The product-process matrix shows the relationship between process structures and product volume and product standardization characteristics.
Use Space or
up arrow
down arrow
to flip the card.
Question
The choice of which process structure to select is generally a function of the volume requirements for the product.
Question
Break-Even Analysis can be used to help decide whether to perform a task with a special purpose machine or with a general purpose machine.
Question
Items produced in a project layout are typically managed using project management techniques.
Question
The difference between an assembly line process flow and a continuous process flow is that the assembly line the flow is discrete rather than continuous.
Question
Assembly lines are a special case of a project layout.
Question
A continuous process flow indicates production of discrete parts moving from workstation to workstation at a controlled rate.
Question
Once a choice of position on the product-process matrix is selected change is impossible.
Question
Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.
Question
Workcenter layouts allocate the same or similar machines into cells to work on products that have dissimilar shapes and dissimilar processing requirements.
Question
A general purpose machine is less capable than a special purpose machine in certain tasks but can perform a broader variety of tasks.
Question
Break-even analysis can only be used in production equipment decision making and deals solely with fixed costs,not variable costs.
Question
The most common production management tools used in planning and designing the process flow are assembly drawings,assembly charts,route sheets and flow process charts.
Question
One trade-off illustrated by the product-process matrix is between flexibility and cost.
Question
Break-Even Analysis can be used to help decide whether to perform a task with a special purpose machine or with a general purpose machine.
Question
One methodology used to evaluate equipment investment decisions where the investment entails a large initial investment,fixed costs and variable costs is break-even analysis.
Question
A project layout is characterized by a relatively low number of production units.
Question
The product-process matrix shows the relationship between process structures and product volume.
Question
One methodology used to evaluate equipment investment decisions where the investment entails a large initial investment,fixed costs and variable costs is break-even analysis.
Question
The choice of which process structure to select is generally a function of the volume requirements for the product.
Question
You are hired as a consultant to decide if your client should purchase a new,highly specialized,piece of equipment.The product to be produced by this equipment is forecast to have a total world wide demand of 15,000 units over the entire product life.The initial investment to acquire and install the equipment is $256,000.The variable cost to produce each unit will be $15 and the selling price for the finished product will be $30.Which of the following best describes the situation the firm is facing?

A)The company will recover its' initial investment
B)The company's total margin will be less than its' investment
C)It's a good investment
D)The break-even is lower than the 15,000 units that are expected to sell
E)All of the above
Question
Which of the following is a basic type of process structure?

A)Process flow diagram
B)Product matrix
C)Process matrix
D)Workcenter
E)Manual assembly
Question
Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps by which the product is made?

A)Project
B)Workcenter
C)Manufacturing cell
D)Assembly line
E)Continuous process
Question
Which of the following is not a basic type of process structure?

A)Product-process matrix
B)Workcenter
C)Manufacturing cell
D)Assembly line
E)Continuous process
Question
Assume a fixed cost for a process of $100,000.The variable cost to produce each unit of product is $10 and the selling price for the finished product is $50.Ignoring inventory,how many units must the firm sell to break-even?
Question
Assume a fixed cost for a process of $15,000.The variable cost to produce each unit of product is $10 and the selling price for the finished product is $25.Which of the following is the number of units that has to be produced and sold to break-even?

A)500 units
B)667 units
C)790 units
D)900 units
E)1,000 units
Question
A graphic used in process flow design depicting an exploded view of a product and its component parts is which of the following?

A)Route sheet
B)Gantt chart
C)Assembly drawing
D)Simo chart
E)Packing list
Question
Give an example of a project layout?
Question
Which of the following is not considered a major process flow structure?

A)Project
B)Workcenter
C)Assembly line
D)Fabrication
E)Continuous Flow
Question
Assume a fixed cost for a process of $120,000.The variable cost to produce each unit of product is $35 and the selling price for the finished product is $50.Which of the following is the number of units that has to be produced and sold to break-even?

A)5,000 units
B)6,000 units
C)8,000 units
D)11,000 units
E)12,000 units
Question
A process flowchart uses the information presented in the assembly drawing and defines how parts go together and their order of assembly.
Question
The formats by which a facility is arranged are defined by the general pattern of work flow.
Question
A manufacturer has identified the options for acquiring a machined part.It can make the part on a numerically controlled lathe for $150 per unit (including materials. )It can make the part on a standard lathe for $250 per unit (also including materials. )It can make the part on a machining center for $50 per unit (also including materials. )The manufacturer can acquire a standard lathe for $10,000.It could acquire a numerically controlled lathe for $100,000.A machining center would cost $350,000.It has also found that it can purchase the part for $350 per unit?
Question
The major difference between the project and the assembly line categories of process flow structures is which of the following?

A)The size of the product
B)Discrete parts moving from workstation to workstation
C)Highly specialized equipment
D)Being a Virtual Factory
E)The product's volume and standardization
Question
What is sometimes humorously referred to as a "gozinto chart"?

A)Assembly drawing
B)Assembly chart
C)Process flowchart
D)Operation and route sheet
E)Organization charts
Question
Assume that you are offered a new piece of equipment for $10,000.The equipment will produce 10,000 units per year with a margin of $6.00 per unit.Demand for the product being produced has been 2,000 units per year.Your current equipment is fully depreciated and can produce the 2,000 units per year at but at a margin of only $4.00 per unit.Under what conditions should you purchase the new equipment?
Question
Which of the following basic types of process structures is one which similar equipment or functions are grouped together?

A)Project
B)Workcenter
C)Manufacturing cell
D)Assembly line
E)Continuous process
Question
The most common production management tools used in planning and designing the process flow are assembly drawings,assembly charts,route sheets and product prototypes.
Question
In analysis using a process flowchart of a manufacturing operation,the emphasis is usually on identification of activities that can be minimized or eliminated.
Question
In a factory,machine A has a ten minute set-up time per batch and a two minute per unit run time.Machine B performs the identical function but has a set-up time of thirty minutes and a one minute run time per unit.The factory makes products in batches ranging from one unit to one hundred units.Assuming capacity is not a limitation on either machine,on which batches should machine B be used?

A)All batches should be run on machine B
B)Batches of more than 20 units should be run on machine B
C)Batches of fewer than 80 units should be run on machine B
D)Batches with up to 50 units should be run on machine B
E)No batches should be run on machine B
Question
Describe the implications of the product-process matrix for process design in a competitive situation?
Question
Differentiate between a workcenter and a manufacturing cell?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/42
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 7: Manufacturing Processes
1
The product-process matrix shows the relationship between process structures and product volume and product standardization characteristics.
True
2
The choice of which process structure to select is generally a function of the volume requirements for the product.
True
3
Break-Even Analysis can be used to help decide whether to perform a task with a special purpose machine or with a general purpose machine.
True
4
Items produced in a project layout are typically managed using project management techniques.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
5
The difference between an assembly line process flow and a continuous process flow is that the assembly line the flow is discrete rather than continuous.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
6
Assembly lines are a special case of a project layout.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
7
A continuous process flow indicates production of discrete parts moving from workstation to workstation at a controlled rate.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
8
Once a choice of position on the product-process matrix is selected change is impossible.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
9
Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
10
Workcenter layouts allocate the same or similar machines into cells to work on products that have dissimilar shapes and dissimilar processing requirements.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
11
A general purpose machine is less capable than a special purpose machine in certain tasks but can perform a broader variety of tasks.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
12
Break-even analysis can only be used in production equipment decision making and deals solely with fixed costs,not variable costs.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
13
The most common production management tools used in planning and designing the process flow are assembly drawings,assembly charts,route sheets and flow process charts.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
14
One trade-off illustrated by the product-process matrix is between flexibility and cost.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
15
Break-Even Analysis can be used to help decide whether to perform a task with a special purpose machine or with a general purpose machine.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
16
One methodology used to evaluate equipment investment decisions where the investment entails a large initial investment,fixed costs and variable costs is break-even analysis.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
17
A project layout is characterized by a relatively low number of production units.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
18
The product-process matrix shows the relationship between process structures and product volume.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
19
One methodology used to evaluate equipment investment decisions where the investment entails a large initial investment,fixed costs and variable costs is break-even analysis.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
20
The choice of which process structure to select is generally a function of the volume requirements for the product.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
21
You are hired as a consultant to decide if your client should purchase a new,highly specialized,piece of equipment.The product to be produced by this equipment is forecast to have a total world wide demand of 15,000 units over the entire product life.The initial investment to acquire and install the equipment is $256,000.The variable cost to produce each unit will be $15 and the selling price for the finished product will be $30.Which of the following best describes the situation the firm is facing?

A)The company will recover its' initial investment
B)The company's total margin will be less than its' investment
C)It's a good investment
D)The break-even is lower than the 15,000 units that are expected to sell
E)All of the above
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following is a basic type of process structure?

A)Process flow diagram
B)Product matrix
C)Process matrix
D)Workcenter
E)Manual assembly
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
23
Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps by which the product is made?

A)Project
B)Workcenter
C)Manufacturing cell
D)Assembly line
E)Continuous process
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
24
Which of the following is not a basic type of process structure?

A)Product-process matrix
B)Workcenter
C)Manufacturing cell
D)Assembly line
E)Continuous process
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
25
Assume a fixed cost for a process of $100,000.The variable cost to produce each unit of product is $10 and the selling price for the finished product is $50.Ignoring inventory,how many units must the firm sell to break-even?
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
26
Assume a fixed cost for a process of $15,000.The variable cost to produce each unit of product is $10 and the selling price for the finished product is $25.Which of the following is the number of units that has to be produced and sold to break-even?

A)500 units
B)667 units
C)790 units
D)900 units
E)1,000 units
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
27
A graphic used in process flow design depicting an exploded view of a product and its component parts is which of the following?

A)Route sheet
B)Gantt chart
C)Assembly drawing
D)Simo chart
E)Packing list
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
28
Give an example of a project layout?
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the following is not considered a major process flow structure?

A)Project
B)Workcenter
C)Assembly line
D)Fabrication
E)Continuous Flow
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
30
Assume a fixed cost for a process of $120,000.The variable cost to produce each unit of product is $35 and the selling price for the finished product is $50.Which of the following is the number of units that has to be produced and sold to break-even?

A)5,000 units
B)6,000 units
C)8,000 units
D)11,000 units
E)12,000 units
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
31
A process flowchart uses the information presented in the assembly drawing and defines how parts go together and their order of assembly.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
32
The formats by which a facility is arranged are defined by the general pattern of work flow.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
33
A manufacturer has identified the options for acquiring a machined part.It can make the part on a numerically controlled lathe for $150 per unit (including materials. )It can make the part on a standard lathe for $250 per unit (also including materials. )It can make the part on a machining center for $50 per unit (also including materials. )The manufacturer can acquire a standard lathe for $10,000.It could acquire a numerically controlled lathe for $100,000.A machining center would cost $350,000.It has also found that it can purchase the part for $350 per unit?
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
34
The major difference between the project and the assembly line categories of process flow structures is which of the following?

A)The size of the product
B)Discrete parts moving from workstation to workstation
C)Highly specialized equipment
D)Being a Virtual Factory
E)The product's volume and standardization
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
35
What is sometimes humorously referred to as a "gozinto chart"?

A)Assembly drawing
B)Assembly chart
C)Process flowchart
D)Operation and route sheet
E)Organization charts
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
36
Assume that you are offered a new piece of equipment for $10,000.The equipment will produce 10,000 units per year with a margin of $6.00 per unit.Demand for the product being produced has been 2,000 units per year.Your current equipment is fully depreciated and can produce the 2,000 units per year at but at a margin of only $4.00 per unit.Under what conditions should you purchase the new equipment?
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
37
Which of the following basic types of process structures is one which similar equipment or functions are grouped together?

A)Project
B)Workcenter
C)Manufacturing cell
D)Assembly line
E)Continuous process
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
38
The most common production management tools used in planning and designing the process flow are assembly drawings,assembly charts,route sheets and product prototypes.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
39
In analysis using a process flowchart of a manufacturing operation,the emphasis is usually on identification of activities that can be minimized or eliminated.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
40
In a factory,machine A has a ten minute set-up time per batch and a two minute per unit run time.Machine B performs the identical function but has a set-up time of thirty minutes and a one minute run time per unit.The factory makes products in batches ranging from one unit to one hundred units.Assuming capacity is not a limitation on either machine,on which batches should machine B be used?

A)All batches should be run on machine B
B)Batches of more than 20 units should be run on machine B
C)Batches of fewer than 80 units should be run on machine B
D)Batches with up to 50 units should be run on machine B
E)No batches should be run on machine B
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
41
Describe the implications of the product-process matrix for process design in a competitive situation?
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
42
Differentiate between a workcenter and a manufacturing cell?
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 42 flashcards in this deck.