Question
Project management is important to understand when people are a part of a project team because they

A) Work with others to create a schedule and budget.
B) Need to understand project priorities so they can make independent decisions.
C) Need to be able to monitor and report project progress.
D) Need to understand the project charter or scope statement that defines the objectives and parameters of the project.
E) All of these are reasons it is important for project team members to understand project management.
Use Space or
up arrow
down arrow
to flip the card.
Question
Which of the following activities is the best example of a project?

A) Processing insurance claims
B) Producing automobiles
C) Writing a policy manual
D) Monitoring product quality
E) Overseeing customer requests
Question
Which of the following activities is NOT considered a project?

A) Developing a new software program
B) Designing a space station
C) Preparing the site for the Olympic Games
D) Production of automobile tires
E) Developing a new advertising program
Question
In the _____________ stage of the project life cycle,project objectives are established,teams are formed,and major responsibilities are assigned.

A) Identifying
B) Defining
C) Planning
D) Executing
E) Closing
Question
Which dimension of project management centers on creating a temporary social system within a larger organizational environment that combines the talents of a divergent set of professionals working to complete the project?

A) Communication
B) Sociocultural
C) Social
D) Technical
E) Scheduling
Question
Two dimensions within the project management process are

A) Technical and sociocultural.
B) Cost and time.
C) Planned and unexpected.
D) Established and new.
E) Unique and reoccurring.
Question
In the _____________ stage of the project life cycle,a major portion of the physical project work performed.

A) Identifying
B) Defining
C) Planning
D) Executing
E) Closing
Question
Which of the following is NOT one of the driving forces behind the increasing demand for project management?

A) Compression of the product life cycle
B) Knowledge explosion
C) Increasing need for multiproject management
D) Declining need for product customization
E) More sustainable business practices
Question
In the _____________ stage of the project life cycle you are more likely to find status reports,changes,and the creation of forecasts.

A) Identifying
B) Defining
C) Planning
D) Executing
E) Closing
Question
Which of these is NOT part of the "technical dimension" of project management?

A) WBS
B) Budgets
C) Problem solving
D) Schedules
E) Status reports
Question
Which of the following is NOT considered to be a characteristic of a project?

A) An established objective
B) A clear beginning and end
C) Specific time,cost and performance requirements
D) For internal use only
E) Something never been done before
Question
Which of the following is NOT typical of a project manager?

A) Managing a temporary activity
B) Overseeing existing operations
C) Managing a nonrepetitive activity
D) Responsible for time,cost and performance trade-offs
E) Work with a group of outsiders,including vendors and suppliers
Question
Project management is ideally suited for a business environment requiring all of the following EXCEPT

A) Accountability.
B) Flexibility.
C) Innovation.
D) Speed.
E) Repeatability.
Question
In the _____________ stage of the project life cycle the project's schedule and budget will be determined.

A) Identifying
B) Defining
C) Planning
D) Executing
E) Closing
Question
Which of the following is NOT one of the stages of a project life cycle?

A) Identifying
B) Defining
C) Planning
D) Executing
E) Closing
Question
Project governance does NOT include

A) Setting standards for project selection.
B) Overseeing project management activities.
C) Centralization of project processes and practices.
D) Options for continuous improvement.
E) Allowing project managers to plan the project the way they see fit.
Question
Which of the following statements is true?

A) Project management is far from a standard way of doing business
B) Project management is increasingly contributing to achieving organizational strategies
C) Project management is being used at a consistent percentage of a firm's efforts
D) Project management is a specialty that few organizations have access to
E) All of these statements are false
Question
A professional organization for project management specialists is the

A) PMI.
B) AMA.
C) MIS.
D) IPM.
E) PMBOK.
Question
In the _____________ stage of the project life cycle project the product is delivered to the customer and resources are reassigned.

A) Identifying
B) Defining
C) Planning
D) Executing
E) Closing
Question
Projects should align with the organization's overall strategy in order to

A) Complete the project safely.
B) Reduce waste of scarce resources.
C) Ensure customer satisfaction.
D) Secure funding.
E) None of these are reasons why projects should align with the organization's overall strategy.
Question
A series of coordinated,related,multiple projects that continue over an extended time period and are intended to achieve a goal is known as a

A) Strategy.
B) Program.
C) Campaign.
D) Crusade.
E) Venture.
Question
A temporary endeavor undertaken to create a unique product,service,or result is a(n)_________.
Question
Corporate downsizing has increased the trend toward

A) Reducing the number of projects a company initiates.
B) Outsourcing significant segments of project work.
C) Using dedicated project teams.
D) Shorter project lead times.
E) Longer project lead times.
Question
A major part of the project work,both physical and mental,takes place in the ___________ stage of the project life cycle.
Question
The project's schedule and budget will be determined in the ___________ stage of the project life cycle.
Question
Governance of all project management processes and procedures helps provide senior management with all of the following EXCEPT

A) A method to ensure projects that are important to senior management are being implemented
B) An assessment of the risk their portfolio of projects represents
C) An overview of all project management activities
D) A metric to measure the improvement of managing projects relative to others in the industry
E) A big picture of how organizational resources are being used
Question
In today's high-tech industries the product life cycle is averaging _________ to 3 years.
Question
The final stage in the project life cycle is the __________ stage.
Question
As the number of small projects increase within an organization's portfolio,what is a challenge an organization faces?

A) Sharing resources
B) Measuring efficiency
C) Managing risk
D) Prioritizing projects
E) All of these are challenges
Question
The initial stage in the project life cycle is the __________ stage.
Question
Which of the following is typically the responsibility of a project manager?

A) Meeting budget requirements
B) Meeting schedule requirements
C) Meeting performance specifications
D) Coordinating the actions of the team members
E) All of these are typical responsibilities
Question
Increased competition has placed a premium on customer satisfaction and the development of __________ products and services.
Question
Which of the following is a good example of a program?

A) Planting a garden
B) Developing a new residential area that includes six custom homes
C) Developing a new marketing plan
D) Taking notes each class meeting to prepare for the final
E) Planning a wedding
Question
The advent of many small projects has created the need for an organization that can support __________ management.
Question
Which of the following is NOT true about project management?

A) It is not limited to the private sector
B) Many opportunities are available for individuals interested in this career path
C) It improves one's ability to plan,implement and manage activities to accomplish specific organizational objectives
D) It focuses primarily on technical processes
E) It is a set of tools
Question
Which of these is NOT part of the "sociocultural dimension" of project management?

A) Negotiation
B) Resource allocation
C) Managing customer expectations
D) Leadership
E) Dealing with politics
Question
Which of the following represents the correct order of stages within the project life cycle?

A) Planning,Defining,Executing,Closing
B) Closing,Planning,Defining,Executing
C) Defining,Planning,Executing,Closing
D) Executing,Defining,Planning,Closing
E) Planning,Defining,Closing,Executing
Question
Which of the following is NOT a reason why project management has become a standard way of doing business?

A) Increased need for skilled management of stakeholders outside of organization
B) Projects need to be done faster
C) Organizations are doing more project work in-house instead of outsourcing
D) Organizations are executing more and more projects
E) Increased product complexity and innovation
Question
Project management is not limited to the __________ sector.
Question
A professional organization for project managers that has grown from 93,000 in 2002 to more than 520,000 currently is the ___________.
Question
The professional certification for project managers is a Project Management Professional (PMP).
Question
Applying a set of knowledge,skills,tools,and techniques to a collection of projects in order to move the organization toward its strategic goals is known as project ____________.
Question
The _____________ typically passes sequentially through four stages.
Question
Project managers are expected to ensure that appropriate trade-offs are made between the time,cost,and __________ requirements of the project.
Question
WBS,schedules,and budgets are examples of the _________ dimension of the project management process.
Question
Leadership,teamwork,and negotiation are examples of the _________ dimension of the project management process.
Question
Because of its flexibility,project management is equally useful in ongoing,routine work as well as unique,one-time projects.
Question
Training the customer,reassigning staff,and releasing resources occurs in the ________ stage of the project life cycle.
Question
One of the characteristics that separate project management from other endeavors of the organization is that there are specific time,cost,and performance requirements.
Question
The establishment of project goals,specifications,and responsibilities usually occurs in the ________ stage of the project life cycle.
Question
An increase in the complexity of projects,because projects typically include the latest advances,can be the result of a growth in new __________.
Question
A professional organization for project management specialists is the ___________.
Question
In some organizations,selection and management of projects often fail to support the overall _________ of the organization.
Question
Because of the profitability motive,project management is nearly always limited to the private sector.
Question
One of the defining characteristics of project management is that the projects are not confined to a single department but involve several departments and professionals.
Question
Not only is project management critical to many careers,the skill set is transferable across most businesses and professions.
Question
Most people who excel at managing projects never have the title of project manager.
Question
A(n)_________ is a series of coordinated,related multiple projects that continue over an extended time intended to achieve a goal.
Question
One of the defining characteristics of a project is that it has a singular purpose,i.e. ,an established ________.
Question
Because projects have a defined beginning and end,the ________ is frequently used to manage the transitions of a project from start to completion.
Question
Compare and contrast the Product Life Cycle and the Project Life Cycle.
Question
Strategic plans should be written by one group of managers,projects should be selected by another group,and projects should be implemented by another group.
Question
Because of the requirement for in-depth expertise,project management is generally restricted to specialists.
Question
Identify and briefly describe the four stages of the Project Life Cycle.
Question
Due to corporate downsizing,significant segments of project work have been outsourced to other organizations.
Question
A major portion of the project work,both physical and mental,takes place during the production stage of the project life cycle.
Question
At first glance,project managers perform the same functions as other managers.That is,they plan,schedule,motivate and control.
Question
Today,projects are the modus operandi or the method used for implementing organizational strategy.
Question
The sociocultural dimension of project management includes managing relationships,motivating team members and negotiating project terms.
Question
"Project managers perform the same functions as other managers." Agree or disagree,and support your decision.
Question
Successful project managers focus primarily on technical dimensions of project management,which include planning,scheduling,and controlling projects.
Question
Project management appears to be ideally suited for a business environment requiring accountability,flexibility,innovation and repeatability.
Question
Since a construction company builds many buildings,the buildings built after the first do not fit the definition of a project.
Question
Smaller projects in larger organizations tend not to need project management skills.
Question
The first stage in the project life cycle is the concept stage.
Question
One of the most significant driving forces behind the demand for project management is the ever increasing lengthening of the product life cycle.
Question
Project governance means applying a set of knowledge,skills,tools,and techniques to a collection of projects in order to move the organization toward its strategic goals.
Question
A program is a process designed to accomplish a common goal over time.
Question
Small business development is a major driver of project management.
Question
Identify the five major characteristics of a project.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/88
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 1: Modern Project Management
1
Project management is important to understand when people are a part of a project team because they

A) Work with others to create a schedule and budget.
B) Need to understand project priorities so they can make independent decisions.
C) Need to be able to monitor and report project progress.
D) Need to understand the project charter or scope statement that defines the objectives and parameters of the project.
E) All of these are reasons it is important for project team members to understand project management.
E
Explanation: Project members are expected to use project management tools and concepts such as working as a team to create a budget or schedule and be able to monitor project progress.They also need to be able to understand project priorities and parameters.
2
Which of the following activities is the best example of a project?

A) Processing insurance claims
B) Producing automobiles
C) Writing a policy manual
D) Monitoring product quality
E) Overseeing customer requests
C
Explanation: A project is not routine,repetitive work! Ordinary daily work typically requires doing the same or similar work over and over,while a project is done only once;a new product or service exists when the project is completed.
3
Which of the following activities is NOT considered a project?

A) Developing a new software program
B) Designing a space station
C) Preparing the site for the Olympic Games
D) Production of automobile tires
E) Developing a new advertising program
D
Explanation: A project is not routine,repetitive work! Ordinary daily work typically requires doing the same or similar work over and over,while a project is done only once;a new product or service exists when the project is completed.
4
In the _____________ stage of the project life cycle,project objectives are established,teams are formed,and major responsibilities are assigned.

A) Identifying
B) Defining
C) Planning
D) Executing
E) Closing
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
5
Which dimension of project management centers on creating a temporary social system within a larger organizational environment that combines the talents of a divergent set of professionals working to complete the project?

A) Communication
B) Sociocultural
C) Social
D) Technical
E) Scheduling
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
6
Two dimensions within the project management process are

A) Technical and sociocultural.
B) Cost and time.
C) Planned and unexpected.
D) Established and new.
E) Unique and reoccurring.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
7
In the _____________ stage of the project life cycle,a major portion of the physical project work performed.

A) Identifying
B) Defining
C) Planning
D) Executing
E) Closing
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
8
Which of the following is NOT one of the driving forces behind the increasing demand for project management?

A) Compression of the product life cycle
B) Knowledge explosion
C) Increasing need for multiproject management
D) Declining need for product customization
E) More sustainable business practices
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
9
In the _____________ stage of the project life cycle you are more likely to find status reports,changes,and the creation of forecasts.

A) Identifying
B) Defining
C) Planning
D) Executing
E) Closing
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
10
Which of these is NOT part of the "technical dimension" of project management?

A) WBS
B) Budgets
C) Problem solving
D) Schedules
E) Status reports
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following is NOT considered to be a characteristic of a project?

A) An established objective
B) A clear beginning and end
C) Specific time,cost and performance requirements
D) For internal use only
E) Something never been done before
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following is NOT typical of a project manager?

A) Managing a temporary activity
B) Overseeing existing operations
C) Managing a nonrepetitive activity
D) Responsible for time,cost and performance trade-offs
E) Work with a group of outsiders,including vendors and suppliers
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
13
Project management is ideally suited for a business environment requiring all of the following EXCEPT

A) Accountability.
B) Flexibility.
C) Innovation.
D) Speed.
E) Repeatability.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
14
In the _____________ stage of the project life cycle the project's schedule and budget will be determined.

A) Identifying
B) Defining
C) Planning
D) Executing
E) Closing
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
15
Which of the following is NOT one of the stages of a project life cycle?

A) Identifying
B) Defining
C) Planning
D) Executing
E) Closing
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
16
Project governance does NOT include

A) Setting standards for project selection.
B) Overseeing project management activities.
C) Centralization of project processes and practices.
D) Options for continuous improvement.
E) Allowing project managers to plan the project the way they see fit.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
17
Which of the following statements is true?

A) Project management is far from a standard way of doing business
B) Project management is increasingly contributing to achieving organizational strategies
C) Project management is being used at a consistent percentage of a firm's efforts
D) Project management is a specialty that few organizations have access to
E) All of these statements are false
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
18
A professional organization for project management specialists is the

A) PMI.
B) AMA.
C) MIS.
D) IPM.
E) PMBOK.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
19
In the _____________ stage of the project life cycle project the product is delivered to the customer and resources are reassigned.

A) Identifying
B) Defining
C) Planning
D) Executing
E) Closing
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
20
Projects should align with the organization's overall strategy in order to

A) Complete the project safely.
B) Reduce waste of scarce resources.
C) Ensure customer satisfaction.
D) Secure funding.
E) None of these are reasons why projects should align with the organization's overall strategy.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
21
A series of coordinated,related,multiple projects that continue over an extended time period and are intended to achieve a goal is known as a

A) Strategy.
B) Program.
C) Campaign.
D) Crusade.
E) Venture.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
22
A temporary endeavor undertaken to create a unique product,service,or result is a(n)_________.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
23
Corporate downsizing has increased the trend toward

A) Reducing the number of projects a company initiates.
B) Outsourcing significant segments of project work.
C) Using dedicated project teams.
D) Shorter project lead times.
E) Longer project lead times.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
24
A major part of the project work,both physical and mental,takes place in the ___________ stage of the project life cycle.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
25
The project's schedule and budget will be determined in the ___________ stage of the project life cycle.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
26
Governance of all project management processes and procedures helps provide senior management with all of the following EXCEPT

A) A method to ensure projects that are important to senior management are being implemented
B) An assessment of the risk their portfolio of projects represents
C) An overview of all project management activities
D) A metric to measure the improvement of managing projects relative to others in the industry
E) A big picture of how organizational resources are being used
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
27
In today's high-tech industries the product life cycle is averaging _________ to 3 years.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
28
The final stage in the project life cycle is the __________ stage.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
29
As the number of small projects increase within an organization's portfolio,what is a challenge an organization faces?

A) Sharing resources
B) Measuring efficiency
C) Managing risk
D) Prioritizing projects
E) All of these are challenges
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
30
The initial stage in the project life cycle is the __________ stage.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following is typically the responsibility of a project manager?

A) Meeting budget requirements
B) Meeting schedule requirements
C) Meeting performance specifications
D) Coordinating the actions of the team members
E) All of these are typical responsibilities
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
32
Increased competition has placed a premium on customer satisfaction and the development of __________ products and services.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
33
Which of the following is a good example of a program?

A) Planting a garden
B) Developing a new residential area that includes six custom homes
C) Developing a new marketing plan
D) Taking notes each class meeting to prepare for the final
E) Planning a wedding
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
34
The advent of many small projects has created the need for an organization that can support __________ management.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
35
Which of the following is NOT true about project management?

A) It is not limited to the private sector
B) Many opportunities are available for individuals interested in this career path
C) It improves one's ability to plan,implement and manage activities to accomplish specific organizational objectives
D) It focuses primarily on technical processes
E) It is a set of tools
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
36
Which of these is NOT part of the "sociocultural dimension" of project management?

A) Negotiation
B) Resource allocation
C) Managing customer expectations
D) Leadership
E) Dealing with politics
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
37
Which of the following represents the correct order of stages within the project life cycle?

A) Planning,Defining,Executing,Closing
B) Closing,Planning,Defining,Executing
C) Defining,Planning,Executing,Closing
D) Executing,Defining,Planning,Closing
E) Planning,Defining,Closing,Executing
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
38
Which of the following is NOT a reason why project management has become a standard way of doing business?

A) Increased need for skilled management of stakeholders outside of organization
B) Projects need to be done faster
C) Organizations are doing more project work in-house instead of outsourcing
D) Organizations are executing more and more projects
E) Increased product complexity and innovation
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
39
Project management is not limited to the __________ sector.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
40
A professional organization for project managers that has grown from 93,000 in 2002 to more than 520,000 currently is the ___________.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
41
The professional certification for project managers is a Project Management Professional (PMP).
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
42
Applying a set of knowledge,skills,tools,and techniques to a collection of projects in order to move the organization toward its strategic goals is known as project ____________.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
43
The _____________ typically passes sequentially through four stages.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
44
Project managers are expected to ensure that appropriate trade-offs are made between the time,cost,and __________ requirements of the project.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
45
WBS,schedules,and budgets are examples of the _________ dimension of the project management process.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
46
Leadership,teamwork,and negotiation are examples of the _________ dimension of the project management process.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
47
Because of its flexibility,project management is equally useful in ongoing,routine work as well as unique,one-time projects.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
48
Training the customer,reassigning staff,and releasing resources occurs in the ________ stage of the project life cycle.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
49
One of the characteristics that separate project management from other endeavors of the organization is that there are specific time,cost,and performance requirements.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
50
The establishment of project goals,specifications,and responsibilities usually occurs in the ________ stage of the project life cycle.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
51
An increase in the complexity of projects,because projects typically include the latest advances,can be the result of a growth in new __________.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
52
A professional organization for project management specialists is the ___________.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
53
In some organizations,selection and management of projects often fail to support the overall _________ of the organization.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
54
Because of the profitability motive,project management is nearly always limited to the private sector.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
55
One of the defining characteristics of project management is that the projects are not confined to a single department but involve several departments and professionals.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
56
Not only is project management critical to many careers,the skill set is transferable across most businesses and professions.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
57
Most people who excel at managing projects never have the title of project manager.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
58
A(n)_________ is a series of coordinated,related multiple projects that continue over an extended time intended to achieve a goal.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
59
One of the defining characteristics of a project is that it has a singular purpose,i.e. ,an established ________.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
60
Because projects have a defined beginning and end,the ________ is frequently used to manage the transitions of a project from start to completion.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
61
Compare and contrast the Product Life Cycle and the Project Life Cycle.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
62
Strategic plans should be written by one group of managers,projects should be selected by another group,and projects should be implemented by another group.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
63
Because of the requirement for in-depth expertise,project management is generally restricted to specialists.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
64
Identify and briefly describe the four stages of the Project Life Cycle.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
65
Due to corporate downsizing,significant segments of project work have been outsourced to other organizations.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
66
A major portion of the project work,both physical and mental,takes place during the production stage of the project life cycle.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
67
At first glance,project managers perform the same functions as other managers.That is,they plan,schedule,motivate and control.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
68
Today,projects are the modus operandi or the method used for implementing organizational strategy.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
69
The sociocultural dimension of project management includes managing relationships,motivating team members and negotiating project terms.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
70
"Project managers perform the same functions as other managers." Agree or disagree,and support your decision.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
71
Successful project managers focus primarily on technical dimensions of project management,which include planning,scheduling,and controlling projects.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
72
Project management appears to be ideally suited for a business environment requiring accountability,flexibility,innovation and repeatability.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
73
Since a construction company builds many buildings,the buildings built after the first do not fit the definition of a project.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
74
Smaller projects in larger organizations tend not to need project management skills.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
75
The first stage in the project life cycle is the concept stage.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
76
One of the most significant driving forces behind the demand for project management is the ever increasing lengthening of the product life cycle.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
77
Project governance means applying a set of knowledge,skills,tools,and techniques to a collection of projects in order to move the organization toward its strategic goals.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
78
A program is a process designed to accomplish a common goal over time.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
79
Small business development is a major driver of project management.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
80
Identify the five major characteristics of a project.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 88 flashcards in this deck.