Deck 18: Material Requirements Planning

Full screen (f)
exit full mode
Question
The deeper one looks into the product creation sequence,the more the requirements of dependent demand items tend to smooth out and become even over time.
Use Space or
up arrow
down arrow
to flip the card.
Question
Management defines time fences as periods of time having some specific Level of opportunity for the customer to make changes.
Question
A master production schedule is an essential input to a material requirements planning (MRP)system.
Question
The master production schedule (MPS)is a time-phased plan specifying how many of each end item to build and when the firm plans to build them.
Question
Use of time fences maintains a reasonably controlled flow through a production system.
Question
MRP is most valuable in industries where a number of products are made in batches using the same productive equipment.
Question
MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.
Question
All firms maintain bill of materials (BOM)files,which are simply a sequencing of everything that goes into a final product.
Question
MRP is a logical,easily understandable approach to the problem of determining the number of parts,components and materials needed to produce each end item.
Question
A time fence is a unit of productivity related to time.
Question
MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.
Question
A necessary input to the material requirements planning (MRP)system is an exception report.
Question
MRP is based on dependent demand.
Question
MRP stands for Manufacturing Requirements Planning.
Question
Developing the master production schedule is done by disaggregating the aggregate production plan.
Question
Time fences increase productivity by reducing the time spent waiting for each product to be produced.
Question
MRP II stands for Manufacturing Resource Planning.
Question
The deeper one looks into the product creation sequence,the more the requirements of dependent demand items tend to become "lumpy".
Question
The master production schedule states the number of items to be produced during specific time periods.
Question
A necessary input to the material requirements planning (MRP)system is an inventory records file.
Question
A BOM file is often called a product structure file or product tree because it enumerates all of the component parts of the end item product.
Question
One of the biggest complaints by users of MRP systems is that MRP is too flexible in making changes in schedules when the need arises.
Question
In today's modern world of rapid computing and just-in-time replenishment of supplies,freezing the master production schedule is unnecessary.
Question
A modular bill of materials includes items with fractional options.
Question
To implement a MRP system successfully,a high degree of inventory and bill-of-material accuracy is required.This may involve significant change in how a firm operates.
Question
Computing the quantity of each component that goes into a finished product requires expanding (or exploding)each item in a product structure file and summing at all Levels.
Question
In a net change MRP system requirements and schedules are considered rigid and never updated.
Question
In a net change MRP system requirements and schedules are updated whenever a transaction is processed that has an impact on the item.
Question
Low Level coding in MRP indicates the exact status of each item managed by the system in "real time".
Question
Net change MRP systems are "activity" driven.
Question
An MRP program with a capacity requirements planning module allows rescheduling to try to Level capacity.
Question
One of the outputs of an MRP system is a bill of materials (BOM)file.
Question
A modular bill of materials is the term for an item that can be produced and stocked as a subassembly.
Question
The MRP program performs its analysis from the bottom of the product structure trees up,imploding requirements Level by Level.
Question
Computing the quantities of each component that goes into a finished product requires expanding (or exploding)each item in a product structure file and summing at all Levels.
Question
If you cannot provide a master production schedule (MPS)as an input file,you cannot run a material requirements planning (MRP)system.
Question
The philosophy of material requirements planning is that materials should be expedited when their lack would delay the overall production schedule and de-expedited when the schedule falls behind and postpones their need.
Question
The "theme" of MRP is getting the right materials to the right place before they are needed.
Question
Net change MRP reflects the exact status of each item managed by the system in "real time".
Goal: 3
Question
In a net change MRP program,a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.
Question
Projected available balance is the amount of inventory that is expected as of the beginning of a period.
Question
A BOM file is sometimes called which of the following?

A)Product structure tree
B)Stocking plan
C)Inventory usage record
D)Production parts plan
E)Time bucket schedule
Question
The economic order quantity (EOQ)lot sizing technique produces or acquires exactly the amount of product that is needed each time period with none carried over into future periods.
Question
The lot-for-lot (L4L)lot sizing technique minimizes carrying cost by taking into account setup costs and capacity limitations.
Question
The three main inputs to an MRP system are the bill of materials,the master schedule and the inventory records file.
Question
A material requirements planning (MRP)system with information feedback from its module outputs is termed a "closed-loop MRP" system.
Question
The least total cost method (LTC)lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal.
Question
"Available to promise" is a term referring to unsold finished goods inventory.
Question
The least unit cost method (LUC)of lot-sizing technique adds ordering,stock-out and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost.
Question
Which of the following industry types will not benefit greatly from the application of MRP?

A)Fabricate-to-order
B)Assemble-to-stock
C)Assemble-to-order
D)Manufacture-to-order
E)None of the above
Question
Lot-for-lot (L4L)is the most common lot sizing technique.
Question
Which of the following industry types have high expected benefits from the application of MRP?

A)Fabricate-to-stock
B)Fabricate-to-order
C)Assemble-to-stock
D)Continuous process
E)Service and repair parts
Question
A lot-for-lot (L4L)lot sizing technique does not take into account setup costs or capacity limitations.
Question
Since MRP systems focus on batch or lot-sized orders and JIT is focused on individual item production,the two systems are incompatible and cannot work together.
Question
The difference between the number of units currently included in the master schedule and the number of units in firm customer orders is often called "available to promise".
Question
"Projected available balance" is a term referring to unsold finished goods inventory.
Question
The economic order quantity (EOQ)lot sizing technique uses the "square root formula" to balance set-up cost,carrying cost and cost of stock-outs.
Question
The least unit cost method (LUC)of lot-sizing technique adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost.
Question
Generally,determining lot sizes in MRP systems is simple.
Question
The least unit cost method (LUC)lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal.
Question
An improvement noted by many firms after implementation of MRP is which of the following?

A)Increased idle time
B)Quicker setup times
C)Inability to change the master schedule
D)Reduced inventory
E)Improved product design-for-manufacture
Question
To ensure good master scheduling,the master scheduler should do which of the following?

A)Continually rework the aggregate plan
B)Be involved with customer order promising
C)Be invisible to management
D)Cover-up all problems
E)Focus on getting out product before it is needed
Question
Which of the following is not a production activity report generated by MRP?

A)Exception report
B)Planning report
C)Performance control report
D)Planned-order schedules
E)Bill of materials report
Question
One of the main purposes of a MRP system is which of the following?

A)Track inventory Levels
B)Create productive capacity
C)Decrease layers of management
D)Develop schedules for when each component should be produced
E)Upgrade manufacturing's professionalism
Question
Which of the following is an input to the master production schedule?

A)Prototype products from product development
B)Aggregate component schedule
C)Peg records
D)Exception reports
E)Forecasts of demand from random customers
Question
MRP systems seek to achieve which of the following?

A)Minimize lot sizes
B)Determine the number of dependent demand items needed
C)Give immediate capacity relief
D)Provide a yardstick for future improvements
E)Improve on JIT methods
Question
Which of the following industry types have high expected benefits from the application of MRP?

A)Fabricate-to-order
B)Hospitals
C)Assemble-to-order
D)Aircraft manufacturers
E)Oil refineries
Question
An improvement noted by many firms after implementation of MRP is which of the following?

A)Increased prices
B)Increased inventory
C)Improved customer service
D)Reduced raw materials cost
E)Enhanced employee relations
Question
Which of the following is a capability of MRP systems that improves operations planning and control?

A)MRP indicates when to de-expedite as well as expedite orders
B)MRP systems consume many reams of paper thereby justifying quantity purchases
C)Once entered;a production order can't be changed,enforcing discipline on sales
D)MRP can anticipate returns of defective product
E)MRP allows manufacturing to operate in a pure,isolated environment
Question
Which of the following is an input to the master production schedule?

A)Bill of materials (BOM)file
B)Inventory records file
C)Exception reports
D)Planned-order schedules
E)None of the above
Question
Objectives of inventory management under an MRP system include which of the following?

A)Improve customer service
B)Reduce the cost of capital
C)Calibrate operating efficiencies
D)Minimize lot sizes
E)Reduce inventory to zero
Question
Which of the following is a time fence operating mode?

A)Frozen
B)Moderately soft
C)Inflexible
D)Delayed
E)Quality control hold
Question
Which of the following is an input to the master production schedule (MPS)?

A)Inventory records file
B)The aggregate plan
C)The bill of materials
D)The exception report
E)Planned order schedules
Question
Which of the following is one of the main purposes of a MRP system?

A)Educate personnel in basic work rules
B)To determine time schedules for material procurement
C)Stimulate the work force
D)Decrease labor requirements
E)Increase inventory accuracy
Question
In an MRP program,the program accesses the status of any file in specific periods called which of the following?

A)Cubed time units
B)Time buckets
C)BOM units
D)Modular time units
E)Time fences
Question
Which of the following is most closely related to the reason a firm might implement MRP?

A)So they can order the right parts
B)So they can order parts sufficient for immediate use
C)So they can insure that parts to arrive prior to when they are needed
D)To assure appropriate quality Levels
E)To keep process costs between the LCL and the UCL
Question
Which of the following is an input file necessary to run an MRP system?

A)Bill of materials (BOM)file
B)Quality management report
C)Exception reports
D)Planned-order schedules
E)Purchasing contracts
Question
A product structure tree can do which of the following?

A)Help to compute component usage
B)Reduce product scrap
C)Reduce labor overtime
D)Reduce regular time labor
E)Locate raw material supplies
Question
Which of the following is a major reason that some MRP systems fail?

A)Lack of top management understanding and commitment
B)Failure to properly install the MRP software
C)Using an underpowered computer
D)Technical incompetence in manufacturing
E)Vendors or customers using JIT systems
Question
Which of the following is an input file necessary to run an MRP system?

A)Exception report
B)Computer-aided-design files
C)Inventory records file
D)Personnel files
E)Time fence file
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/111
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 18: Material Requirements Planning
1
The deeper one looks into the product creation sequence,the more the requirements of dependent demand items tend to smooth out and become even over time.
False
2
Management defines time fences as periods of time having some specific Level of opportunity for the customer to make changes.
True
3
A master production schedule is an essential input to a material requirements planning (MRP)system.
True
4
The master production schedule (MPS)is a time-phased plan specifying how many of each end item to build and when the firm plans to build them.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
5
Use of time fences maintains a reasonably controlled flow through a production system.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
6
MRP is most valuable in industries where a number of products are made in batches using the same productive equipment.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
7
MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
8
All firms maintain bill of materials (BOM)files,which are simply a sequencing of everything that goes into a final product.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
9
MRP is a logical,easily understandable approach to the problem of determining the number of parts,components and materials needed to produce each end item.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
10
A time fence is a unit of productivity related to time.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
11
MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
12
A necessary input to the material requirements planning (MRP)system is an exception report.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
13
MRP is based on dependent demand.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
14
MRP stands for Manufacturing Requirements Planning.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
15
Developing the master production schedule is done by disaggregating the aggregate production plan.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
16
Time fences increase productivity by reducing the time spent waiting for each product to be produced.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
17
MRP II stands for Manufacturing Resource Planning.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
18
The deeper one looks into the product creation sequence,the more the requirements of dependent demand items tend to become "lumpy".
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
19
The master production schedule states the number of items to be produced during specific time periods.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
20
A necessary input to the material requirements planning (MRP)system is an inventory records file.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
21
A BOM file is often called a product structure file or product tree because it enumerates all of the component parts of the end item product.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
22
One of the biggest complaints by users of MRP systems is that MRP is too flexible in making changes in schedules when the need arises.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
23
In today's modern world of rapid computing and just-in-time replenishment of supplies,freezing the master production schedule is unnecessary.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
24
A modular bill of materials includes items with fractional options.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
25
To implement a MRP system successfully,a high degree of inventory and bill-of-material accuracy is required.This may involve significant change in how a firm operates.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
26
Computing the quantity of each component that goes into a finished product requires expanding (or exploding)each item in a product structure file and summing at all Levels.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
27
In a net change MRP system requirements and schedules are considered rigid and never updated.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
28
In a net change MRP system requirements and schedules are updated whenever a transaction is processed that has an impact on the item.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
29
Low Level coding in MRP indicates the exact status of each item managed by the system in "real time".
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
30
Net change MRP systems are "activity" driven.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
31
An MRP program with a capacity requirements planning module allows rescheduling to try to Level capacity.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
32
One of the outputs of an MRP system is a bill of materials (BOM)file.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
33
A modular bill of materials is the term for an item that can be produced and stocked as a subassembly.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
34
The MRP program performs its analysis from the bottom of the product structure trees up,imploding requirements Level by Level.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
35
Computing the quantities of each component that goes into a finished product requires expanding (or exploding)each item in a product structure file and summing at all Levels.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
36
If you cannot provide a master production schedule (MPS)as an input file,you cannot run a material requirements planning (MRP)system.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
37
The philosophy of material requirements planning is that materials should be expedited when their lack would delay the overall production schedule and de-expedited when the schedule falls behind and postpones their need.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
38
The "theme" of MRP is getting the right materials to the right place before they are needed.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
39
Net change MRP reflects the exact status of each item managed by the system in "real time".
Goal: 3
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
40
In a net change MRP program,a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
41
Projected available balance is the amount of inventory that is expected as of the beginning of a period.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
42
A BOM file is sometimes called which of the following?

A)Product structure tree
B)Stocking plan
C)Inventory usage record
D)Production parts plan
E)Time bucket schedule
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
43
The economic order quantity (EOQ)lot sizing technique produces or acquires exactly the amount of product that is needed each time period with none carried over into future periods.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
44
The lot-for-lot (L4L)lot sizing technique minimizes carrying cost by taking into account setup costs and capacity limitations.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
45
The three main inputs to an MRP system are the bill of materials,the master schedule and the inventory records file.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
46
A material requirements planning (MRP)system with information feedback from its module outputs is termed a "closed-loop MRP" system.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
47
The least total cost method (LTC)lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
48
"Available to promise" is a term referring to unsold finished goods inventory.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
49
The least unit cost method (LUC)of lot-sizing technique adds ordering,stock-out and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
50
Which of the following industry types will not benefit greatly from the application of MRP?

A)Fabricate-to-order
B)Assemble-to-stock
C)Assemble-to-order
D)Manufacture-to-order
E)None of the above
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
51
Lot-for-lot (L4L)is the most common lot sizing technique.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
52
Which of the following industry types have high expected benefits from the application of MRP?

A)Fabricate-to-stock
B)Fabricate-to-order
C)Assemble-to-stock
D)Continuous process
E)Service and repair parts
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
53
A lot-for-lot (L4L)lot sizing technique does not take into account setup costs or capacity limitations.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
54
Since MRP systems focus on batch or lot-sized orders and JIT is focused on individual item production,the two systems are incompatible and cannot work together.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
55
The difference between the number of units currently included in the master schedule and the number of units in firm customer orders is often called "available to promise".
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
56
"Projected available balance" is a term referring to unsold finished goods inventory.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
57
The economic order quantity (EOQ)lot sizing technique uses the "square root formula" to balance set-up cost,carrying cost and cost of stock-outs.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
58
The least unit cost method (LUC)of lot-sizing technique adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size,picking the lot size with the lowest unit cost.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
59
Generally,determining lot sizes in MRP systems is simple.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
60
The least unit cost method (LUC)lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal.
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
61
An improvement noted by many firms after implementation of MRP is which of the following?

A)Increased idle time
B)Quicker setup times
C)Inability to change the master schedule
D)Reduced inventory
E)Improved product design-for-manufacture
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
62
To ensure good master scheduling,the master scheduler should do which of the following?

A)Continually rework the aggregate plan
B)Be involved with customer order promising
C)Be invisible to management
D)Cover-up all problems
E)Focus on getting out product before it is needed
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
63
Which of the following is not a production activity report generated by MRP?

A)Exception report
B)Planning report
C)Performance control report
D)Planned-order schedules
E)Bill of materials report
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
64
One of the main purposes of a MRP system is which of the following?

A)Track inventory Levels
B)Create productive capacity
C)Decrease layers of management
D)Develop schedules for when each component should be produced
E)Upgrade manufacturing's professionalism
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
65
Which of the following is an input to the master production schedule?

A)Prototype products from product development
B)Aggregate component schedule
C)Peg records
D)Exception reports
E)Forecasts of demand from random customers
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
66
MRP systems seek to achieve which of the following?

A)Minimize lot sizes
B)Determine the number of dependent demand items needed
C)Give immediate capacity relief
D)Provide a yardstick for future improvements
E)Improve on JIT methods
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
67
Which of the following industry types have high expected benefits from the application of MRP?

A)Fabricate-to-order
B)Hospitals
C)Assemble-to-order
D)Aircraft manufacturers
E)Oil refineries
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
68
An improvement noted by many firms after implementation of MRP is which of the following?

A)Increased prices
B)Increased inventory
C)Improved customer service
D)Reduced raw materials cost
E)Enhanced employee relations
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
69
Which of the following is a capability of MRP systems that improves operations planning and control?

A)MRP indicates when to de-expedite as well as expedite orders
B)MRP systems consume many reams of paper thereby justifying quantity purchases
C)Once entered;a production order can't be changed,enforcing discipline on sales
D)MRP can anticipate returns of defective product
E)MRP allows manufacturing to operate in a pure,isolated environment
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
70
Which of the following is an input to the master production schedule?

A)Bill of materials (BOM)file
B)Inventory records file
C)Exception reports
D)Planned-order schedules
E)None of the above
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
71
Objectives of inventory management under an MRP system include which of the following?

A)Improve customer service
B)Reduce the cost of capital
C)Calibrate operating efficiencies
D)Minimize lot sizes
E)Reduce inventory to zero
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
72
Which of the following is a time fence operating mode?

A)Frozen
B)Moderately soft
C)Inflexible
D)Delayed
E)Quality control hold
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
73
Which of the following is an input to the master production schedule (MPS)?

A)Inventory records file
B)The aggregate plan
C)The bill of materials
D)The exception report
E)Planned order schedules
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
74
Which of the following is one of the main purposes of a MRP system?

A)Educate personnel in basic work rules
B)To determine time schedules for material procurement
C)Stimulate the work force
D)Decrease labor requirements
E)Increase inventory accuracy
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
75
In an MRP program,the program accesses the status of any file in specific periods called which of the following?

A)Cubed time units
B)Time buckets
C)BOM units
D)Modular time units
E)Time fences
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
76
Which of the following is most closely related to the reason a firm might implement MRP?

A)So they can order the right parts
B)So they can order parts sufficient for immediate use
C)So they can insure that parts to arrive prior to when they are needed
D)To assure appropriate quality Levels
E)To keep process costs between the LCL and the UCL
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
77
Which of the following is an input file necessary to run an MRP system?

A)Bill of materials (BOM)file
B)Quality management report
C)Exception reports
D)Planned-order schedules
E)Purchasing contracts
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
78
A product structure tree can do which of the following?

A)Help to compute component usage
B)Reduce product scrap
C)Reduce labor overtime
D)Reduce regular time labor
E)Locate raw material supplies
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
79
Which of the following is a major reason that some MRP systems fail?

A)Lack of top management understanding and commitment
B)Failure to properly install the MRP software
C)Using an underpowered computer
D)Technical incompetence in manufacturing
E)Vendors or customers using JIT systems
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
80
Which of the following is an input file necessary to run an MRP system?

A)Exception report
B)Computer-aided-design files
C)Inventory records file
D)Personnel files
E)Time fence file
Unlock Deck
Unlock for access to all 111 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 111 flashcards in this deck.