Deck 12: MRP and ERP

Full screen (f)
exit full mode
Question
The master schedule needs to be for a period long enough to cover the stacked or cumulative lead time necessary to produce the end items.
Use Space or
up arrow
down arrow
to flip the card.
Question
A net-change MRP system is one that is updated periodically but not less frequently than once a week.
Question
The inventory records contain information on the status of each item by time period.
Question
The master production schedule states which end items are to be produced, in addition to when and how many.
Question
A bill of materials contains a listing of all the assemblies, parts, and materials needed to produce one unit of an end item.
Question
The gross requirements value for any given component is equal to the net requirements of that component's immediate parent multiplied by the quantity per parent.
Question
The bill of materials contains information on lead times and current inventory position on every component required to produce the end item.
Question
MRP works best if the inventory items have dependent demand.
Question
The term pegging refers to identifying the parent items that have generated a given set of material requirements for a part or subassembly.
Question
Initially, a master production schedule-the output from MRP-may not represent a feasible schedule.
Question
MRP II did not replace or improve the basic MRP.
Question
Net requirements equal gross requirements minus safety stock.
Question
Independent demand tends to be more "lumpy" than dependent demand, meaning that we need large quantities followed by periods of no demand.
Question
MRP, considering inventory position, bills of material, open purchase orders, and lead times guarantees a feasible production plan if the inputs to MRP are accurate.
Question
The bill of materials indicates how much material will be needed to produce the quantities on a given master production schedule.
Question
The gross requirements at one level of an MRP plan determine the gross requirements at the next lower level continuing on down to the lowest levels shown on the bill of material.
Question
An assembly-time chart indicates gross and net requirements taking into account the current available inventory.
Question
Lumpy demand for components results primarily from the periodic scheduling of batch production.
Question
MRP is used within most MRP II and ERP systems.
Question
Low-level coding represents items less than $18 per unit.
Question
In MRP, EOQ models tend to be less useful for materials at the lowest levels than for upper-level assemblies of the bill of materials since higher-level assemblies have larger dollar investments.
Question
Which of the following is a direct input into capacity requirements planning?
(I) the master production schedule
(II) routing information
(III) current shop loads
(IV) planned-order releases

A) II, III, and IV only
B) I, II, and IV only
C) I, III, and IV only
D) I and II only
E) I, II, III, and IV
Question
ERP began in manufacturing organizations but has spread into service organizations.
Question
In many organizations, information flows much more freely within functions than it does across functions. __________ represents an expanded effort to overcome this tendency.

A) MRP
B) ERP
C) CRP
D) MRPII
E) DRP
Question
Project management approaches can help in a conversion to an ERP system.
Question
MRP II is simply an improved version of MRP that processes more quickly and can plan for a larger number of end items.
Question
MRP can apply to services, especially when it is focused on:
(I) work-in-process inventory.
(II) finished goods inventory.
(III) service components.
(IV) materials that are part of the service process.

A) II and IV only
B) I and III only
C) I, II, and IV only
D) I, III, and IV only
E) III and IV only
Question
Which of the following is absolutely necessary for successful implementation and operation of MRP?
(I) accurate inventory records
(II) accurate demand forecasts
(III) accurate holding and backordering costs
(IV) accurate bills of materials

A) I, II, and IV only
B) I, III, and IV only
C) I, II, and III only
D) I and II only
E) I, II, III, and IV
Question
One of the primary output reports of MRP concerns changes to planned orders.
Question
Backflushing takes place:

A) when inventory records need updating.
B) after some bills of material have been found to be inaccurate.
C) after production has been completed.
D) when customer orders are being reconciled.
E) when previous periods' planned releases are converted to scheduled receipts.
Question
Lot-for-lot ordering in MRP eliminates the holding costs for parts that are carried over to other periods.
Question
Load reports show capacity requirements for departments or work centers which may be more or less than the capacity available in that work center.
Question
A regenerative MRP system is one that is updated continuously, every time there is a schedule change.
Question
Lot-for-lot ordering in MRP provides coverage for some predetermined number of periods (such as two or three) that extend beyond the orders already received for those periods.
Question
Capacity requirements planning helps managers reconcile __________ with __________.

A) what is needed; what has been done
B) what is needed; what is possible
C) what has been done; who will be doing it
D) what needs to be done; where it will be done
E) what has been done; how much what needs to be done will cost
Question
MRP output reports are divided into two main groups, daily and weekly.
Question
Scheduled receipts differ from planned receipts in that scheduled receipts:

A) have longer lead times.
B) involve orders that have not yet been placed.
C) have not been pegged with actual customer orders.
D) involve orders that have already been placed.
E) involve exceptions to order quantity policies.
Question
One reason that accurate bills of material are important is that errors at one level become magnified at lower levels because of the multiplication process used by MRP.
Question
Capacity requirements planning is an important feature in MRP+.
Question
Safety time is sometimes used in MRP rather than safety stock quantities.
Question
The identification of parent items is called:

A) paternity.
B) pegging.
C) requirement I.D.
D) relationship tracking.
E) master scheduling.
Question
An MRP system whose records are updated continuously is referred to as a(n):

A) regenerative system.
B) batch-type system.
C) Plossl-Wright system.
D) net-change system.
E) gross-change system.
Question
The output of MRP is:

A) gross requirements.
B) net requirements.
C) a schedule of requirements for all parts and end items.
D) inventory reorder points.
E) economic order quantities and reorder points.
Question
Under lot-for-lot, order sizes for component parts are essentially determined directly from which one of the following?

A) gross requirements
B) net requirements
C) economic order quantity
D) gross requirements and net requirements
E) net requirements and amount on hand
Question
A visual depiction of the subassemblies and components that are needed to produce and/or assemble a product is called a(n):

A) assembly time chart.
B) product structure tree.
C) MRP II.
D) pegging.
E) Gantt chart.
Question
In MRP, under lot-for-lot ordering, planned-order receipts are:

A) identical to scheduled receipts.
B) identical to planned-order releases.
C) open orders (that is, ordered before the first time bucket, but not delivered yet).
D) gross requirements.
E) available-to-promise inventory.
Question
In an MRP master schedule, the planning horizon is often separated into a series of time periods called:

A) pegging.
B) lead times.
C) stacked lead times.
D) time buckets.
E) firm, fixed, and frozen.
Question
Which is true of a net-change system?

A) It is a batch-type system which is updated periodically.
B) It is usually run at the beginning of each month.
C) The basic production plan is modified to reflect changes as they occur.
D) It is used to authorize the execution of planned orders.
E) It indicates the amount and timing of future changes.
Question
An MRP system that is updated periodically to account for all changes which have occurred within a given time interval is called a(n) ________ system.

A) pegging
B) planned order release
C) net-change
D) regenerative
E) exception report
Question
Which one of the following is not an input in an MRP system?

A) planned-order schedules
B) bill of materials
C) master production schedule
D) inventory records
E) All are inputs.
Question
Which of the following most closely describes dependent demand?

A) demand generated by suppliers
B) estimates of demand using regression analysis of independent variables
C) derived demand
D) demands placed on suppliers by their customers
E) net material requirements
Question
The MRP input storing information on the status of each item by time period (e.g., scheduled receipts, lead time, lot size) is the:

A) master production schedule.
B) bill of materials.
C) inventory records.
D) assembly time chart.
E) net requirements chart.
Question
In MRP, scheduled receipts are:

A) identical to planned-order receipts.
B) identical to planned-order releases.
C) open orders (that is, ordered before the first time bucket, but not delivered yet).
D) net requirements.
E) available-to-promise inventory.
Question
Which one of the following most closely describes net material requirements?

A) gross requirements - amount on hand - scheduled receipts
B) gross requirements - planned receipts
C) gross requirements - order releases + amount on hand
D) gross requirements - planned order releases
E) gross requirements - amount on hand + planned order releases
Question
The development and application of MRP depended upon two developments: (1) the recognition of the difference between independent and dependent demand, and (2):

A) computers.
B) development of the EOQ model.
C) inventory control systems.
D) blanket purchase orders.
E) the Internet.
Question
The MRP input stating which end items are to be produced, when they are needed, and what quantities are needed, is the:

A) master schedule.
B) bill of materials.
C) inventory records.
D) assembly time chart.
E) net requirements chart.
Question
In MRP, the gross requirements of a given component part are calculated from:

A) net requirements + amount on-hand.
B) gross requirements of the immediate parent.
C) planned orders of the end item.
D) net requirements of end item.
E) planned orders of the immediate parent.
Question
The MRP input listing the assemblies, subassemblies, parts, and raw materials needed to produce one unit of finished product is the:

A) master production schedule.
B) bill of materials.
C) inventory records.
D) assembly time chart.
E) net requirements chart.
Question
ERP implementation probably will not require:

A) cross-functional teams.
B) just a few weeks to install.
C) intensive training.
D) high funding for both initial cost and maintenance.
E) frequent upgrades after installation.
Question
A computer-based information system designed to handle ordering and scheduling of dependent-demand inventories is:

A) computer-aided manufacturing.
B) computer-integrated manufacturing.
C) economic order quantity.
D) material requirements planning.
E) economic run size.
Question
Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot), and quantities on hand:  Deluxe Easter Basket BOM  Lead Time  On-Hand  Deluxe Easter Basket 1 week 10 Dark Chocolate Truffles (2 per) 2 weeks 30 Carved Chocolate Eggs (4 per) 1 week 50\begin{array} { c l l } \text { Deluxe Easter Basket BOM } & \text { Lead Time } & \text { On-Hand } \\\hline \text { Deluxe Easter Basket } & 1 \text { week } & 10 \\\text { Dark Chocolate Truffles (2 per) } & 2 \text { weeks } & 30 \\\text { Carved Chocolate Eggs (4 per) } & 1 \text { week } & 50\end{array} Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs; additionally one bottle of Alka-Seltzer is included for those who overindulge. How many dark chocolate eggs should be ordered?

A) 310
B) 450
C) 500
D) 550
E) 600
Question
Comparing known and expected capacity requirements with projected capacity availability is the job of:

A) planned releases.
B) load reports.
C) lot sizing.
D) work loading.
E) time fencing.
Question
Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot), and quantities on hand:  Deluxe Easter Basket BOM  Lead Time  On-Hand  Deluxe Easter Basket 1 week 10 Dark Chocolate Truffles (2 per) 2 weeks 30 Carved Chocolate Eggs (4 per) 1 week 50\begin{array} { c l l } \text { Deluxe Easter Basket BOM } & \text { Lead Time } & \text { On-Hand } \\\hline \text { Deluxe Easter Basket } & 1 \text { week } & 10 \\\text { Dark Chocolate Truffles (2 per) } & 2 \text { weeks } & 30 \\\text { Carved Chocolate Eggs (4 per) } & 1 \text { week } & 50\end{array} Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs; additionally one bottle of Alka-Seltzer is included for those who overindulge. When should an order for carved chocolate eggs be released?

A) at the start of week 2
B) at the start of week 3
C) at the start of week 4
D) at the start of week 5
E) at the start of week 6
Question
Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot), and quantities on hand:  Deluxe Easter Basket BOM  Lead Time  On-Hand  Deluxe Easter Basket 1 week 10 Dark Chocolate Truffles (2 per) 2 weeks 30 Carved Chocolate Eggs (4 per) 1 week 50\begin{array} { c l l } \text { Deluxe Easter Basket BOM } & \text { Lead Time } & \text { On-Hand } \\\hline \text { Deluxe Easter Basket } & 1 \text { week } & 10 \\\text { Dark Chocolate Truffles (2 per) } & 2 \text { weeks } & 30 \\\text { Carved Chocolate Eggs (4 per) } & 1 \text { week } & 50\end{array} Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs; additionally one bottle of Alka-Seltzer is included for those who overindulge. If the firm is using a fixed-period lot size of two periods, what is the order size for the first order?

A) 120
B) 200
C) 280
D) 160
E) 150
Question
_______ is choosing how many to order or make.

A) Quantity determination
B) Package sizing
C) Lot sizing
D) Grouping
E) Aggregation
Question
Which one of the following most closely describes the MRP approach that is used for components or subassemblies to compensate for variations in lead time?

A) pegging
B) safety stock
C) increased order sizes
D) safety time
E) low-level coding
Question
Refer to this product tree: <strong>Refer to this product tree:   If 40 Ps are needed, and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies, how many Cs are needed?</strong> A) 340 B) 350 C) 380 D) 400 E) 590 <div style=padding-top: 35px> If 40 Ps are needed, and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies, how many Cs are needed?

A) 340
B) 350
C) 380
D) 400
E) 590
Question
Which of the following is not usually necessary in order to have an effective MRP system?

A) a computer and software
B) an accurate bill of materials
C) lot-for-lot ordering
D) an up-to-date master schedule
E) integrity of file data
Question
The multiplication process used by MRP to determine lower-level requirements is called:

A) time-phasing.
B) pegging.
C) netting.
D) projecting.
E) exploding.
Question
Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot), and quantities on hand:  Deluxe Easter Basket BOM  Lead Time  On-Hand  Deluxe Easter Basket 1 week 10 Dark Chocolate Truffles (2 per) 2 weeks 30 Carved Chocolate Eggs (4 per) 1 week 50\begin{array} { c l l } \text { Deluxe Easter Basket BOM } & \text { Lead Time } & \text { On-Hand } \\\hline \text { Deluxe Easter Basket } & 1 \text { week } & 10 \\\text { Dark Chocolate Truffles (2 per) } & 2 \text { weeks } & 30 \\\text { Carved Chocolate Eggs (4 per) } & 1 \text { week } & 50\end{array} Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs; additionally one bottle of Alka-Seltzer is included for those who overindulge. What is the net requirement for dark chocolate truffles to fill this order?

A) 100
B) 140
C) 150
D) 180
E) 200
Question
Which statement concerning MRP II is false?

A) It is basically a computerized system.
B) It can handle complex planning and scheduling quickly.
C) It involves other functional areas in the production planning process.
D) It involves capacity planning.
E) It produces a production plan which includes all resources required.
Question
An effort to expand the scope of production resource planning by involving other functional areas in the planning process has been:

A) material requirements planning.
B) capacity requirements planning.
C) manufacturing resources planning.
D) just-in-time planning.
E) multifunctional relationships planning.
Question
Refer to this product tree: <strong>Refer to this product tree:   If 17 Ps are needed, and no on-hand inventory exists for any items, how many Cs will be needed?</strong> A) 8 B) 16 C) 136 D) 204 E) 272 <div style=padding-top: 35px> If 17 Ps are needed, and no on-hand inventory exists for any items, how many Cs will be needed?

A) 8
B) 16
C) 136
D) 204
E) 272
Question
Which of the following represents an attempt to balance the benefits of stability against the benefits of responding to new information?

A) safety stock
B) safety time
C) bills of material
D) time fences
E) fixed-period lot sizing
Question
Which of these items would be most likely to have dependent demand?

A) Xbox batteries
B) toy trains
C) flowers
D) chocolate chip cookies
E) wrist watches
Question
When MRP II systems include feedback, they are known as:

A) MRP III.
B) enterprise resource planning.
C) circular MRP.
D) feasible MRP.
E) closed loop MRP.
Question
The _________ of ERP makes it valuable as a strategic planning tool.

A) Internet base
B) rapid batch capability
C) employee focus
D) real-time aspect
E) database structure
Question
Which of these products would be most likely to have dependent demand?

A) refrigerators
B) automobile engines
C) televisions
D) brownies
E) automobiles
Question
Which of the following lot sizing methods does not attempt to balance ordering (or setup) and holding costs?

A) economic order quantity
B) economic run size
C) lot-for-lot
D) part-period
E) all of these
Question
Refer to this product tree: <strong>Refer to this product tree:   If 17 Ps are needed, and on-hand inventory consists of 10 As, 15 Bs, 20 Cs, 12 Ms, and 5 Ns, how many Cs are needed?</strong> A) 48 B) 144 C) 192 D) 212 E) 272 <div style=padding-top: 35px> If 17 Ps are needed, and on-hand inventory consists of 10 As, 15 Bs, 20 Cs, 12 Ms, and 5 Ns, how many Cs are needed?

A) 48
B) 144
C) 192
D) 212
E) 272
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/89
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 12: MRP and ERP
1
The master schedule needs to be for a period long enough to cover the stacked or cumulative lead time necessary to produce the end items.
True
2
A net-change MRP system is one that is updated periodically but not less frequently than once a week.
False
3
The inventory records contain information on the status of each item by time period.
True
4
The master production schedule states which end items are to be produced, in addition to when and how many.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
5
A bill of materials contains a listing of all the assemblies, parts, and materials needed to produce one unit of an end item.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
6
The gross requirements value for any given component is equal to the net requirements of that component's immediate parent multiplied by the quantity per parent.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
7
The bill of materials contains information on lead times and current inventory position on every component required to produce the end item.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
8
MRP works best if the inventory items have dependent demand.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
9
The term pegging refers to identifying the parent items that have generated a given set of material requirements for a part or subassembly.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
10
Initially, a master production schedule-the output from MRP-may not represent a feasible schedule.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
11
MRP II did not replace or improve the basic MRP.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
12
Net requirements equal gross requirements minus safety stock.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
13
Independent demand tends to be more "lumpy" than dependent demand, meaning that we need large quantities followed by periods of no demand.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
14
MRP, considering inventory position, bills of material, open purchase orders, and lead times guarantees a feasible production plan if the inputs to MRP are accurate.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
15
The bill of materials indicates how much material will be needed to produce the quantities on a given master production schedule.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
16
The gross requirements at one level of an MRP plan determine the gross requirements at the next lower level continuing on down to the lowest levels shown on the bill of material.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
17
An assembly-time chart indicates gross and net requirements taking into account the current available inventory.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
18
Lumpy demand for components results primarily from the periodic scheduling of batch production.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
19
MRP is used within most MRP II and ERP systems.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
20
Low-level coding represents items less than $18 per unit.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
21
In MRP, EOQ models tend to be less useful for materials at the lowest levels than for upper-level assemblies of the bill of materials since higher-level assemblies have larger dollar investments.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following is a direct input into capacity requirements planning?
(I) the master production schedule
(II) routing information
(III) current shop loads
(IV) planned-order releases

A) II, III, and IV only
B) I, II, and IV only
C) I, III, and IV only
D) I and II only
E) I, II, III, and IV
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
23
ERP began in manufacturing organizations but has spread into service organizations.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
24
In many organizations, information flows much more freely within functions than it does across functions. __________ represents an expanded effort to overcome this tendency.

A) MRP
B) ERP
C) CRP
D) MRPII
E) DRP
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
25
Project management approaches can help in a conversion to an ERP system.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
26
MRP II is simply an improved version of MRP that processes more quickly and can plan for a larger number of end items.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
27
MRP can apply to services, especially when it is focused on:
(I) work-in-process inventory.
(II) finished goods inventory.
(III) service components.
(IV) materials that are part of the service process.

A) II and IV only
B) I and III only
C) I, II, and IV only
D) I, III, and IV only
E) III and IV only
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
28
Which of the following is absolutely necessary for successful implementation and operation of MRP?
(I) accurate inventory records
(II) accurate demand forecasts
(III) accurate holding and backordering costs
(IV) accurate bills of materials

A) I, II, and IV only
B) I, III, and IV only
C) I, II, and III only
D) I and II only
E) I, II, III, and IV
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
29
One of the primary output reports of MRP concerns changes to planned orders.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
30
Backflushing takes place:

A) when inventory records need updating.
B) after some bills of material have been found to be inaccurate.
C) after production has been completed.
D) when customer orders are being reconciled.
E) when previous periods' planned releases are converted to scheduled receipts.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
31
Lot-for-lot ordering in MRP eliminates the holding costs for parts that are carried over to other periods.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
32
Load reports show capacity requirements for departments or work centers which may be more or less than the capacity available in that work center.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
33
A regenerative MRP system is one that is updated continuously, every time there is a schedule change.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
34
Lot-for-lot ordering in MRP provides coverage for some predetermined number of periods (such as two or three) that extend beyond the orders already received for those periods.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
35
Capacity requirements planning helps managers reconcile __________ with __________.

A) what is needed; what has been done
B) what is needed; what is possible
C) what has been done; who will be doing it
D) what needs to be done; where it will be done
E) what has been done; how much what needs to be done will cost
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
36
MRP output reports are divided into two main groups, daily and weekly.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
37
Scheduled receipts differ from planned receipts in that scheduled receipts:

A) have longer lead times.
B) involve orders that have not yet been placed.
C) have not been pegged with actual customer orders.
D) involve orders that have already been placed.
E) involve exceptions to order quantity policies.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
38
One reason that accurate bills of material are important is that errors at one level become magnified at lower levels because of the multiplication process used by MRP.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
39
Capacity requirements planning is an important feature in MRP+.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
40
Safety time is sometimes used in MRP rather than safety stock quantities.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
41
The identification of parent items is called:

A) paternity.
B) pegging.
C) requirement I.D.
D) relationship tracking.
E) master scheduling.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
42
An MRP system whose records are updated continuously is referred to as a(n):

A) regenerative system.
B) batch-type system.
C) Plossl-Wright system.
D) net-change system.
E) gross-change system.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
43
The output of MRP is:

A) gross requirements.
B) net requirements.
C) a schedule of requirements for all parts and end items.
D) inventory reorder points.
E) economic order quantities and reorder points.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
44
Under lot-for-lot, order sizes for component parts are essentially determined directly from which one of the following?

A) gross requirements
B) net requirements
C) economic order quantity
D) gross requirements and net requirements
E) net requirements and amount on hand
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
45
A visual depiction of the subassemblies and components that are needed to produce and/or assemble a product is called a(n):

A) assembly time chart.
B) product structure tree.
C) MRP II.
D) pegging.
E) Gantt chart.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
46
In MRP, under lot-for-lot ordering, planned-order receipts are:

A) identical to scheduled receipts.
B) identical to planned-order releases.
C) open orders (that is, ordered before the first time bucket, but not delivered yet).
D) gross requirements.
E) available-to-promise inventory.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
47
In an MRP master schedule, the planning horizon is often separated into a series of time periods called:

A) pegging.
B) lead times.
C) stacked lead times.
D) time buckets.
E) firm, fixed, and frozen.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
48
Which is true of a net-change system?

A) It is a batch-type system which is updated periodically.
B) It is usually run at the beginning of each month.
C) The basic production plan is modified to reflect changes as they occur.
D) It is used to authorize the execution of planned orders.
E) It indicates the amount and timing of future changes.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
49
An MRP system that is updated periodically to account for all changes which have occurred within a given time interval is called a(n) ________ system.

A) pegging
B) planned order release
C) net-change
D) regenerative
E) exception report
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
50
Which one of the following is not an input in an MRP system?

A) planned-order schedules
B) bill of materials
C) master production schedule
D) inventory records
E) All are inputs.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
51
Which of the following most closely describes dependent demand?

A) demand generated by suppliers
B) estimates of demand using regression analysis of independent variables
C) derived demand
D) demands placed on suppliers by their customers
E) net material requirements
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
52
The MRP input storing information on the status of each item by time period (e.g., scheduled receipts, lead time, lot size) is the:

A) master production schedule.
B) bill of materials.
C) inventory records.
D) assembly time chart.
E) net requirements chart.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
53
In MRP, scheduled receipts are:

A) identical to planned-order receipts.
B) identical to planned-order releases.
C) open orders (that is, ordered before the first time bucket, but not delivered yet).
D) net requirements.
E) available-to-promise inventory.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
54
Which one of the following most closely describes net material requirements?

A) gross requirements - amount on hand - scheduled receipts
B) gross requirements - planned receipts
C) gross requirements - order releases + amount on hand
D) gross requirements - planned order releases
E) gross requirements - amount on hand + planned order releases
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
55
The development and application of MRP depended upon two developments: (1) the recognition of the difference between independent and dependent demand, and (2):

A) computers.
B) development of the EOQ model.
C) inventory control systems.
D) blanket purchase orders.
E) the Internet.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
56
The MRP input stating which end items are to be produced, when they are needed, and what quantities are needed, is the:

A) master schedule.
B) bill of materials.
C) inventory records.
D) assembly time chart.
E) net requirements chart.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
57
In MRP, the gross requirements of a given component part are calculated from:

A) net requirements + amount on-hand.
B) gross requirements of the immediate parent.
C) planned orders of the end item.
D) net requirements of end item.
E) planned orders of the immediate parent.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
58
The MRP input listing the assemblies, subassemblies, parts, and raw materials needed to produce one unit of finished product is the:

A) master production schedule.
B) bill of materials.
C) inventory records.
D) assembly time chart.
E) net requirements chart.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
59
ERP implementation probably will not require:

A) cross-functional teams.
B) just a few weeks to install.
C) intensive training.
D) high funding for both initial cost and maintenance.
E) frequent upgrades after installation.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
60
A computer-based information system designed to handle ordering and scheduling of dependent-demand inventories is:

A) computer-aided manufacturing.
B) computer-integrated manufacturing.
C) economic order quantity.
D) material requirements planning.
E) economic run size.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
61
Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot), and quantities on hand:  Deluxe Easter Basket BOM  Lead Time  On-Hand  Deluxe Easter Basket 1 week 10 Dark Chocolate Truffles (2 per) 2 weeks 30 Carved Chocolate Eggs (4 per) 1 week 50\begin{array} { c l l } \text { Deluxe Easter Basket BOM } & \text { Lead Time } & \text { On-Hand } \\\hline \text { Deluxe Easter Basket } & 1 \text { week } & 10 \\\text { Dark Chocolate Truffles (2 per) } & 2 \text { weeks } & 30 \\\text { Carved Chocolate Eggs (4 per) } & 1 \text { week } & 50\end{array} Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs; additionally one bottle of Alka-Seltzer is included for those who overindulge. How many dark chocolate eggs should be ordered?

A) 310
B) 450
C) 500
D) 550
E) 600
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
62
Comparing known and expected capacity requirements with projected capacity availability is the job of:

A) planned releases.
B) load reports.
C) lot sizing.
D) work loading.
E) time fencing.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
63
Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot), and quantities on hand:  Deluxe Easter Basket BOM  Lead Time  On-Hand  Deluxe Easter Basket 1 week 10 Dark Chocolate Truffles (2 per) 2 weeks 30 Carved Chocolate Eggs (4 per) 1 week 50\begin{array} { c l l } \text { Deluxe Easter Basket BOM } & \text { Lead Time } & \text { On-Hand } \\\hline \text { Deluxe Easter Basket } & 1 \text { week } & 10 \\\text { Dark Chocolate Truffles (2 per) } & 2 \text { weeks } & 30 \\\text { Carved Chocolate Eggs (4 per) } & 1 \text { week } & 50\end{array} Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs; additionally one bottle of Alka-Seltzer is included for those who overindulge. When should an order for carved chocolate eggs be released?

A) at the start of week 2
B) at the start of week 3
C) at the start of week 4
D) at the start of week 5
E) at the start of week 6
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
64
Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot), and quantities on hand:  Deluxe Easter Basket BOM  Lead Time  On-Hand  Deluxe Easter Basket 1 week 10 Dark Chocolate Truffles (2 per) 2 weeks 30 Carved Chocolate Eggs (4 per) 1 week 50\begin{array} { c l l } \text { Deluxe Easter Basket BOM } & \text { Lead Time } & \text { On-Hand } \\\hline \text { Deluxe Easter Basket } & 1 \text { week } & 10 \\\text { Dark Chocolate Truffles (2 per) } & 2 \text { weeks } & 30 \\\text { Carved Chocolate Eggs (4 per) } & 1 \text { week } & 50\end{array} Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs; additionally one bottle of Alka-Seltzer is included for those who overindulge. If the firm is using a fixed-period lot size of two periods, what is the order size for the first order?

A) 120
B) 200
C) 280
D) 160
E) 150
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
65
_______ is choosing how many to order or make.

A) Quantity determination
B) Package sizing
C) Lot sizing
D) Grouping
E) Aggregation
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
66
Which one of the following most closely describes the MRP approach that is used for components or subassemblies to compensate for variations in lead time?

A) pegging
B) safety stock
C) increased order sizes
D) safety time
E) low-level coding
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
67
Refer to this product tree: <strong>Refer to this product tree:   If 40 Ps are needed, and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies, how many Cs are needed?</strong> A) 340 B) 350 C) 380 D) 400 E) 590 If 40 Ps are needed, and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies, how many Cs are needed?

A) 340
B) 350
C) 380
D) 400
E) 590
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
68
Which of the following is not usually necessary in order to have an effective MRP system?

A) a computer and software
B) an accurate bill of materials
C) lot-for-lot ordering
D) an up-to-date master schedule
E) integrity of file data
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
69
The multiplication process used by MRP to determine lower-level requirements is called:

A) time-phasing.
B) pegging.
C) netting.
D) projecting.
E) exploding.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
70
Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot), and quantities on hand:  Deluxe Easter Basket BOM  Lead Time  On-Hand  Deluxe Easter Basket 1 week 10 Dark Chocolate Truffles (2 per) 2 weeks 30 Carved Chocolate Eggs (4 per) 1 week 50\begin{array} { c l l } \text { Deluxe Easter Basket BOM } & \text { Lead Time } & \text { On-Hand } \\\hline \text { Deluxe Easter Basket } & 1 \text { week } & 10 \\\text { Dark Chocolate Truffles (2 per) } & 2 \text { weeks } & 30 \\\text { Carved Chocolate Eggs (4 per) } & 1 \text { week } & 50\end{array} Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs; additionally one bottle of Alka-Seltzer is included for those who overindulge. What is the net requirement for dark chocolate truffles to fill this order?

A) 100
B) 140
C) 150
D) 180
E) 200
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
71
Which statement concerning MRP II is false?

A) It is basically a computerized system.
B) It can handle complex planning and scheduling quickly.
C) It involves other functional areas in the production planning process.
D) It involves capacity planning.
E) It produces a production plan which includes all resources required.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
72
An effort to expand the scope of production resource planning by involving other functional areas in the planning process has been:

A) material requirements planning.
B) capacity requirements planning.
C) manufacturing resources planning.
D) just-in-time planning.
E) multifunctional relationships planning.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
73
Refer to this product tree: <strong>Refer to this product tree:   If 17 Ps are needed, and no on-hand inventory exists for any items, how many Cs will be needed?</strong> A) 8 B) 16 C) 136 D) 204 E) 272 If 17 Ps are needed, and no on-hand inventory exists for any items, how many Cs will be needed?

A) 8
B) 16
C) 136
D) 204
E) 272
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
74
Which of the following represents an attempt to balance the benefits of stability against the benefits of responding to new information?

A) safety stock
B) safety time
C) bills of material
D) time fences
E) fixed-period lot sizing
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
75
Which of these items would be most likely to have dependent demand?

A) Xbox batteries
B) toy trains
C) flowers
D) chocolate chip cookies
E) wrist watches
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
76
When MRP II systems include feedback, they are known as:

A) MRP III.
B) enterprise resource planning.
C) circular MRP.
D) feasible MRP.
E) closed loop MRP.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
77
The _________ of ERP makes it valuable as a strategic planning tool.

A) Internet base
B) rapid batch capability
C) employee focus
D) real-time aspect
E) database structure
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
78
Which of these products would be most likely to have dependent demand?

A) refrigerators
B) automobile engines
C) televisions
D) brownies
E) automobiles
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
79
Which of the following lot sizing methods does not attempt to balance ordering (or setup) and holding costs?

A) economic order quantity
B) economic run size
C) lot-for-lot
D) part-period
E) all of these
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
80
Refer to this product tree: <strong>Refer to this product tree:   If 17 Ps are needed, and on-hand inventory consists of 10 As, 15 Bs, 20 Cs, 12 Ms, and 5 Ns, how many Cs are needed?</strong> A) 48 B) 144 C) 192 D) 212 E) 272 If 17 Ps are needed, and on-hand inventory consists of 10 As, 15 Bs, 20 Cs, 12 Ms, and 5 Ns, how many Cs are needed?

A) 48
B) 144
C) 192
D) 212
E) 272
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 89 flashcards in this deck.