Deck 10: Supply Chain Management

Full screen (f)
exit full mode
Question
Major product redesign is often needed to make infrastructure improvements in the supply chain.
Use Space or
up arrow
down arrow
to flip the card.
Question
Which of the following is NOT true of vertical integration?

A)Leads to greater flexibility to changing technology
B)Can result in a loss of economies of scale
C)Helps achieve control of the supply chain
D)Reap the profits of the supplier or distributor when there is an attractive return from the investment
Question
The flow of materials from upstream nodes into a firm is called:

A)Physical supply
B)Physical distribution
C)Demand management
D)None of the above
Question
Which of the following is NOT a characteristic of changes in structure?

A)Are long-range in nature and require considerable capital
B)Include changes in capacity,facilities,process technology,and vertical integration
C)Lead to changes in information systems
D)Are related to bricks and mortar
Question
What are the two fundamental processes in all supply chains that are most affected by the Internet?

A)Electronic interchange and order placement
B)Order fulfillment and order placement
C)B2B exchanges and order fulfillment
D)None of the above
Question
The five measures of supply chain performance are:

A)Cost,quality,flexibility,delivery,and time
B)Cost,quality,time,delivery,and reliability
C)Inventory,quality,time,delivery,and flexibility
D)Inventory,cost,quality,time,and delivery
Question
Which of the following is NOT a form of structural change of the supply chain?

A)Forward and backward integration
B)Creating cross-functional teams
C)Major process simplification
D)Outsourcing logistics to a third party
Question
Which of the following is NOT a specific measure of supply chain performance?

A)Quality
B)Time
C)Innovation
D)Delivery
Question
The average cash-to-cash cycle is defined as:

A)Days in inventory + Days in account receivable + Days in accounts payable
B)Days in inventory - Days in account receivable + Days in accounts payable
C)Days in inventory + Days in account receivable - Days in accounts payable
D)Days in inventory - Days in account receivable - Days in accounts payable
Question
Which of the following is a form of infrastructure change?

A)Process simplification
B)Product redesign
C)Changes in information systems
D)Forward integration
Question
Which of the following is NOT true about supply chain dynamics?

A)The supply chain is a highly interactive system.
B)There is an accelerator effect in the supply chain due to replenishment lead times.
C)The best way to improve the supply chain is to increase the total replenishment time and to feed back actual demand information to all levels.
D)All of the above statements are true.
Question
Which of the following does the Supply Chain Operations Reference (SCOR)model NOT include?

A)Make
B)Deliver
C)Return
D)All of the above are included
Question
Materials handling,transportation,and warehousing are elements of:

A)Logistics
B)Purchasing
C)Demand chain management
D)Fill rate
Question
Which of the following statements is NOT true regarding supply chain operations?

A)All elements of the supply chain are interconnected and dependent on each other.
B)Demand changes by the end user can create a bullwhip effect in the supply chain.
C)With perfect information at all levels of the supply chain,there will not be a bullwhip effect.
D)Time lags in the supply chain serve to create fluctuations in orders and inventories.
Question
Which of the following is a way to improve the infrastructure in the supply chain?

A)Forward and backward integration
B)Setup time reduction
C)Major product redesign
D)Outsourcing logistics to a third party
Question
__________ is a partnership of retailers,wholesalers,and manufacturers aimed at managing both demand and the supply chain.

A)Effective consumer response
B)Effective customer reaction
C)Effective consumer reply
D)Efficient consumer response
Question
Backward or upstream supply chain flows include:

A)Information
B)Monetary payments
C)Materials
D)All of the above
Question
The design and management of seamless,value-added processes across organizational boundaries to meet the real needs of the end customer is called:

A)Demand management
B)Distribution channel management
C)Supply chain management
D)Logistics management
Question
Which of the following is NOT a type of e-procurement?

A)Private exchanges
B)Third party auctions
C)Online catalogs
D)B2B marketplaces
Question
Order placement via the Internet does NOT include:

A)Increasing the accuracy of the order
B)Faster order entry
C)Manufacturing and shipment status
D)Use of an ERP system to schedule production
Question
It is bad to have a negative cash-to-cash cycle in which the firm receives payment before it pays its suppliers.
Question
Demand chain management tries to match supply and demand.
Question
Describe causes of the bullwhip effect.
Question
Final consumers can be found farthest downstream in the supply chain.
Question
In supply chain improvement,it is often necessary to reduce the setup time of equipment dramatically so that smaller lots of the product can be economically produced.
Question
List and define the five ways to change supply chain structure.
A.Engage in forward and backward integration
B.Pursue major process simplification
C.Change the configuration of factories,warehouses,or retail locations
D.Pursue major product redesign
E.Work with third-party logistics providers.
Question
List and define the five ways to change supply chain infrastructure.
A.Cross-functional teams
B.Partnerships
C.Setup time reduction
D.Information systems
E.Cross-docking.
Question
Delivery has three performance measures: on-time delivery,fill rate,and unit cost.
Question
What are the tasks in the purchasing cycle?
Question
The objective of structural and infrastructure changes is the same: To remove sources of uncertainty,to reduce replenishment time,and to reduce total cost of supplying the market.
Question
How can a firm design and develop a more resilient supply chain?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/31
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 10: Supply Chain Management
1
Major product redesign is often needed to make infrastructure improvements in the supply chain.
False
2
Which of the following is NOT true of vertical integration?

A)Leads to greater flexibility to changing technology
B)Can result in a loss of economies of scale
C)Helps achieve control of the supply chain
D)Reap the profits of the supplier or distributor when there is an attractive return from the investment
Leads to greater flexibility to changing technology
3
The flow of materials from upstream nodes into a firm is called:

A)Physical supply
B)Physical distribution
C)Demand management
D)None of the above
Physical supply
4
Which of the following is NOT a characteristic of changes in structure?

A)Are long-range in nature and require considerable capital
B)Include changes in capacity,facilities,process technology,and vertical integration
C)Lead to changes in information systems
D)Are related to bricks and mortar
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
5
What are the two fundamental processes in all supply chains that are most affected by the Internet?

A)Electronic interchange and order placement
B)Order fulfillment and order placement
C)B2B exchanges and order fulfillment
D)None of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
6
The five measures of supply chain performance are:

A)Cost,quality,flexibility,delivery,and time
B)Cost,quality,time,delivery,and reliability
C)Inventory,quality,time,delivery,and flexibility
D)Inventory,cost,quality,time,and delivery
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following is NOT a form of structural change of the supply chain?

A)Forward and backward integration
B)Creating cross-functional teams
C)Major process simplification
D)Outsourcing logistics to a third party
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
8
Which of the following is NOT a specific measure of supply chain performance?

A)Quality
B)Time
C)Innovation
D)Delivery
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
9
The average cash-to-cash cycle is defined as:

A)Days in inventory + Days in account receivable + Days in accounts payable
B)Days in inventory - Days in account receivable + Days in accounts payable
C)Days in inventory + Days in account receivable - Days in accounts payable
D)Days in inventory - Days in account receivable - Days in accounts payable
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
10
Which of the following is a form of infrastructure change?

A)Process simplification
B)Product redesign
C)Changes in information systems
D)Forward integration
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following is NOT true about supply chain dynamics?

A)The supply chain is a highly interactive system.
B)There is an accelerator effect in the supply chain due to replenishment lead times.
C)The best way to improve the supply chain is to increase the total replenishment time and to feed back actual demand information to all levels.
D)All of the above statements are true.
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following does the Supply Chain Operations Reference (SCOR)model NOT include?

A)Make
B)Deliver
C)Return
D)All of the above are included
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
13
Materials handling,transportation,and warehousing are elements of:

A)Logistics
B)Purchasing
C)Demand chain management
D)Fill rate
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
14
Which of the following statements is NOT true regarding supply chain operations?

A)All elements of the supply chain are interconnected and dependent on each other.
B)Demand changes by the end user can create a bullwhip effect in the supply chain.
C)With perfect information at all levels of the supply chain,there will not be a bullwhip effect.
D)Time lags in the supply chain serve to create fluctuations in orders and inventories.
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
15
Which of the following is a way to improve the infrastructure in the supply chain?

A)Forward and backward integration
B)Setup time reduction
C)Major product redesign
D)Outsourcing logistics to a third party
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
16
__________ is a partnership of retailers,wholesalers,and manufacturers aimed at managing both demand and the supply chain.

A)Effective consumer response
B)Effective customer reaction
C)Effective consumer reply
D)Efficient consumer response
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
17
Backward or upstream supply chain flows include:

A)Information
B)Monetary payments
C)Materials
D)All of the above
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
18
The design and management of seamless,value-added processes across organizational boundaries to meet the real needs of the end customer is called:

A)Demand management
B)Distribution channel management
C)Supply chain management
D)Logistics management
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
19
Which of the following is NOT a type of e-procurement?

A)Private exchanges
B)Third party auctions
C)Online catalogs
D)B2B marketplaces
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
20
Order placement via the Internet does NOT include:

A)Increasing the accuracy of the order
B)Faster order entry
C)Manufacturing and shipment status
D)Use of an ERP system to schedule production
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
21
It is bad to have a negative cash-to-cash cycle in which the firm receives payment before it pays its suppliers.
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
22
Demand chain management tries to match supply and demand.
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
23
Describe causes of the bullwhip effect.
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
24
Final consumers can be found farthest downstream in the supply chain.
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
25
In supply chain improvement,it is often necessary to reduce the setup time of equipment dramatically so that smaller lots of the product can be economically produced.
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
26
List and define the five ways to change supply chain structure.
A.Engage in forward and backward integration
B.Pursue major process simplification
C.Change the configuration of factories,warehouses,or retail locations
D.Pursue major product redesign
E.Work with third-party logistics providers.
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
27
List and define the five ways to change supply chain infrastructure.
A.Cross-functional teams
B.Partnerships
C.Setup time reduction
D.Information systems
E.Cross-docking.
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
28
Delivery has three performance measures: on-time delivery,fill rate,and unit cost.
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
29
What are the tasks in the purchasing cycle?
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
30
The objective of structural and infrastructure changes is the same: To remove sources of uncertainty,to reduce replenishment time,and to reduce total cost of supplying the market.
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
31
How can a firm design and develop a more resilient supply chain?
Unlock Deck
Unlock for access to all 31 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 31 flashcards in this deck.