Deck 19: Scheduling

Full screen (f)
exit full mode
Question
Using the random order or "whim" priority rule to sequence production jobs means that supervisors select whichever job they feel like running first.
Use Space or
up arrow
down arrow
to flip the card.
Question
A system that "backward schedules" is designed to determine and report the earliest date an order can be completed.
Question
In infinite loading no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work,nor is the actual sequence of the work as done by each resource in the work center considered.
Question
The FCFS priority rule used in sequencing production jobs will always result in a better solution than the LCFS rule.
Question
In production scheduling the process of determining which job to start first on some machine or in some work center is known as sequencing or priority sequencing.
Question
Shop-floor control (or production activity control)can involve expediting late and critical orders.
Question
Initiating performance of scheduled work is commonly termed "dispatching" of orders.
Question
Shop-floor control (or production activity control)can involve reviewing the status and controlling the progress of orders as they are being worked on.
Question
A shop-floor control system is a system that uses data from the shop floor as well as data processing files to maintain and communicate status information on shop orders and work centers.
Question
Theoretically,all schedules are feasible when finite loading is used.
Question
The textbook underscores the importance of scheduling with the phrase "workflow equals cash flow and scheduling lies at the heart of the process".
Question
The assignment method of job sequencing is a special case of the transportation method of linear programming.
Question
In finite loading no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work,nor is the actual sequence of the work as done by each resource in the work center considered.
Question
A backward schedule tells when an order must be started in order to be done by a specific date.
Question
The LCFS and Johnson's priority rules are basically the same except LCFS uses due dates as a major determiner of job sequence.
Question
Johnson's rule,a priority rule used in sequencing production jobs is used only in production situations where we are dealing with one machine or one stage of production activity.
Question
The objective of Johnson's rule for job sequencing is to minimize flow time from the beginning of the first job until the completion of the last job.
Question
Under the STR/OP sequencing priority rule,orders with the jobs with the longest STR/OP are run first.
Question
Priority rules are the rules used to obtain a job sequence in production scheduling.
Question
A work center is a physical area of the business in which productive resources are organized and work is completed.
Question
When work is scheduled in detail using the setup and run time required for each order it is called which of the following?

A)Infinite loading
B)Finite loading
C)Machine-limited
D)Labor-limited
E)Johnson's rule
Question
A material requirements planning system is an example of which of the following scheduling systems?

A)Infinite loading,backward scheduling
B)Finite loading,backward scheduling
C)Infinite loading,forward scheduling
D)Finite loading,forward scheduling
E)None of the above
Question
Which of the following is not a function performed in scheduling and controlling an operation?

A)Allocating orders and equipment
B)Setting priorities and sequencing jobs
C)Allocating personnel to work centers
D)Expediting late orders
E)Reporting bottleneck operations
Question
For a high-volume type of manufacturing which of the following is the typical production scheduling approach?

A)Finite backward scheduling
B)Finite forward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Assignment method
Question
When work is assigned to a work center based on what is needed over time it is called which of the following?

A)Infinite loading
B)Finite loading
C)Machine-limited
D)Labor-limited
E)Johnson's rule
Question
For a mid-volume type of manufacturing which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Precision forward scheduling
Question
For a low-volume job shop type of manufacturing which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite backward scheduling
D)Infinite forward scheduling
E)Soonest due date
Question
Scheduling hourly work times using the "first hour principle" insures that no excess labor will be used during the work shift.
Question
MES and SES are acronyms for "Manufacturing Environment Scheduler" and "Service Environment Scheduler" systems,respectively.
Question
When work is scheduled in detail using the setup and run time required for each order,then theoretically all schedules will be feasible.
Question
Which of the following is not an objective of work center scheduling?

A)Meeting due dates
B)Providing time for quality at the source
C)Minimizing setup time or cost
D)Minimizing work-in-process inventory
E)Minimizing lead time
Question
Which of the following is not a standard measure of schedule performance which can be used to evaluate priority rules?

A)The schedule quality index
B)Minimizing the time a job spends in the process
C)Minimizing work-in-process inventory
D)Minimizing idle time of machines or workers
E)Meeting due dates of customers
Question
The objectives of work center scheduling include which of the following?

A)Minimizing worker alienation
B)Provide variety to workforce
C)Following all the priority rules
D)Avoiding tradeoffs
E)Minimizing set-up costs
Question
One of the principles of work center scheduling is to match work center input information to what the worker can actually do.
Question
For a continuous process type of manufacturing which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Shortest due date
Question
One of the principles of work center scheduling is that the effectiveness of any shop should be measured by speed of flow through the shop.
Question
When work has been scheduled in a shop that does not have sufficient resources to complete the schedule on time,the system that generated the schedule is called which of the following?

A)Infinite loading
B)Machine-limited
C)Finite loading
D)Labor-limited
E)Constrained
Question
Scheduling employees to have two consecutive days off is required by the Fair Labor Standards Act.
Question
One of the principles of work center scheduling is that,while certainty of standards,routings and so forth is not entirely possible in a shop,certainty should always be an objective to work towards.
Question
Which of the following is not a way in which a work center can be organized?

A)According to function in a work center configuration
B)According to function in an assembly line
C)By product in assembly line
D)As a group technology-cell (GT-cell)
E)By product in a flow operation
Question
Which of the following might be a status and exception report used in shop-floor control?

A)Absentee report
B)Quality failure report
C)Shortage lists
D)Expediting report
E)Union activity report
Question
Assume there are five jobs (i.e. ,A,B,C,D and E)that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 3 days (i.e. ,job A will take 3 more days to complete),B will take 9 days,C will take 6 days,D will take 5 days and E will take 8 days.In what order will these jobs be scheduled if using the SOT priority rule for job sequencing?

A)A-B-D-E-C
B)A-D-C-E-B
C)D-C-A-B-E
D)B-E-C-D-A
E)E-D-A-B-C
Question
The assignment method is useful in solving scheduling problems that have which of the following characteristics?

A)There are "n" jobs to be distributed to "n" machines or workers
B)Each job can only be done on one particular machine
C)Speed and efficiency are important
D)The objective is to minimize cost and lateness of delivery
E)The jobs have to go through more than one process
Question
Which of the following is not one of the major functions of shop-floor control?

A)Measure efficiency,utilization and productivity of manpower and machines
B)Assign a priority to each shop order
C)Load machine hours into work stations
D)Track WIP quantity by location by shop order to accounting
E)Convey shop order status information to the office
Question
A job has 5 days of processing time left to do before completion and today is the 10th day of the month.If the job is due on the 14th day of the month,what is its critical ratio?

A)5
B)2
C)0.8
D)0.5
E)0.1
Question
Which of the following is a priority rule used to schedule the sequence of jobs in a production operation?

A)Last come first served
B)Last complaint first
C)First on hand first
D)Longest slack time first
E)Parts on hand first
Question
Which of the following is a principle of work center scheduling?

A)Once started a job can and should be finished even if unavoidably interrupted
B)Reschedule every day
C)Achieve certainty in standards and routings
D)Give work centers less to do then their maximum
E)Assign the first worker to all of the days that require staffing
Question
A machine shop has two machines,A and
B.Four jobs need to be processed through machine A first and B second.Job 1 will take one hour on machine A and three hours on machine
B.Job 2 will take three hours on A and two hours on
B.Job 3,seven on A and three on
B.Job 4,five hours on A and one hour on
B.Using Johnson's rule,in what order should these jobs be done?
Question
Assume there are five jobs (i.e. ,A,B,C,D and E)that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 4 days (i.e. ,job A will take 4 more days to complete),B will take 7 days,C will take 8 days,D will take 2 days and E will take 5 days,which job should be scheduled first if you use the SOT priority rule for job sequencing?

A)A
B)B
C)C
D)D
E)E
Question
Which priority rule is so powerful that it has been called "the most important concept in the entire aspect of sequencing"?
Question
Which of the following is a tool of shop-floor control?

A)The hours worked per employee report
B)The anticipated delay report
C)The permanent work-in-process report
D)Time and motion studies
E)Product and process control report
Question
Which of the following is one of the major functions of shop-floor control?

A)Observing the priorities set for each shop order
B)Keeping work-in-process inventory out of the way
C)Conveying shop-order status information to the office
D)Controlling cost and materials waste
E)Keeping the workforce fully utilized
Question
A job has 10 days of processing time left to do before completion and today is the 5th day of the month.If the job is due on the 15th day of the month,what is its critical ratio?

A)3
B)2
C)1
D)0.8
E)- 0.8
Question
Which of the following priority rules used in scheduling the sequence of production is calculated as the time remaining before the due date minus the remaining processing time,with the smallest value being run first?

A)STR
B)CR
C)SOT
D)LCFS
E)EDD
Question
Assume there are five jobs (i.e. ,A,B,C,D and E)that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 3 days (i.e. ,job A will take 3 more days to complete),B will take 9 days,C will take 6 days,D will take 5 days and E will take 8 days.Which job should be scheduled last if using the SOT priority rule for job sequencing?

A)A
B)B
C)C
D)D
E)E
Question
Assume you are sequencing a job using Johnson's rule.The job requires 7 hours to assemble and then is followed by 8 hours in the painting department.Which of the following is where you would schedule this job?

A)As early as possible in the unfilled job sequence
B)As late as possible in the unfilled job sequence
C)The schedule would depend on the due date
D)Does not matter
E)Johnson's Rule does not apply
Question
A work center has five jobs assigned to it.They are labeled,in the order of their arrival in the shop,as jobs A,B,C,D and E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the first-come-first-served priority rule,in what order should these jobs be undertaken?
Question
Which of the following is not a priority rule used to schedule the sequence of jobs in a production operation?

A)First-come-first served
B)Shortest operating time
C)Last-in-first-out
D)Critical ratio
E)Slack-time-remaining per operation
Question
Assume you are sequencing a job using Johnson's rule.The job requires 3 hours to assemble and then is followed by 2 hours in the painting department.Which of the following is where you would schedule this job?

A)As early as possible in the unfilled job sequence
B)As late as possible in the unfilled job sequence
C)The schedule would depend on the due date
D)Does not matter
E)Johnson's rule does not apply
Question
Which of the following priority rules used in scheduling the sequence of production is calculated as the slack time remaining in the schedule divided by the number of remaining operations,with the smallest value being run first?

A)STR
B)Johnson's
C)STR/OP
D)LCFS
E)FCFS
Question
What is sub-optimization in scheduling?
Question
A work center has five jobs assigned to it.They are labeled,in the order of their arrival in the shop,as jobs A,B,C,D and E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the shortest operating time priority rule,what will be the average lateness of these orders?
Question
A work center has five jobs assigned to it.They are labeled,in the order of their arrival in the shop,as jobs A,B,C,D and E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the slack time remaining priority rule,in what order should these jobs be undertaken?
Question
What is dispatching?
Question
What is the difference between finite and infinite loading?
Question
Distinguish between forward scheduling and backward scheduling?
Question
A work center has five jobs assigned to it.They are labeled,in the order of their arrival in the shop,as jobs A,B,C,D and E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the shortest operating time priority rule,in what order should these jobs be undertaken?
Question
What is Johnson's Rule?
Question
In the context of work assignment,what is infinite loading?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/69
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 19: Scheduling
1
Using the random order or "whim" priority rule to sequence production jobs means that supervisors select whichever job they feel like running first.
True
2
A system that "backward schedules" is designed to determine and report the earliest date an order can be completed.
False
3
In infinite loading no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work,nor is the actual sequence of the work as done by each resource in the work center considered.
True
4
The FCFS priority rule used in sequencing production jobs will always result in a better solution than the LCFS rule.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
5
In production scheduling the process of determining which job to start first on some machine or in some work center is known as sequencing or priority sequencing.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
6
Shop-floor control (or production activity control)can involve expediting late and critical orders.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
7
Initiating performance of scheduled work is commonly termed "dispatching" of orders.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
8
Shop-floor control (or production activity control)can involve reviewing the status and controlling the progress of orders as they are being worked on.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
9
A shop-floor control system is a system that uses data from the shop floor as well as data processing files to maintain and communicate status information on shop orders and work centers.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
10
Theoretically,all schedules are feasible when finite loading is used.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
11
The textbook underscores the importance of scheduling with the phrase "workflow equals cash flow and scheduling lies at the heart of the process".
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
12
The assignment method of job sequencing is a special case of the transportation method of linear programming.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
13
In finite loading no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work,nor is the actual sequence of the work as done by each resource in the work center considered.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
14
A backward schedule tells when an order must be started in order to be done by a specific date.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
15
The LCFS and Johnson's priority rules are basically the same except LCFS uses due dates as a major determiner of job sequence.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
16
Johnson's rule,a priority rule used in sequencing production jobs is used only in production situations where we are dealing with one machine or one stage of production activity.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
17
The objective of Johnson's rule for job sequencing is to minimize flow time from the beginning of the first job until the completion of the last job.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
18
Under the STR/OP sequencing priority rule,orders with the jobs with the longest STR/OP are run first.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
19
Priority rules are the rules used to obtain a job sequence in production scheduling.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
20
A work center is a physical area of the business in which productive resources are organized and work is completed.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
21
When work is scheduled in detail using the setup and run time required for each order it is called which of the following?

A)Infinite loading
B)Finite loading
C)Machine-limited
D)Labor-limited
E)Johnson's rule
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
22
A material requirements planning system is an example of which of the following scheduling systems?

A)Infinite loading,backward scheduling
B)Finite loading,backward scheduling
C)Infinite loading,forward scheduling
D)Finite loading,forward scheduling
E)None of the above
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
23
Which of the following is not a function performed in scheduling and controlling an operation?

A)Allocating orders and equipment
B)Setting priorities and sequencing jobs
C)Allocating personnel to work centers
D)Expediting late orders
E)Reporting bottleneck operations
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
24
For a high-volume type of manufacturing which of the following is the typical production scheduling approach?

A)Finite backward scheduling
B)Finite forward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Assignment method
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
25
When work is assigned to a work center based on what is needed over time it is called which of the following?

A)Infinite loading
B)Finite loading
C)Machine-limited
D)Labor-limited
E)Johnson's rule
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
26
For a mid-volume type of manufacturing which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Precision forward scheduling
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
27
For a low-volume job shop type of manufacturing which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite backward scheduling
D)Infinite forward scheduling
E)Soonest due date
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
28
Scheduling hourly work times using the "first hour principle" insures that no excess labor will be used during the work shift.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
29
MES and SES are acronyms for "Manufacturing Environment Scheduler" and "Service Environment Scheduler" systems,respectively.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
30
When work is scheduled in detail using the setup and run time required for each order,then theoretically all schedules will be feasible.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following is not an objective of work center scheduling?

A)Meeting due dates
B)Providing time for quality at the source
C)Minimizing setup time or cost
D)Minimizing work-in-process inventory
E)Minimizing lead time
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
32
Which of the following is not a standard measure of schedule performance which can be used to evaluate priority rules?

A)The schedule quality index
B)Minimizing the time a job spends in the process
C)Minimizing work-in-process inventory
D)Minimizing idle time of machines or workers
E)Meeting due dates of customers
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
33
The objectives of work center scheduling include which of the following?

A)Minimizing worker alienation
B)Provide variety to workforce
C)Following all the priority rules
D)Avoiding tradeoffs
E)Minimizing set-up costs
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
34
One of the principles of work center scheduling is to match work center input information to what the worker can actually do.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
35
For a continuous process type of manufacturing which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Shortest due date
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
36
One of the principles of work center scheduling is that the effectiveness of any shop should be measured by speed of flow through the shop.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
37
When work has been scheduled in a shop that does not have sufficient resources to complete the schedule on time,the system that generated the schedule is called which of the following?

A)Infinite loading
B)Machine-limited
C)Finite loading
D)Labor-limited
E)Constrained
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
38
Scheduling employees to have two consecutive days off is required by the Fair Labor Standards Act.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
39
One of the principles of work center scheduling is that,while certainty of standards,routings and so forth is not entirely possible in a shop,certainty should always be an objective to work towards.
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
40
Which of the following is not a way in which a work center can be organized?

A)According to function in a work center configuration
B)According to function in an assembly line
C)By product in assembly line
D)As a group technology-cell (GT-cell)
E)By product in a flow operation
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
41
Which of the following might be a status and exception report used in shop-floor control?

A)Absentee report
B)Quality failure report
C)Shortage lists
D)Expediting report
E)Union activity report
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
42
Assume there are five jobs (i.e. ,A,B,C,D and E)that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 3 days (i.e. ,job A will take 3 more days to complete),B will take 9 days,C will take 6 days,D will take 5 days and E will take 8 days.In what order will these jobs be scheduled if using the SOT priority rule for job sequencing?

A)A-B-D-E-C
B)A-D-C-E-B
C)D-C-A-B-E
D)B-E-C-D-A
E)E-D-A-B-C
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
43
The assignment method is useful in solving scheduling problems that have which of the following characteristics?

A)There are "n" jobs to be distributed to "n" machines or workers
B)Each job can only be done on one particular machine
C)Speed and efficiency are important
D)The objective is to minimize cost and lateness of delivery
E)The jobs have to go through more than one process
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
44
Which of the following is not one of the major functions of shop-floor control?

A)Measure efficiency,utilization and productivity of manpower and machines
B)Assign a priority to each shop order
C)Load machine hours into work stations
D)Track WIP quantity by location by shop order to accounting
E)Convey shop order status information to the office
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
45
A job has 5 days of processing time left to do before completion and today is the 10th day of the month.If the job is due on the 14th day of the month,what is its critical ratio?

A)5
B)2
C)0.8
D)0.5
E)0.1
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
46
Which of the following is a priority rule used to schedule the sequence of jobs in a production operation?

A)Last come first served
B)Last complaint first
C)First on hand first
D)Longest slack time first
E)Parts on hand first
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
47
Which of the following is a principle of work center scheduling?

A)Once started a job can and should be finished even if unavoidably interrupted
B)Reschedule every day
C)Achieve certainty in standards and routings
D)Give work centers less to do then their maximum
E)Assign the first worker to all of the days that require staffing
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
48
A machine shop has two machines,A and
B.Four jobs need to be processed through machine A first and B second.Job 1 will take one hour on machine A and three hours on machine
B.Job 2 will take three hours on A and two hours on
B.Job 3,seven on A and three on
B.Job 4,five hours on A and one hour on
B.Using Johnson's rule,in what order should these jobs be done?
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
49
Assume there are five jobs (i.e. ,A,B,C,D and E)that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 4 days (i.e. ,job A will take 4 more days to complete),B will take 7 days,C will take 8 days,D will take 2 days and E will take 5 days,which job should be scheduled first if you use the SOT priority rule for job sequencing?

A)A
B)B
C)C
D)D
E)E
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
50
Which priority rule is so powerful that it has been called "the most important concept in the entire aspect of sequencing"?
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
51
Which of the following is a tool of shop-floor control?

A)The hours worked per employee report
B)The anticipated delay report
C)The permanent work-in-process report
D)Time and motion studies
E)Product and process control report
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
52
Which of the following is one of the major functions of shop-floor control?

A)Observing the priorities set for each shop order
B)Keeping work-in-process inventory out of the way
C)Conveying shop-order status information to the office
D)Controlling cost and materials waste
E)Keeping the workforce fully utilized
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
53
A job has 10 days of processing time left to do before completion and today is the 5th day of the month.If the job is due on the 15th day of the month,what is its critical ratio?

A)3
B)2
C)1
D)0.8
E)- 0.8
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
54
Which of the following priority rules used in scheduling the sequence of production is calculated as the time remaining before the due date minus the remaining processing time,with the smallest value being run first?

A)STR
B)CR
C)SOT
D)LCFS
E)EDD
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
55
Assume there are five jobs (i.e. ,A,B,C,D and E)that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 3 days (i.e. ,job A will take 3 more days to complete),B will take 9 days,C will take 6 days,D will take 5 days and E will take 8 days.Which job should be scheduled last if using the SOT priority rule for job sequencing?

A)A
B)B
C)C
D)D
E)E
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
56
Assume you are sequencing a job using Johnson's rule.The job requires 7 hours to assemble and then is followed by 8 hours in the painting department.Which of the following is where you would schedule this job?

A)As early as possible in the unfilled job sequence
B)As late as possible in the unfilled job sequence
C)The schedule would depend on the due date
D)Does not matter
E)Johnson's Rule does not apply
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
57
A work center has five jobs assigned to it.They are labeled,in the order of their arrival in the shop,as jobs A,B,C,D and E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the first-come-first-served priority rule,in what order should these jobs be undertaken?
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
58
Which of the following is not a priority rule used to schedule the sequence of jobs in a production operation?

A)First-come-first served
B)Shortest operating time
C)Last-in-first-out
D)Critical ratio
E)Slack-time-remaining per operation
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
59
Assume you are sequencing a job using Johnson's rule.The job requires 3 hours to assemble and then is followed by 2 hours in the painting department.Which of the following is where you would schedule this job?

A)As early as possible in the unfilled job sequence
B)As late as possible in the unfilled job sequence
C)The schedule would depend on the due date
D)Does not matter
E)Johnson's rule does not apply
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following priority rules used in scheduling the sequence of production is calculated as the slack time remaining in the schedule divided by the number of remaining operations,with the smallest value being run first?

A)STR
B)Johnson's
C)STR/OP
D)LCFS
E)FCFS
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
61
What is sub-optimization in scheduling?
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
62
A work center has five jobs assigned to it.They are labeled,in the order of their arrival in the shop,as jobs A,B,C,D and E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the shortest operating time priority rule,what will be the average lateness of these orders?
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
63
A work center has five jobs assigned to it.They are labeled,in the order of their arrival in the shop,as jobs A,B,C,D and E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the slack time remaining priority rule,in what order should these jobs be undertaken?
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
64
What is dispatching?
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
65
What is the difference between finite and infinite loading?
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
66
Distinguish between forward scheduling and backward scheduling?
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
67
A work center has five jobs assigned to it.They are labeled,in the order of their arrival in the shop,as jobs A,B,C,D and E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the shortest operating time priority rule,in what order should these jobs be undertaken?
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
68
What is Johnson's Rule?
Unlock Deck
Unlock for access to all 69 flashcards in this deck.
Unlock Deck
k this deck
69
In the context of work assignment,what is infinite loading?