Deck 13: Scheduling Operations
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/26
Play
Full screen (f)
Deck 13: Scheduling Operations
1
Scheduling systems answer which all the following questions EXCEPT:
A)What delivery date do I promise?
B)How much will the schedule cost?
C)When should I start each particular activity or task?
D)How do I make sure that the job is completed on time?
A)What delivery date do I promise?
B)How much will the schedule cost?
C)When should I start each particular activity or task?
D)How do I make sure that the job is completed on time?
How much will the schedule cost?
2
For services,the most common priority dispatch rule is:
A)Critical ratio
B)Preemptive rule
C)First come,first served
D)Shortest processing time
A)Critical ratio
B)Preemptive rule
C)First come,first served
D)Shortest processing time
First come,first served
3
Which of the following statements is NOT true about finite capacity scheduling (FCS)?
A)FCS is an extension of Gantt chart methods.
B)FCS requires that jobs are loaded backward from due dates to determine the capacity required at each work center.
C)FCS assumes that jobs are scheduled through a number of work centers,each with one or more machines.
D)In FCS,attention is paid to scarce resources to facilitate job flow and to improve the performance of the shop.
A)FCS is an extension of Gantt chart methods.
B)FCS requires that jobs are loaded backward from due dates to determine the capacity required at each work center.
C)FCS assumes that jobs are scheduled through a number of work centers,each with one or more machines.
D)In FCS,attention is paid to scarce resources to facilitate job flow and to improve the performance of the shop.
FCS requires that jobs are loaded backward from due dates to determine the capacity required at each work center.
4
The theory of constraints (TOC)is:
A)A strategic technique primarily used to reduce waste
B)A strategic technique used to help firms effectively improve the rate at which raw materials are converted to finished goods and then money through sales
C)A strategic technique used to balance capacity across all resources
D)All of the above
A)A strategic technique primarily used to reduce waste
B)A strategic technique used to help firms effectively improve the rate at which raw materials are converted to finished goods and then money through sales
C)A strategic technique used to balance capacity across all resources
D)All of the above
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
5
In the language of theory of constraints,inventory is:
A)The rate at which the system generates money through sales
B)Equal to the number of orders shipped
C)The raw material value of any goods being held in inventory
D)The sales of the plant minus the cost of raw materials used to produce those sales
A)The rate at which the system generates money through sales
B)Equal to the number of orders shipped
C)The raw material value of any goods being held in inventory
D)The sales of the plant minus the cost of raw materials used to produce those sales
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
6
Theory of constraints,as it applies to business systems,is based on which of the following premises?
A)A business has the obligation to consider its responsibility to society.
B)The goal of a business is to make money now and in the future.
C)The goal of a business is to make inventory.
D)The goal of a business is to eliminate all constraints.
A)A business has the obligation to consider its responsibility to society.
B)The goal of a business is to make money now and in the future.
C)The goal of a business is to make inventory.
D)The goal of a business is to eliminate all constraints.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
7
Aggregate planning and scheduling differ in that:
A)The former ensures capacity is efficiently used whereas the latter is the acquisition of resources.
B)The former is short term in nature while the latter is medium term.
C)The former is last in the hierarchy of capacity planning decisions and the latter is first.
D)The former deals with acquiring resources and the latter deals with allocating resources.
A)The former ensures capacity is efficiently used whereas the latter is the acquisition of resources.
B)The former is short term in nature while the latter is medium term.
C)The former is last in the hierarchy of capacity planning decisions and the latter is first.
D)The former deals with acquiring resources and the latter deals with allocating resources.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
8
The overriding problem in batch scheduling is:
A)Regulating input
B)Controlling output
C)Managing queues
D)Assigning labor
A)Regulating input
B)Controlling output
C)Managing queues
D)Assigning labor
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
9
Critical Ratio is:
A)The ratio of processing time to idle time of the process
B)The ratio of remaining time until due date to the remaining processing time
C)Greater than one if the job is behind schedule
D)All of the above
A)The ratio of processing time to idle time of the process
B)The ratio of remaining time until due date to the remaining processing time
C)Greater than one if the job is behind schedule
D)All of the above
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
10
A bottleneck is:
A)A resource that has the maximum capacity in the facility
B)A resource whose capacity is less than the capacity of all other resources and whose capacity is less than the demand placed on it
C)A resource that blocks labor productivity
D)A resource that has the fastest processing time
A)A resource that has the maximum capacity in the facility
B)A resource whose capacity is less than the capacity of all other resources and whose capacity is less than the demand placed on it
C)A resource that blocks labor productivity
D)A resource that has the fastest processing time
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
11
Shortest processing time (SPT)rule means:
A)The job with the least processing time is worked on next
B)The job needed at the bottleneck is worked on next
C)The same as Critical ratio
D)None of the above
A)The job with the least processing time is worked on next
B)The job needed at the bottleneck is worked on next
C)The same as Critical ratio
D)None of the above
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following is NOT determined by Gantt charting?
A)The waiting time of each job
B)Makespan of all jobs
C)Resource utilization
D)Finite capacity scheduling
A)The waiting time of each job
B)Makespan of all jobs
C)Resource utilization
D)Finite capacity scheduling
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
13
The reason(s)for batch scheduling being a complex management problem is/are:
A)Irregular flow of units with many starts and stops
B)Layout of the batch process by machine group or skills into work centers
C)Batches result in inventory or people waiting in queues
D)All of the above
A)Irregular flow of units with many starts and stops
B)Layout of the batch process by machine group or skills into work centers
C)Batches result in inventory or people waiting in queues
D)All of the above
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
14
According to Goldratt:
A)An hour lost at the bottleneck is an hour lost for the entire system.
B)A product coming out of a non-bottleneck is precious and should not be wasted.
C)Maximizing the efficiency of all resources would generate money for the company.
D)Utilization,Productivity,and Operating Expenses are the three vital metrics of a process.
A)An hour lost at the bottleneck is an hour lost for the entire system.
B)A product coming out of a non-bottleneck is precious and should not be wasted.
C)Maximizing the efficiency of all resources would generate money for the company.
D)Utilization,Productivity,and Operating Expenses are the three vital metrics of a process.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
15
Which of the following is a performance measure for a Gantt chart?
A)Makespan
B)Machine utilization
C)Sum of the delivery times for each job
D)All of the above
A)Makespan
B)Machine utilization
C)Sum of the delivery times for each job
D)All of the above
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
16
Lead time for completion of a job is a function of:
A)Capacity and demand
B)Capacity and priority decisions
C)Capacity and supply decisions
D)None of the above
A)Capacity and demand
B)Capacity and priority decisions
C)Capacity and supply decisions
D)None of the above
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
17
Use a Gantt chart to schedule the jobs in order 1,2,3 and assume that jobs cannot be split.What is the makespan?
A)12
B)9
C)14
D)3
A)12
B)9
C)14
D)3
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
18
Scheduling deals with which three conflicting objectives?
A)High efficiency,high profits,and short lead-time
B)High profits,low inventories,and good customer service
C)Low inventories,high efficiency,and good customer service
D)Low inventories,good customer service,and short lead-time
A)High efficiency,high profits,and short lead-time
B)High profits,low inventories,and good customer service
C)Low inventories,high efficiency,and good customer service
D)Low inventories,good customer service,and short lead-time
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
19
Finite capacity scheduling assumes which of the following?
A)Jobs cannot be split into two or more parts.
B)Jobs cannot pass each other.
C)More than one job can be scheduled on a machine at a time.
D)Capacity is limited in each work center.
A)Jobs cannot be split into two or more parts.
B)Jobs cannot pass each other.
C)More than one job can be scheduled on a machine at a time.
D)Capacity is limited in each work center.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
20
Which of the following statements is NOT true about the theory of constraints (TOC)?
A)It was developed by Goldratt in his book,"The Goal."
B)Operations should help to increase sales,as long as capacity is available.
C)Identifying the bottleneck in a process is critical for improving the overall flow through the process.
D)Increased utilization of a non-bottleneck would improve the operating performance in a factory.
A)It was developed by Goldratt in his book,"The Goal."
B)Operations should help to increase sales,as long as capacity is available.
C)Identifying the bottleneck in a process is critical for improving the overall flow through the process.
D)Increased utilization of a non-bottleneck would improve the operating performance in a factory.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
21
The Shortest process time (SPT)rule is better at meeting due dates when compared to the Critical Ratio rule.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
22
First come,first served is widely used in both service and manufacturing firms.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
23
Finite Capacity Scheduling can be used to identify the bottleneck in a given process.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
24
What are the steps that could be taken at a bottleneck resource to increase its capacity?
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
25
Throughput is defined as the difference between the sales and the operating expenses of a plant.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
26
Optimal sequencing rules have found widespread use in practice.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck