things.Project leadership is about coping with

A) Formulating plans and objectives.
B) Monitoring results against plans.
C) Change.
D) Taking corrective action when necessary.
E) Designing structures and procedures.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
19
Which group of stakeholders defines the scope of the project and ultimately determines whether or not the project is successful?

A) Customers
B) Top management
C) Project sponsors
D) Project managers
E) Project team
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
20
Which metaphor best captures the role of a project manager?

A) The conductor of an orchestra
B) The point guard on a basketball team
C) A programmer on a software development team
D) A scout on an exploration
E) A mathematics instructor
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
21
_________-related currencies stem from the project manager's ability to enhance others' positions within the organization.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
22
__________-related currencies come directly from the project manager's ability to contribute to others' accomplishing their work.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
23
________ naturally compete with each other for resources and support from top management.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
24
Once you have established who the key players are that will determine success,then you initiate contact and begin to build a relationship with those players.Less effective managers

A) Spend the majority of their time outside their office.
B) Are able to stay in touch with what is really going on through face-to-face interactions.
C) Announce an open door policy and encourage others to see them when a problem or issue comes up.
D) Initiate contact to provide encouragement and to reinforce the objectives and vision of the project.
E) Talk with key stakeholders in attempt to keep abreast of developments and anticipate potential problems.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following would be defined as the ability or skill to perceive,assess and manage the emotions of one's self and others?

A) Emotional stability
B) Coolness under pressure
C) Emotional intelligence
D) Empathy
E) Management sensitivity
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following would be defined as the ability to lead and manage yourself by establishing a sense for who you are,what you stand for and how you should behave?

A) Proactive
B) Emotional intelligence
C) Empathetic
D) Sense of purpose
E) Personal integrity
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
27
To provide greater clarity to business ethics,many companies and professional groups

A) Encourage managers to rely on their own personal sense of right and wrong.
B) Post consequences to unethical behavior.
C) Publish a code of conduct.
D) Conduct annual training seminars on business ethics.
E) Establish a reward system for those who display ethical behavior.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
28
Management is about coping with complexity;________ is about coping with change.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the following is NOT one of the aspects of leading by example?

A) Priorities
B) Ethics
C) Urgency
D) Cooperation
E) Power
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
30
The traits of successful project managers include all of the following EXCEPT

A) Pessimist.
B) Proactive.
C) Skillful politician.
D) Effective time management.
E) Personal integrity.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
31
Research consistently points out that project success is strongly affected by the degree to which a project has the support of top management.The following are ways a project manager can manage upward relationships EXCEPT

A) Never ignore the chains of command.
B) Prove loyalty.
C) Pick the optimum time to appeal to top management.
D) Consistently follow through on requests.
E) Accept profound differences in perspective and become skilled at the art of persuading superiors.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
32
Which of the following is used at Hewlett-Packard for building relationships with key players that will determine a project's success?

A) MBO
B) MBA
C) GIGO
D) MBWA
E) PMI
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
33
The key to exercising influence is

A) To make few mistakes.
B) To build trust.
C) To build a network of top-level people.
D) To understand the political connections within the organization.
E) To make friends with everyone.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
34
________ define the scope of the project,and ultimate project success rests in their satisfaction.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
35
A popular metaphor for the role of a project manager is that of ________.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
36
When project managers recognize that if they want participants to exceed project expectations then they have to exceed others' expectations of a good project manager,they are leading by example through which of the following aspects?

A) Urgency
B) Problem solving
C) Priorities
D) Standards of performance
E) Ethics
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
37
Networks among stakeholders are mutually beneficial alliances that are generally governed by the law of ________.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
38
_________-related currencies have more to do with strengthening the relationship with someone than directly accomplishing the project tasks.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
39
_________-related currencies derive from people's burning desire to make a difference and add meaning to their lives.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
40
________ champion the project and use their influence to gain approval of the project.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
41
One advantage of creating a dedicated project team is that it reduces dependencies,especially within the organization.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
42
Strong leadership,while usually desirable,is not always necessary to successfully complete a project.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
43
Once project managers have proven their _________ to upper management,senior management is much more receptive to their challenges and requests.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
44
When project managers take action before it is needed to prevent small concerns from escalating into major problems they are being _______.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
45
The ability or skill to perceive,assess and manage the emotions of one's self and others is called _________ intelligence.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
46
When project managers have a can-do attitude and when they are able to maintain a positive attitude during a dismal day and keep others' attention positive as well,they are demonstrating ___________.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
47
Successful project managers tend to adopt a hands-on approach to managing projects.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
48
Managers spend the majority of their time outside their offices in the ________ style of management.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
49
Mapping ____________ helps identify those on whom the project depends for success.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
50
Experienced project managers recognize the need to build __________ before they need them.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
51
One of the things that distinguish project management from regular management is the sheer breadth and complexity of the relationships that need to be managed.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
52
To provide greater clarity to business _________,many companies and professional groups publish a code of conduct.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
53
Customers define the scope of the project,and ultimately,project success rests in their satisfaction.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
54
The key to exercising influence is to build _______.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
55
In most cases,if someone can manage a project well,then they are also a great leader.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
56
________-related currencies enhance a colleague's sense of worth by sharing tasks that increase skills and abilities,delegating authority over work so that others experience ownership,and allowing individuals to feel comfortable stretching their abilities.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
57
A highly visible,interactive management style is when the project manager's behavior symbolizes how other people should work on the project.This is called __________ by example.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
58
Research consistently points out that project success is strongly affected by the degree to which a project has the support of ______.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
59
People and organizations that are actively involved in the project,or whose interests may be positively or negatively affected by the project,are known as __________.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
60
The level of leadership required to successfully complete a project may depend on the level of uncertainty involved.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
61
Identify and briefly describe the five commonly traded organizational currencies.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
62
Relationship-related currencies deal with the extent to which we can help others feel a sense of importance and personal worth by sharing tasks that increase their skills and abilities.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
63
Relationship-related currencies have more to do with strengthening the relationship with someone than directly accomplishing the project tasks.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
64
In regard to a network of stakeholders there are three "rings" or "tiers." Describe each ring and give an example of a group of stakeholders found in each.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
65
Effective time management for project managers includes initiating contact with key stakeholders only when there is a valid issue to deal with.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
66
The old-fashioned view of managing projects emphasized directing and controlling subordinates;the new perspective emphasizes managing project stakeholders and anticipating change as the most important jobs.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
67
"Managing a project and leading a project are essentially the same thing." Agree or disagree,and support your conclusion.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
68
The first step to building a social network is identifying those on whom the project depends for success.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
69
Through a project manager's behavior,he or she can influence how others act and respond to a variety of issues related to the project.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
70
Position-related currencies come directly from the project manager's ability to contribute to others' accomplishing their work.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
71
Many poor-performing project managers are guilty of management by wandering around.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
72
Inspiration-related currencies derive from people's burning desire to make a difference and add meaning to their lives.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
73
A successful project manager must build a cooperative,mutually beneficial network generally governed by the law of reciprocity.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
74
One important function of mapping dependencies and building a social network is to prevent project managers from being derailed because they were blindsided by someone whose position or power they had not anticipated.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
75
Optimism,integrity,and even being proactive are not developed easily if there is not already a predisposition to display them.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
76
"Strong leadership is not always necessary to successfully complete a project." Agree or disagree,and support your conclusion.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
77
As long as the culture of an organization acknowledges and condemns unethical behavior,ethical dilemmas are rare or trivial at the most.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
78
Managing upward relationships involves project managers become skilled at the art of persuading superiors.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
79
An individual's character alone is adequate to generate trust.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
80
It is impractical for a subordinate to "manage" a superior.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 88 flashcards in this deck.