Deck 20: Production and Inventory Control
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/68
Play
Full screen (f)
Deck 20: Production and Inventory Control
1
JIT production systems usually call for very few supplies with single or dual sources under long term contracts.
True
2
The MRP inventory/open order netting function is used to develop "planned order releases".
False
3
MRO inventories include in process and semi finished goods.
False
4
The buyer/planner and supplier scheduler concepts usually require long term contracts.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
5
JIT production planning is basically a "pull" system where as MRP is basically a "push" system.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
6
Materials Requirement Planning (MRP)uses the Master Planning Schedule (MPS)to "explode" the product Bill of Material (BOM)to calculate the required number of parts needed.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
7
MRP and MRP II systems are the same,i.e.MRP II is merely the 2nd evolution of MRP.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
8
Once the CRP system issues the routing data,it is no longer necessary to check work center status files.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
9
Capacity Requirements Planning (CRP)converts shop orders produced by the MRP system into scheduled work loads for the various work centers.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
10
In most firms,forecasting demand is the responsibility of the marketing/sales department.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
11
Inventory counts can be 90% accurate and still be useful.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
12
MRP logic is based on dependent demand.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
13
JIT can be used in most manufacturing situations.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
14
Detailed production scheduling comes after the release and dispatching of orders.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
15
The Master Production Schedule (MPS)is developed directly from the capacity requirements planning (CRP).
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
16
Inventories help balance the firm's supply with the market forces of demand.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
17
Aggregate planning and master scheduling rely on accurate forecasting of demand.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
18
MRP and ERP systems are one in the same.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
19
Reporting and monitory production status requires constant feed back from all the relevant people including work station operators.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
20
Just-In-Time (JIT)production planning has as its basic theme that "inventory is evil".
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
21
A good example of independent demand is retail inventory.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
22
The ABC Analysis uses the 80-20 concept or the pareto principle.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
23
Flow control inventory systems work best in job shop operations.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
24
In reorder point inventory systems,safety stock is the maximum lead time usage plus the average lead-time usage.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
25
The basic weakness of the EOQ concept is that most users of the formula use average costs.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
26
Just-In-Time (JIT)inventory seeks to match factory output tightly to distribution demand for finished goods,i.e.a pull system.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
27
Order point or fixed order quantity systems use variable quantities for the reorder points.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
28
The most serious problem in using an order point system stems from the fact that it works on the basis of historical rather than actual demand data.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
29
JIT inventory control works best under conditions of dependent demand.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
30
The first objective of production planning is:
A) To meet customer demand
B) Minimize total costs
C) To coordinate and synchronize resources and work
D) Provide progress surveillance and correction
E) Dispatch orders
A) To meet customer demand
B) Minimize total costs
C) To coordinate and synchronize resources and work
D) Provide progress surveillance and correction
E) Dispatch orders
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
31
EOQ logic requires the use of incremental costs.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
32
C items require more management supervision because they represent such large numbers of items.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
33
Supplier managed inventories can result in major savings by contracting with the supplier to manage,stock and operate MRO,tools,office supplies and other support material.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
34
The inventory catalog helps prevent accidental duplication of identical items from different suppliers and internal departments.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
35
The Two-Bin system is often used for low-value hardware and supplies whose usage is not recorded in a perpetual record.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
36
Acquisition costs are the indirect costs of ordering materials.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
37
MRP systems calculate inventory based on the quantity purchased when each order is placed,the purchase lead time and safety stock.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
38
Usually,the highest percentage of inventory carrying costs is the opportunity cost.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
39
Fixed order interval inventory control systems require a review of perpetual inventory records.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
40
EOQ gives the delivery quantity when the carrying costs are at their lowest point.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
41
The two costs associated with inventories are:
A) Fixed, variable
B) Carrying, acquisition
C) Overhead, burden
D) Storage, semi fixed
E) Programmed, stand by
A) Fixed, variable
B) Carrying, acquisition
C) Overhead, burden
D) Storage, semi fixed
E) Programmed, stand by
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
42
The relationship between the aggregate plan and Master Production Schedule (MPS)is:
A) The aggregate plan balances the plant's capacity with demand and the MPS translates this plan into numbers of specific products in time frames
B) The aggregate plan is for 6 months and the MPS is for 3 months
C) The aggregate plan uses simulation and the MPS uses regression analysis
D) The MPS calculates labor time and the aggregate calculates labor and material
E) MPS starts with macro units and the aggregate plan starts with micro units
A) The aggregate plan balances the plant's capacity with demand and the MPS translates this plan into numbers of specific products in time frames
B) The aggregate plan is for 6 months and the MPS is for 3 months
C) The aggregate plan uses simulation and the MPS uses regression analysis
D) The MPS calculates labor time and the aggregate calculates labor and material
E) MPS starts with macro units and the aggregate plan starts with micro units
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
43
EOQ analysis seeks to reveal:
A) The lowest acquisition costs
B) The lowest carrying costs
C) The low point on the TC curve
D) The safety or buffer stock number
E) The lowest purchase price
A) The lowest acquisition costs
B) The lowest carrying costs
C) The low point on the TC curve
D) The safety or buffer stock number
E) The lowest purchase price
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
44
The function of Capacity Requirements Planning (CRP)is to
A) Insure accurate inventory counts
B) Convert shop orders into scheduled work loads for factory work centers
C) Verify that the bill of material is accurate
D) Calculate "encumbered" inventory
E) Confirm that the MPS is accurate
A) Insure accurate inventory counts
B) Convert shop orders into scheduled work loads for factory work centers
C) Verify that the bill of material is accurate
D) Calculate "encumbered" inventory
E) Confirm that the MPS is accurate
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
45
The difference between MRP and MRP II is:
A) MRP is closed loop
B) MRP II is the advanced version of MRP
C) MRP II can be used to adjust schedule changes
D) MRP II is a closed loop and primarily converts operating production plans into financial data
E) MRP is the "umbrella" system for MRP II
A) MRP is closed loop
B) MRP II is the advanced version of MRP
C) MRP II can be used to adjust schedule changes
D) MRP II is a closed loop and primarily converts operating production plans into financial data
E) MRP is the "umbrella" system for MRP II
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
46
Just-In-Time (JIT)production planning relies on:
A) Close to zero defects from suppliers
B) Low inventory with materials sent directly to work stations
C) Long term, collaborative contracts with suppliers
D) The ability to "pull" production rather than "push" it from the front end
E) All of the above
A) Close to zero defects from suppliers
B) Low inventory with materials sent directly to work stations
C) Long term, collaborative contracts with suppliers
D) The ability to "pull" production rather than "push" it from the front end
E) All of the above
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
47
The inventory catalog is a useful tool to:
A) List all inventory "in-process"
B) List all MRO inventory
C) Communicate all approved parts by number and supplier to avoid duplication
D) List all production inventory
E) List all finished goods inventory
A) List all inventory "in-process"
B) List all MRO inventory
C) Communicate all approved parts by number and supplier to avoid duplication
D) List all production inventory
E) List all finished goods inventory
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
48
The inventory/open order netting concept is used to determine the
A) Planned order releases
B) Time phasing
C) Bill of material
D) MPS
E) "On hand" balances
A) Planned order releases
B) Time phasing
C) Bill of material
D) MPS
E) "On hand" balances
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
49
A major impact of JIT on purchasing and supply is:
A) Pricing
B) Delivery
C) Quality
D) Quantity
E) Sourcing and contracting
A) Pricing
B) Delivery
C) Quality
D) Quantity
E) Sourcing and contracting
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
50
In a majority of firms,forecasting demand is the responsibility of the
A) Finance department
B) Marketing/Sales department
C) Production department
D) Product Development department
E) Engineering department
A) Finance department
B) Marketing/Sales department
C) Production department
D) Product Development department
E) Engineering department
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
51
JIT systems work the best when the firm:
A) Produces a large number of different products
B) Has widely fluctuating demand
C) Has a large inspection department
D) Production operation set up requirements have short change over times
E) None of the above
A) Produces a large number of different products
B) Has widely fluctuating demand
C) Has a large inspection department
D) Production operation set up requirements have short change over times
E) None of the above
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
52
The multilevel nature of production planning systems requires
A) An elaborate reporting system
B) Supervision by one key manager
C) Coordination of production planning, control and supervisory operating personnel
D) Daily staff meetings
E) A special department to control production
A) An elaborate reporting system
B) Supervision by one key manager
C) Coordination of production planning, control and supervisory operating personnel
D) Daily staff meetings
E) A special department to control production
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
53
When we observe that the production planning system is "dynamic",we are saying
A) MRP systems can not cope with changing demand
B) Outsourcing will help stabilize arriving materials
C) CRP and MRP systems must be constantly reviewed
D) It is wise to re-plan on a weekly basis
E) None of the above
A) MRP systems can not cope with changing demand
B) Outsourcing will help stabilize arriving materials
C) CRP and MRP systems must be constantly reviewed
D) It is wise to re-plan on a weekly basis
E) None of the above
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
54
ABC analysis provides insight into:
A) Total inventory costs
B) Average inventory costs
C) What items account for the most expenditures
D) What items are critical to avoid stock outs
E) High turnover items
A) Total inventory costs
B) Average inventory costs
C) What items account for the most expenditures
D) What items are critical to avoid stock outs
E) High turnover items
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
55
Despite the increased use of JIT systems,there are several benefits or advantages to having inventory,they include:
A) Make possible smooth and efficient operations by decoupling individual segments of the total operation
B) Inventories of parts and components produced in-house facilitates economical production runs in various machine-assembly stations
C) Provides "safety" stock for supply interruptions
D) Finished goods inventory help the marketing/sales department satisfy unexpected customer demand to avoid stockouts
E) All of the above
A) Make possible smooth and efficient operations by decoupling individual segments of the total operation
B) Inventories of parts and components produced in-house facilitates economical production runs in various machine-assembly stations
C) Provides "safety" stock for supply interruptions
D) Finished goods inventory help the marketing/sales department satisfy unexpected customer demand to avoid stockouts
E) All of the above
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
56
Materials Requirements Planning (MRP)is used to determine quantity and timing of required materials under conditions of:
A) Independent demand
B) JIT operations
C) Changing CRP requirements
D) Dependent demand
E) Stable demand
A) Independent demand
B) JIT operations
C) Changing CRP requirements
D) Dependent demand
E) Stable demand
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
57
The output of MRP and CRP systems is transmitted to the manufacturing organization in the form of
A) Order releases and a dispatch list
B) Alternative routings
C) Personnel allocations
D) Work center load reports
E) All of the above
A) Order releases and a dispatch list
B) Alternative routings
C) Personnel allocations
D) Work center load reports
E) All of the above
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
58
Opportunity cost is a measure of:
A) Inventory acquisition cost
B) Cost of services related to purchasing
C) Cost of operating expenses
D) Alternatives for invested funds
E) Activity based costs
A) Inventory acquisition cost
B) Cost of services related to purchasing
C) Cost of operating expenses
D) Alternatives for invested funds
E) Activity based costs
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
59
MRP inventory is usually a function of:
A) Independent demand
B) Dependent demand
C) Static demand
D) Variable demand
E) Average demand
A) Independent demand
B) Dependent demand
C) Static demand
D) Variable demand
E) Average demand
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
60
The buyer-planner concept developed because:
A) The supplier scheduler concept did not work well with MRP
B) In many MRP systems, the buyer is the logical person to issue release orders under long term contracts
C) Reliability in terms of quality and delivery must be monitored daily
D) It facilitates closer relationships with suppliers
E) It helps improve supplier flexibility and reliability
A) The supplier scheduler concept did not work well with MRP
B) In many MRP systems, the buyer is the logical person to issue release orders under long term contracts
C) Reliability in terms of quality and delivery must be monitored daily
D) It facilitates closer relationships with suppliers
E) It helps improve supplier flexibility and reliability
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
61
In MRP systems,the logic of the system answers the inventory question of:
A) Safety stock levels
B) Lead time
C) How much to order
D) When to order
E) The EOQ point
A) Safety stock levels
B) Lead time
C) How much to order
D) When to order
E) The EOQ point
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
62
The cyclical or fixed order interval inventory system is a:
A) Time-based operation with periodic reviews
B) Form of MRP
C) System that works best with dependent demand
D) Control system for low value items
E) Inventory system best used in a job shop
A) Time-based operation with periodic reviews
B) Form of MRP
C) System that works best with dependent demand
D) Control system for low value items
E) Inventory system best used in a job shop
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
63
The key input in the EOQ formula is:
A) Variable costs
B) Tooling costs
C) Overhead costs
D) Sunk costs
E) Incremental costs
A) Variable costs
B) Tooling costs
C) Overhead costs
D) Sunk costs
E) Incremental costs
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
64
Order point or fixed order quantity systems requires the use of:
A) EOQ
B) MRP II
C) Perpetual inventory records per item
D) "Floating" or variable order points per item
E) All of the above
A) EOQ
B) MRP II
C) Perpetual inventory records per item
D) "Floating" or variable order points per item
E) All of the above
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
65
Supplier managed inventories works best for:
A) Production material
B) Direct material
C) A items
D) MRO supplies
E) B items
A) Production material
B) Direct material
C) A items
D) MRO supplies
E) B items
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
66
The major mistake most users commit when calculating EOQ is:
A) Using inaccurate demand numbers
B) Using "sunk" cost figures
C) Using average costs
D) Using standard engineering costs
E) Using the wrong labor rates
A) Using inaccurate demand numbers
B) Using "sunk" cost figures
C) Using average costs
D) Using standard engineering costs
E) Using the wrong labor rates
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
67
The Just-In-Time (JIT)approach in inventory control is primarily used for:
A) B items
B) A items
C) C items
D) D items
E) E items
A) B items
B) A items
C) C items
D) D items
E) E items
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
68
for the inventory control of personal safety equipment,the most efficient and economical control system is:
A) Two-bin
B) Cyclical
C) MRP
D) Flow control
E) JIT
A) Two-bin
B) Cyclical
C) MRP
D) Flow control
E) JIT
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck